Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- BECO-92-039, Application for Amend to License DPR-35,changing TS Section 4.7 Re Primary Containment Integrity to Remove Words Each Operating Cycle for MSIV & Personnel Airlock Door Testing + (17:34:10, 13 December 2024)
- ML20091E425 + (17:34:11, 13 December 2024)
- ML20091E427 + (17:34:11, 13 December 2024)
- ML20091E419 + (17:34:12, 13 December 2024)
- 05000324/LER-1992-002-03, :on 920317,HPCI Sys Automatic Isolation Occurred,Resulting in Isolation Signal to HPCI B Logic. Caused by Personnel Error & Differences in Order in Which Temp Switches Heated.Switch Labels Replaced + (17:34:14, 13 December 2024)
- ML20091E414 + (17:34:15, 13 December 2024)
- 05000348/LER-1984-011, :on 840501,train B Svc Water Battery Declared Inoperable.Caused by Cell 42 Having Specific Gravity Below Limits.Affected Cell & Two Neighboring Cells Replaced + (17:34:16, 13 December 2024)
- ML20091E409 + (17:34:17, 13 December 2024)
- RBG-17-884, Interim Deficiency Rept DR-154 Re High Voltage Cable Terminations.Next Rept Will Be Submitted by 840802 + (17:34:18, 13 December 2024)
- ML20091E401 + (17:34:19, 13 December 2024)
- RBG-17-892, Final Deficiency Rept DR-170 Re Fuel Oil Pipe Support on Standby Diesel Generator Supplied by Tdi.Conditions Determined Not Reportable Under 10CFR50.55(e) + (17:34:19, 13 December 2024)
- ML20091E400 + (17:34:20, 13 December 2024)
- ML20091E396 + (17:34:21, 13 December 2024)
- TXX-4175, Final Deficiency Rept SDAR-134 Re Rodent Damage to Class IE Cables.Initially Reported on 840426.Condition Determined Not Reportable Under 10CFR50.55(e) + (17:34:21, 13 December 2024)
- ML20091E383 + (17:34:22, 13 December 2024)
- 3F0492-05, Monthly Operating Rept for Mar 1992 for Crystal River Unit 3 + (17:34:23, 13 December 2024)
- ML20091E375 + (17:34:23, 13 December 2024)
- ML20091E355 + (17:34:24, 13 December 2024)
- ML20091E350 + (17:34:25, 13 December 2024)
- ML20091E351 + (17:34:25, 13 December 2024)
- 0CAN049206, Provides Discussion of Causes & Corrective Actions of LER, Dtd 911105,re Conditions Which Could Jepordize Capability of Offsite Power Source to Meet Requirements of 10CFR50,App a, General Design Criteria 17 + (17:34:26, 13 December 2024)
- ML20091E344 + (17:34:27, 13 December 2024)
- ML20091E338 + (17:34:28, 13 December 2024)
- ML20091E331 + (17:34:32, 13 December 2024)
- ML20091E335 + (17:34:32, 13 December 2024)
- B11200, Advises That Preparations Underway to Dispose of Thermal Shield Segments at Richland,Wa Low Level Waste Disposal Site,Not Barnwell,Sc,As Previously Proposed.Shield Currently Stored Onsite + (17:34:33, 13 December 2024)
- ML20091E316 + (17:34:34, 13 December 2024)
- ML20091E308 + (17:34:34, 13 December 2024)
- ML20091E302 + (17:34:35, 13 December 2024)
- ML20091E300 + (17:34:36, 13 December 2024)
- ML20091E294 + (17:34:37, 13 December 2024)
- ML20091E290 + (17:34:39, 13 December 2024)
- ELV-03502, Advises That Test for Process Effluent Radiation Monitors That Interface W/Spds Complete & Addl Testing for Perms Not Required + (17:34:40, 13 December 2024)
- 05000316/LER-1984-010, :on 840429 & 0501,automatic Actuation Occurred on Containment Ventilation Isolation Sys Train a When Air Particulate Radiation Monitoring Channel VRS-2301 Exceeded High Alarm Setpoint.Caused by Low Setpoint + (17:34:42, 13 December 2024)
- ML20091E283 + (17:34:43, 13 December 2024)
- BECO-91-138, Forwards Inservice Insp Summary Rept for Refuel Outage (RFO) 8 at Pigrim Nuclear Power Station Unit 1, GE Insp Svcs Invessel Visual Insp Eighth RFO & Inservice Insp Eighth RFO Final Repts for Period 890323-910814 + (17:34:44, 13 December 2024)
- ML20091E281 + (17:34:44, 13 December 2024)
- ML20091E278 + (17:34:45, 13 December 2024)
- ML20091E269 + (17:34:46, 13 December 2024)
- ML20091E274 + (17:34:46, 13 December 2024)
- ML20091E268 + (17:34:47, 13 December 2024)
- ML20091E258 + (17:34:48, 13 December 2024)
- ML20091E266 + (17:34:48, 13 December 2024)
- ML20091E256 + (17:34:49, 13 December 2024)
- ML20091E252 + (17:34:50, 13 December 2024)
- ML20091E249 + (17:34:50, 13 December 2024)
- ML20091E243 + (17:34:51, 13 December 2024)
- ML20091E225 + (17:34:52, 13 December 2024)
- SNRC-1938, Provides Points of Clarification to Joint Contingency Plan & Status Rept of Responses to Assignment Ltrs Sent to Contractors Providing Svcs Shown in + (17:34:52, 13 December 2024)
- ML20091E214 + (17:34:53, 13 December 2024)
- ML20091E201 + (17:34:54, 13 December 2024)
- ML20091E207 + (17:34:54, 13 December 2024)