ML20086S405
| ML20086S405 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 07/26/1995 |
| From: | Dennis Morey SOUTHERN NUCLEAR OPERATING CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20086S408 | List: |
| References | |
| NUDOCS 9508010216 | |
| Download: ML20086S405 (1) | |
Text
-.
Southem Nuclear Operating Company a
. Post Office Box 1295 t
'D
.b Birmingham. Alabama 35201 ij
. Telephone (205) 868-5131 Southem Nudear Operating Company o... uer.y
_ Vice President Farley Project the southem electnc System July 26, 1995 I
t Docket No.:
50-364-U. S. Nuclear Regulatory Commission ATfN.: Document Control Desk Washington, D. C. 20555 g
Joseph M. Farley Nuclear Plant - Unit 2 Steam Generator Tube Interim Repair Criteria Data Report Ladies and Gentlemen:
In order to receive a voltage-based interim repair criteria for outside diameter stress corrosion cracking at tube support plate intersections, Southern Nucl-ar committed to submit the information required by draft Geocric Lettero- ', " Voltage-Based Repair Criteria for the Repair of Westinghouse Steam Generate-
. A&cted by Outside Diameter Stress Corrosion Cracking."
The required information is prosided in the attached report.
If there are any questions, please ad5ise.
Respectfully submitted, hh4 Dave Morey
/
REM /maf:IPCRPRT. DOC i
Attachment t-cc:
Mr. S. D. Ebneter Mr. B. L. Siegel
.j Mr. T. M. Ross Mr. T. A. Reed i
I G1Gi:C s fu t ;
9508010216 950726 PD.7 ADOCK 05000364 P
PDR 1