Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20091K568 + (17:13:15, 13 December 2024)
- RBG-36-263, Forwards Requests for Relief RR0007,RR0010 & RR0012B to ISI Plan.Revs Correct Typos + (17:13:16, 13 December 2024)
- ML20091K565 + (17:13:17, 13 December 2024)
- ML20091K553 + (17:13:18, 13 December 2024)
- ML20091K546 + (17:13:20, 13 December 2024)
- ML20091K537 + (17:13:21, 13 December 2024)
- ML20091K536 + (17:13:21, 13 December 2024)
- ML20091K532 + (17:13:22, 13 December 2024)
- ML20091K531 + (17:13:23, 13 December 2024)
- LIC-95-0164, Forwards Rev 9 of FCS Site Security Plan.Encl Withheld + (17:13:24, 13 December 2024)
- ML20091K517 + (17:13:25, 13 December 2024)
- ML20091K503 + (17:13:26, 13 December 2024)
- ST-HL-AE-3979, Forwards Oqa Plan Change Notice QA-004 to Rev 9 to Operations QA Plan, to Be Incorporated in Annual Update.No Reduction in Plan Effectiveness & No Unreviewed Safety Question Exist + (17:13:26, 13 December 2024)
- ML20091K499 + (17:13:27, 13 December 2024)
- ML20091K497 + (17:13:29, 13 December 2024)
- ML20091K487 + (17:13:30, 13 December 2024)
- ML20091K486 + (17:13:30, 13 December 2024)
- 05000414/LER-1991-016-02, :on 911209,pressurizer PORV Remained Closed Due to Separation of Stem from Wedge Assembly.Caused by Equipment Failure.Valve Replaced,Failed Stem Analyzed & Valves Verified After Valve Strokes + (17:13:32, 13 December 2024)
- ML20091K481 + (17:13:33, 13 December 2024)
- ML20091K473 + (17:13:34, 13 December 2024)
- PY-CEI-NRR-1437, Forwards Rev 1 to Inservice Examination Program, Revising Exam Methods & Adding Required Exams + (17:13:35, 13 December 2024)
- ML20091K463 + (17:13:38, 13 December 2024)
- ML20091K464 + (17:13:38, 13 December 2024)
- ML20091K424 + (17:13:39, 13 December 2024)
- ML20091K437 + (17:13:39, 13 December 2024)
- ML20091K421 + (17:13:40, 13 December 2024)
- ML20091K419 + (17:13:41, 13 December 2024)
- ML20091K420 + (17:13:41, 13 December 2024)
- 05000388/LER-1984-004-01, :on 840501,during Shutdown W/Nonirradiated Fuel,Esf Actuations Occurred While Installing Test Equipment in Div 11 Primary Containment Isolation Sys Circuitry.Caused by Grounded Leads + (17:13:43, 13 December 2024)
- ML20091K412 + (17:13:45, 13 December 2024)
- ML20091K407 + (17:13:46, 13 December 2024)
- 05000353/LER-1995-007, :on 950720,inadvertent Grounding of Keyswitch During Replacement Resulted in Actuations of Units Primary Containment & Rv Isolatioin Control Sys Due to Unclear Mgt Expectations.Conducted Mgt Meeting W/Maint Division + (17:13:48, 13 December 2024)
- ML20091K404 + (17:13:49, 13 December 2024)
- ML20091K401 + (17:13:50, 13 December 2024)
- ML20091K399 + (17:13:51, 13 December 2024)
- ML20091K397 + (17:13:51, 13 December 2024)
- ML20091K395 + (17:13:52, 13 December 2024)
- ML20091K391 + (17:13:52, 13 December 2024)
- ML20091K389 + (17:13:53, 13 December 2024)
- ML20091K385 + (17:13:54, 13 December 2024)
- ML20091K383 + (17:13:54, 13 December 2024)
- ML20091K382 + (17:13:56, 13 December 2024)
- ML20091K375 + (17:13:56, 13 December 2024)
- ML20091K369 + (17:13:57, 13 December 2024)
- RBG-36-239, Responds to Generic Letter 88-20.Util Currently Performing IPE Utilizing Level I PRA Based on Methodology Provided in NUREG/CR-4550 + (17:13:57, 13 December 2024)
- ML20091K366 + (17:13:58, 13 December 2024)
- 2CAN058410, Monthly Operating Rept for Apr 1984 + (17:13:59, 13 December 2024)
- ML20091K358 + (17:13:59, 13 December 2024)
- ML20091K352 + (17:14:00, 13 December 2024)
- ML20091K351 + (17:14:01, 13 December 2024)
- RC-95-0221, Suppl to TS Change TSP 950006 Re Compatibility W/Plant Operating Experience & Consistent W/Gl 93-05 + (17:14:01, 13 December 2024)
- NRC-20-0018, Enrico Fermi Atomic Power Plant, Unit 1, Decommissioning Funding Status Report + (17:14:02, 13 December 2024)