ML20086S405

From kanterella
Jump to navigation Jump to search
Forwards Farley Unit 2 1995 Interim Plugging Criteria 90 Day Rept
ML20086S405
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 07/26/1995
From: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20086S408 List:
References
NUDOCS 9508010216
Download: ML20086S405 (1)


Text

-.

Southem Nuclear Operating Company a

. Post Office Box 1295 t

'D

.b Birmingham. Alabama 35201 ij

. Telephone (205) 868-5131 Southem Nudear Operating Company o... uer.y

_ Vice President Farley Project the southem electnc System July 26, 1995 I

t Docket No.:

50-364-U. S. Nuclear Regulatory Commission ATfN.: Document Control Desk Washington, D. C. 20555 g

Joseph M. Farley Nuclear Plant - Unit 2 Steam Generator Tube Interim Repair Criteria Data Report Ladies and Gentlemen:

In order to receive a voltage-based interim repair criteria for outside diameter stress corrosion cracking at tube support plate intersections, Southern Nucl-ar committed to submit the information required by draft Geocric Lettero- ', " Voltage-Based Repair Criteria for the Repair of Westinghouse Steam Generate-

. A&cted by Outside Diameter Stress Corrosion Cracking."

The required information is prosided in the attached report.

If there are any questions, please ad5ise.

Respectfully submitted, hh4 Dave Morey

/

REM /maf:IPCRPRT. DOC i

Attachment t-cc:

Mr. S. D. Ebneter Mr. B. L. Siegel

.j Mr. T. M. Ross Mr. T. A. Reed i

I G1Gi:C s fu t ;

9508010216 950726 PD.7 ADOCK 05000364 P

PDR 1