Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20087P318 + (18:51:29, 13 December 2024)
- ML20087P312 + (18:51:30, 13 December 2024)
- ML20087P311 + (18:51:31, 13 December 2024)
- ML20087P301 + (18:51:31, 13 December 2024)
- RBG-17-474, Suppls Util 830831 & 840227 Responses to Generic Ltr 82-33, Suppl 1 to NUREG-0737 Requirements for Emergency Response Capability. Procedure 1-ADM-3-9 Replaced w/OSP-0009. Contents Remain Unchanged + (18:51:32, 13 December 2024)
- 05000416/LER-1984-011, :on 840309,arcing Occurred in 500 Kv Switchyard Breaker,As Breaker Returned to Svc After Maint.Cause Unknown.Phase B of Breaker Being Completely Overhauled + (18:51:34, 13 December 2024)
- ML20087P288 + (18:51:35, 13 December 2024)
- ML20087P280 + (18:51:36, 13 December 2024)
- 3F0384-17, Forwards Response to IE Bulletin 83-07 Re Apparently Fraudulent Products Sold by Ray Miller,Inc.Several Matls Supplied by Ray Miller Reviewed,But None Identified as Fraudulent + (18:51:37, 13 December 2024)
- ML20087P269 + (18:51:38, 13 December 2024)
- ML20087P266 + (18:51:38, 13 December 2024)
- ML20087P264 + (18:51:39, 13 December 2024)
- CNL-20-003, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (BFN-TS-516) + (18:51:40, 13 December 2024)
- ML20087P259 + (18:51:41, 13 December 2024)
- ML20087P258 + (18:51:42, 13 December 2024)
- ML20087P256 + (18:51:43, 13 December 2024)
- 3F0384-10, Responds to IE Bulletin 83-08 Re Electrical Circuit Breakers W/Undervoltage Trip Feature in Use in safety-related Applications Other than Reactor Trip Sys.Ge or Westinghouse Type Breakers Used Only as Reactor Trip Breakers + (18:51:44, 13 December 2024)
- ML20087P248 + (18:51:44, 13 December 2024)
- ML20087P246 + (18:51:45, 13 December 2024)
- ML20087P245 + (18:51:46, 13 December 2024)
- TXX-4134, Comments on Containment Sump Isolation Valves & Recommendations Made in Cygna Independent Assessment Program Rept Re Cable Tray Supports & Anchor Bolt Embedment Lengths. Std Set of Instructions for Supports Expected by 840501 + (18:51:47, 13 December 2024)
- ML20087P238 + (18:51:48, 13 December 2024)
- ML20087P240 + (18:51:48, 13 December 2024)
- ML20087P237 + (18:51:49, 13 December 2024)
- ML20087P234 + (18:51:50, 13 December 2024)
- ML20087P233 + (18:51:52, 13 December 2024)
- ML20087P230 + (18:51:53, 13 December 2024)
- ML20087P229 + (18:51:54, 13 December 2024)
- ML20087P219 + (18:51:55, 13 December 2024)
- TXX-4142, Forwards Updated Schedule for Responses to SER Outstanding Issues,Confirmatory Issues & Licensing Conditions.Issues Include TMI Items III.A.1.2 Re Emergency Support Facilities, III.A.2 Re Emergency Preparedness & I.D.1 + (18:51:55, 13 December 2024)
- ML20087P218 + (18:51:56, 13 December 2024)
- ML20087P216 + (18:51:57, 13 December 2024)
- SNRC-1033, Forwards Response to Questions Raised at NRC 840328 Meeting in Bethesda,Md Re Supplemental Motion for Low Power Ol.Addl Responses Concerning Containment Isolation,Containment Heatup & Loca,App K Analysis Will Be Forwarded + (18:51:58, 13 December 2024)
- ML20087P206 + (18:51:59, 13 December 2024)
- ML20087P205 + (18:51:59, 13 December 2024)
- ML20087P202 + (18:52:00, 13 December 2024)
- L-17-103, Rev 0 to Statistical Evaluation of Postulated Flaws at Brunswick Steam Electric Plant,Unit 1 + (18:52:01, 13 December 2024)
- ML20087P198 + (18:52:02, 13 December 2024)
- ML20087P196 + (18:52:03, 13 December 2024)
- ML20087P195 + (18:52:03, 13 December 2024)
- ML20087P193 + (18:52:04, 13 December 2024)
- B11089, Summarizes 840314 Meeting W/Nrc in Bethesda,Md Re 13 Draft SER Open Items (Encl).Addl Info Re Confirmatory Items Will Be Submitted as Available + (18:52:05, 13 December 2024)
- ML20087P188 + (18:52:05, 13 December 2024)
- AECM-84-0177, Responds to IE Bulletin 83-08, Electrical Circuit Breakers...Reactor Trip Sys. GE Confirmation of Supplying Eight safety-related Breakers W/Undervoltage Trip Features Still Pending.Extension Until 840601 Requested + (18:52:07, 13 December 2024)
- 05000370/LER-1984-007, :on 840119,leak Check of in-core Detectors Not Performed within 31 Days Prior to Installation.Caused by Personnel Error & Procedural Deficiency.Procedure Revised. Personnel Counseled + (18:52:09, 13 December 2024)
- ML20087P172 + (18:52:11, 13 December 2024)
- B11073, Clarifies Info on TMI Action Item II.F.1.6 Re Hydrogen Monitor Measurement Capabilities.Ser & 830314 Confirmatory Order Should Be Revised to Reflect Status.Item Completed + (18:52:12, 13 December 2024)
- 0CAN038407, Responds to NRC Re Violations Noted in IE Insp Repts 50-313/84-01 & 50-368/84-01.Corrective Actions:Current Work Planning Staff Being Augmented to Strengthen Maint Planning Function + (18:52:12, 13 December 2024)
- ML20087P162 + (18:52:13, 13 December 2024)
- ML20087P158 + (18:52:14, 13 December 2024)
- ML20087P159 + (18:52:14, 13 December 2024)