Responds to 840412 Request for Info Re Implementation of NUREG-0737,TMI Action Item II.K.3.16, Reduction of Challenges & Failures of Relief Valves. Unit 1 Converted to two-stage Safety Relief Valves in 1978
ML20091K463
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 06/01/1984
From: Gucwa L
GEORGIA POWER CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.K.3.16, TASK-TM NED-84-253, TAC-45595, TAC-45596, NUDOCS 8406070085
Download: ML20091K463 (3)


Text

Georg!a Power Corepany

.g 333 Piednont Avenue Atlanta. Georgia 30308

/

Telephore 404 5266526 Mail.ng Addre.ss:

Post Offi e Bo/ 4545 A!!anta, Gaorga 30302 Georgia Power L T. Gucwa the saurnem elecinc sys:em Manager Nuclear E' greer rg and Chief Nuclear Ei Ter NED-84-253 JLine 1, 1984 Director of M1 clear Reactor Reg.11ation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 Division of Licensirg U. S. M1 clear Reg.11atory Comnission Washirgton, D. C.

20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDNIN I. HATCH NUCIEAR PLANI UNITS 1, 2 NURBG 0737 ITEM II. K. 3.16, REDUCPION OF CHALLDGES AND FAILURES OF RELIEF VALVES Gentlemen:

In response to your letter of April 12, 1984, Georgia Power Cortpany (GPC) prr>vides the followirg information on Plant Hatch implementation of the albject 'IMI action plan item.

M1mberirg below corresponds to g2estions posed in your letter.

(1) which, if any, of the staff reconnended modifications have been implemented?

RESPOtEE:

Staff reconnendation #1, Iow-Iow Set (LIS) relief logic, has been implemented on Unit 2.

LIS relief logic will be implemented on Unit 1 dirity an cutage schedlled to begin in September, 1984.

Unit 2 Technical Specification revisions and related technical details were sent to the NRC in albnittals dated Febulary 23, 1983, and April 19, 1983.

Similar charges for the Unit 1 Tech Specs will be subnitted in conjunction with the modifications to Unit 1.

Staff reconnendation #2, lowered water level setpoint for MSIV closure from Ievel 2 to Level 1, was inplemented on Unit 2 in conjunction with LIS relief logic modifications.

Modifications to Unit 1 will be inplemented in conjunction with the LIS relief logic modifications dirirg an outage sched11ed to begin in Septenber,1984.

f Ei' 588PJegg, PDR

GeorgiaPower d Director of M1 clear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 Jiane 1,1984 Page 2 Staff recomendation #3, increased simer margin, is not alrrently being

' considered.

We believe Plant Hatch has adegaate simer margin and further increase is not justified.

Staff recomendation #4, preventative maintenance program, has been implemented through servicing of the Safety Relief Valves (SRVs) by Target Rock Corporation dirirg periodic recertification of the valves at Wyle Labs. Target Rock proced2res for SRV maintenance are periodically revised to be alrrent with Service Information Letters (SILs),

recomendations from the Target Rock technical staff, and requirements of NIC Bulletins.

(2) Which, if any, of the staff recomended modifications you propose to implement.

RESPOEE:

All staff recomended modifications except #3, (imreased simer margin) will be implemented as discussed in the response to yalr glestion #1.

(3)-Whether you have implemented or propose to inplement any of the other mdifications or actions disaissed in NURm-0737, Item II. K.

3. 16 or in the BWR Owners Group (BWROG) report.

RESIONEri :

1 Of the thirteen modifications listed in NUREG-0737 Item II. K. 3. 16, GPC has conchided that none are appropriate for Plant Hatch.

GPC participated in the BWROG evahlation described in the report BWROG-8134 dated March 31, 1981.

GPC has implemented or plans to inplement the following recomendations from the EWROG report:

(numbering corresponds i

to that of the report)

(1) (a)

Iowered RPV water level isolation setpoint for MSIV cloaire i

from Level 2 to Level 1: modifications are described in our response to your glestion #1.

l (3)

(a)

Iow-Iow Set (LIS) relief logic system:

modifications are described in the response to your g2estion #1.

(4)

(a) Analog trip transmitter system (ATIS) will be implemented on l

Unit 2 dirits the c2rrent ou tage, and on Unit 1 dirire an l

autage schediled to start in September, 1984.

Revisions to the Unit 2 Technical Specifications and alpporting technical j

information were sent to the NRC in a albnittal dated Jarnary i

23, 1984.

Similar revisions for Unit 1 will be albnitted in conjunction with the Unit 1 modifications.

i l

70077$

GeorgiaPower A Director of M1 clear Reactor Recplation Attention: Mr. John F. Stolz, Chief Operatirg Reactors Branch No. 4

.line 1, 1984 Page 3 (4)

(c)

Redice isolations calsed by alrveillance testing:

Implementation of the ATIS is expected to redice spurious trips and isolations die to alrveillance testirg and other calses.

(6)

Control of pnalmatic alpply pressure to SRVs:

GPC has implemented the following inprovements to the drywell pnalmatic system:

1) revised setpoint for an existirg low presaire alarm to alert the operator to loss of pneumatic alpply to the SRVs,
2) installed a high presaire alarm to alert operators to excessive pneumatic alpply presaire which caild calse misoperation of the SRVs, and 3) installed a relief valve on the drywell pneumatic alpply to enaire that the maxim 1m allowable presaire will not be exceeded.

Additional pipirg modifications are being implemented to inprove the reliability of the lorg term pneumatic alpply to the SRVs.

'Itese modifications will be installed dirirg the carrent Unit 2 outage, and daring the Unit 1 outage schediled to begin in September, 1984.

(7)

Use of Target Rock two-stage SRVs:

Unit 1 was converted from three-stage to two-stage SRVs in 1978.

Unit 2 had two stage SRVs installed dirirg construction, i

Please contact this office if you have any glestions or contunts.

Very truly yours f f Q1 =

L. T.

G1 cwa PLS/

xc:

J. T. Beckham, Jr.

H. C. Nix, Jr.

J. P. O'Reilly (NRC-Region II)