Text
..
s.
Northem States Power Con'.pany 414 Nicollet Matt Minneapohs, Mnnesota 56401 1927 Telephone (612) 330 5500 April b,-1992 Monticello Technical Specifications Section 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 HONTICELLO NUCLEAR GENERATINC PLANT Docket No. 50-263 License No. DPR 22 Monthly Operating Report March. 1992 Attached is the Monthly Operating Report for March, 1992 for the Monticello Nuclear Cenerating Plant.
7N1 4
('hornas M arker Manager Nuclear Support Service TMP/mk1 C: ( LDirector,' 0ffi9e, of. Resource Management
' Regional Administrator III. NRC
- NRR Prcject Manager, NRC NRC Resident Inspector State of Minnesota - Kris Sanda Attachment N
A C
g g
JJuu u
PDR lll m
f OPERATING DATA REPORT l
.1 DOCKET NO.
50-263 l
DATE ~1-92.
- COMPLETED BY' H.
H.- Paustian-t TELEPHONE 612/295-5151
- OPERATING STATUS
} Notes
]
tl.LUnit-Name=:-
Monticello
]
l-
'2.
Reporting! period:
March
]
]
' 3. Licensed Thernal Power - (MWt) :
1670
)
11 f4. Nameplate Rating (Gross MWe):
_569
)_
)
- 5. Design Electrical Rating-(Net MWe):-
545.4
]
1 6.-Maximum-Dependable Capacity (Gross MWe) : __564
)
)
.7. Maximum Dependable Capacity (Net MWe)a 536
)
J-8.-IffChanges Occur in Capacity _ Ratings (Items Number 3 Through 7) Since Last
)
Report, Give Reasons:
-9.l Power Leve] To Which Restricted, If Any (Net MWe):
N/A 10.: Reasons.For Reetrictions, If=Any: __N/A THIS MONTH YR.-TO-DATE CUMULATIVE
.11. Hours In Reporting Period 744 2184
' 181921
12.' Number Of Hours-Reactor Was Critica.
744,0 2115.1 145533.5-13.' Reactor 1 Reserve Shutdown Hours 0.0 0.0 940.71 14; Hours Generator On-Line 744,0 2096.8 142844.7
'15.* Unit' Reserve Shutdown Hours 0.0 0.0 0.0
'16. Gross--Thermal-Energy Generated (MWH) 1240606 3478150 219011727
- 17. Gross Electrical-Energy Generated'(MWH)-418603 1172014 74061859
<18'.' Net Electrical Energy Generated (MWH) 403136 1127646 70829864
- 19. Unit Service Factor-100.0%
96.0%
78.5%
120.: Unit Availability-Factor 100.0%
96,0%
78.5%
- 21.:LUnit Capacity Factor (Using MDC Net) 101.1%
96.3%
72.6%
- 22.
- : Unit l Capacity Factor (Using DER Net) 99.3%-
94.7%
71.4%
J23.. Unit Forced Outage Rate 0.0%
3.2%
3.9%
"24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and-Duration of Each).
- Refueling Outage - 1/6/93 - 56 days i
h25. If Shut'Down At-End Of Report Period, Estimated-Date Of Startup:N/AL.
. 26. Units-In Test Status (Prior'to Commercial Operation): N/A Forecast Achieved-INITIAL-CRITICALITY p
INITIAL ELECTRICITY COMMERCIAL OPERATION I
,-,,i,-,,, -.,
.w,
,_an n-,,
s---
w
. _ _. _. - ~ ~ _... _ _. _
,J.
- q -
AVERAGE DAILYLUNIT' POWER LEVEL DOCKET NO.
50-263 UNIT Monticello___
DATE 4-1 _3 COMPLETED BY H. H. Paustian-TELEPHONE 612/295-5151-U h
? MONTH OF- -March
'I DAY
- AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)-
(MWe-Net)
- 12
- 544, 17
- 542, 2--
539; 18 543.
3
- 543,19-543.
4-544.
2C 53C.
5:
~541.
-21 546.
6 --
542.
22 537._
s
=7-
- 545, 23 543.
.8 540.
24
- 53 9.-
(
9 544.
25 544.
10 542.
26 540.
lli 542.
27 547._
12 5 4 0~.
28' 545.
113
- 540, 29 536.
- - 14 543.
-30 543.
15
- 544, 31 541.
16
~541.
l:
INSTRUCTIONS Onithis-format, list the average daily ur:it power level in MWe-Net for each
" day-:in the reporting _ month.
Compute to the nearest whole megawatt,
l NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-263 DATE 4-1-92 COMPLETED BY H. H.
Paustian TELEPHONE 612/295-5151 MONTH MAR 3-1-92 to Power operation.
3-31-92 s.
4 s
Note: Power operation defined as essentially 100% of rated power except for weekend load drops frr specified surveillance testing.
9 s
[
'~;.
UllIT SIRFITOW!G AfD IOWER THTTIOfB
' DOCKET ID.^
253
-C tREIT tVFE L1celko DATE 4-01 '.
COGLETED BY
. H. Paustlan REPORT }C M Furch TELEPH0tE _612/295-5151
'3 Ib.
D6te Tvpe Duration Reason
. Method
.. IER System Camp.
.Cause'& Corrective
~[1)
.(hours)
(2) ~ Shutdown
- (4)
-(5).
Prevent Recurrence of.
Ib.
. Code-Code Action to (3):
tbne r
?
1 2
3 4
F: Forced Reason:
Method:
Draft IEEE Standard; S: Scheduled A-Equipni er.t Failure ' (Explain) 1-Manual 805-1984(P805-D5)
B-Fbintenance or Test 2-lunual Scram.
C-Refueling-3-Autcrr2 tic. Scram 5
D-R lator Restriction 4-Other (Explain)
IEEE Standard 803A-1983 E
rat;cr Training & License Examination F-ninistra Ive -
y t
rationa. Error (Explain)
-H-her { Explain);
1
.. L i
m.
~...
.-