Interim Deficiency Rept DER 83-53 Re Embed Plates Not Meeting Spec of Wpp/Qci Requirements.Due to Extensive Investigation & Evaluation,Final Rept Delayed Until 841019
ML20091E400
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 05/17/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-29532-TDS, DER-83-53, NUDOCS 8406010226
Download: ML20091E400 (2)


Text

. b' Ali7ona Public Service Company May 17, 1984 AtGP-29532 -TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 83-53 A 50.55(e) Potentially Reportable Deficiency Relating To Unit 3 Embed Plates Do Not Meet Specification Of WPP/QCI Requirements.

File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between P. Narbut and R. Tucker on August 1, 1983.

(B) ANPP-27597, dated August 26, 1983 (Interim Report)

(C) ANPP-28323, dated November 30, 1983 (Interim Report)

(D) ANPP-28799, dated February 6, 1984 (Interim Report)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), and Interim Reports were transmitted by Reference (B), (C) and (D).

At that time, it was estimated that a Final Report would be available by May 21, 1984.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by October 19, 1984, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours, f'

d J Q

q L

L-CW_

qQ m

E. E. Van Brunt, Jr.

APS Vice President, Nuclear ANPP Project Director EEVB/TRB:db cc: See Page Two 8406010226 840517 PDR ADOCK 05000530 S

PDR

/[ Q yQ

?

Mr. T. W. Bishop DER 83-53 Page Two cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission W&shington, D. C. 20553 T. G. Woods, Jr.

D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers B. S. Kaplan L. A. Souza D. E. Fowler J. Vorees J. R. Bynum J. M. Allen P. P. Klute A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli S. R. Frost J. Self D. Canady Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, CA 30339 T