ML20086S221

From kanterella
Jump to navigation Jump to search
Provides Util Position on Stress Improvement of Six Core Spray Sys Welds W/Austenitic Stainless Steel Fittings.Welds Will Be Stress Relieved Utilizing Mechanical Stress Improvement Process During Next Refueling Outage
ML20086S221
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 12/26/1991
From: Zeringue O
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9201030078
Download: ML20086S221 (3)


Text

y

,4 A

Tymwe vect esos, h e on e to. mn nim,, eea yes D. J W Zonngue vo r tan me s uu one<wis e

Docenber 26, 1991 U.S. Nuclear Regulatory Commission ATTN Document Control Desk Washington, D.C.

20555 Centlement In the Matter of

)

Locket No. 50-260 Tennessee Valley Authority

)

BROWNS FERRY NUCL5:AR PLANT (BFN) - UNIT 2 POSITION ON STRESS IMPROVEMENT ON SIX VELDS IN Tile CORE SPRAY SYSTEM Referencet 1.

Letter from TVA to NRC, dated September 20, 1991, " Status and Schedule for Completion of Unit 2 Post-restart Issues" 2.

Letter from TVA to NRC, dated August 1, 1988: " Response to Generic Letter 88-01, NRC Position on ICSCC in hWR Austenitic Stainless Steel Piping," dated January 25, 1988 The _ purpose of this letter provides the BFN Unit 2 position on stress improvement of six Core Spray System velds with austenitic stainless steel fittings.

In Reference 1 Section 7.0, TVA committed to perform induction heating stress improvement (111S1) on the subject velds.

Ilovever, after evaluating the technical merit of this type of stress improvement, TVA has determined that a mechanical stress improvement process will be utilized as the stress improvement method rather than 111SI,_as previously stated in References 1 and 2.

The enclosure contains the revised post-restart commitment for the six velds in the Core Spray System with austenitic stainless steel fittings, i

9201o30078 911226 Poa nocck o,ooouo b

l l

P PDR 1

)

)

._.____..m_____

3 December zu,r Utculatory Commission

'll S. Nuclea 1991 If there are icy questions, please contact R. R. Baron at (20$) 729-7506.

Sincerely, t

6 s

\\

}M/f24

0. J. Zeringue Enclosure cc (Enclosure):

HRC Resident Inspector Browns Ferry Nuclear Plant Route 12. Box 637 Athens, Alabama 35611 Mr. Thierry M. Ross, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 115$$ Rockville Pike Rockville, Maryland 20852 Mr. B. A. Wilson, Project Chief U.S. Nuclear Regulatory Commissfon ReElon !!

l 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 l

I

+

3 4----

3 m

y v

v.

a e

e 1:NC1,0SURI:

COMMITHENT SUIMARY Six velds in the Core Spray Sys+

.ith austenttic stainless oteel fittings vill be stress relieved utiliziht

'.e mechanical stress improvement process during the next refueling outage.