Download: ML20091E375 (2)


Text

.

c.

W$LF CREEK

- NUCLEAR OPERATING CORPORATION

.l Bart D. Withers Preskient end April 8, 1992 Chief Executive 0+heer i

VM 92-0050 U. S. Nuclear Regulatory Comm!ssion

. ATTN: Document Control Desk Mail Station F1-137 Vashington, D. C.

20555

Reference:

1) Letter WM 92-0002 dated January 6, 1992 from B. D. Vithers, WCNOC, to R. D. Martin, NRC
2) Letter NO 92-0010 dated January 15, 1992 from J. A. Bailey, WCNOC to the NRC

Subject:

Docket No. 50-482:

Revised Schedule for Completion of Commitments Gentlemen:

The purpon of thie letter is to provide a revised schedule for the completion of actions committed to in the references.

The revised schedule is primarily due to an unscheduled outage that began on February 19._

1992 and continued:through March 27, 1992. The resources necessary to meet these L

commitmente were required in support of -the unscheduled _ outage.

The L

extension of these cornmitments was discussed between Mr.

S.

G.

Wideman, p

Supervi'sor Licensing and Mr. G. A. Pick, Senior Resident Inspector, NRC on March 30, 1992.

Reference 1 committed to review and implement enhancements to the operability determination process byP ch 31, 1992.

Various Wolf Creek Nuclear Operating Corporation (WCNOC.

disciplines have.

reviewed-the available guidance on nonconforming conditions and operability and

- determined the need ti enhance the entire process.

Due to this expanded scope. and the unscheduled outage, the effort will be completed by May 29, 1992.

4 Reference 2 transmitted a License Event Report 91-017-01 concerning a Fuel Building /Auxi'iary Building pressure boundary door found open without a continuous' watch having been established. As part of the corrective actions y

~ associated with this event, WCNOC committed to evaluate and implement _any l-

< additional long-term programmatic enhancements by March 31, _ 1992.

An administrative procedure has. been drafted which provides the necessary.

controls for doors utilized to prevent a breach in a fire barrier, fire zone L

barrier, pressure boundary or security barrier.

The reviews of the l

procedure are in process and will be completed by April 30.-1992.

9204140!57 "2t%O8 PDR ADOCK 05000482

\\

P PDR P0. Box 411 ! Ourhngtog KS 66839 i Phone: (316) 364 8831 Ih An Equal opportundy Employer M F HCArf f

g 1

.= 4 e+

n

+

\\M'92-0050 Page 2 s

If you have any questions concerning this matter, please contact me or Mr. S. G. Videman of my 4taff.

Very truly yours, I

Bart D. Withers President and Chief ' Executive Officer BDWlaem cc:

A. T. Howell (NRC)

R. D. Martin (NRC)

G. A. Pick (NRC)

W. D. Reckley (NRC)

___---.__.__--_--_--_..____---____-_._-__-____..-__.--...___--..__--_---____-._-.-_____.___._-_--__._----____---__-a