Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000316/LER-1984-012, :on 840508,inadvertent Safety Injection Occurred During Load Shedding Surveillance Test on Train B Diesel Generator.Caused by Personnel Error & Procedural Deficiency.Load Shedding Procedure Modified + (16:53:21, 13 December 2024)
- ML20091N666 + (16:53:22, 13 December 2024)
- 05000265/LER-1984-005-04, :on 840508,electromatic Relief Valve 2-203-3C Found to Have Leaking Pilot Valve.Caused by Steam Cutting of Valve Seat.New Pilot Valves Installed on Valves 2-203-3C & 2-203-3E + (16:53:24, 13 December 2024)
- ND-20-0289, Transmittal of NPDES Permit Renewal Application + (16:53:26, 13 December 2024)
- ML20091N657 + (16:53:27, 13 December 2024)
- ML20091N653 + (16:53:27, 13 December 2024)
- ML20091N649 + (16:53:28, 13 December 2024)
- ML20091N642 + (16:53:29, 13 December 2024)
- ML20091N634 + (16:53:30, 13 December 2024)
- ML20091N628 + (16:53:31, 13 December 2024)
- 05000272/LER-1984-011-01, :on 840503,fire Suppression Pump Removed from Svc for 18-month Surveillance Requirements & on 840509,while Returning Pump to Svc,Pump Discharge Valve Would Not Open. Caused by Broken Stem.Stem & Disc Replaced + (16:53:33, 13 December 2024)
- 05000331/LER-1984-018, :on 840507,RCIC Steam Leak High Differential Pressure Relay Inadvertently Jarred & Energized,Causing Spurious RCIC Isolation & Turbine Trip Signals.Cause Unknown.Signal Reset & Isolation Valve Opened + (16:53:35, 13 December 2024)
- ML20091N584 + (16:53:37, 13 December 2024)
- ML20091N576 + (16:53:37, 13 December 2024)
- ML20091N573 + (16:53:38, 13 December 2024)
- ML20091N559 + (16:53:39, 13 December 2024)
- ML20091N572 + (16:53:39, 13 December 2024)
- ST-HL-AE-1099, Interim Deficiency Rept Re Commingling of Round Rod Matls. Initially Reported on 840430.Interim Measures Implemented to Define Previously Field Fabricated Components Susceptible to Matl Commingling.Next Rept Expected by 840928 + (16:53:40, 13 December 2024)
- ML20091N542 + (16:53:41, 13 December 2024)
- 05000289/LER-1984-001-02, :on 840427,relay Room Floor Fire Barrier Penetration Seal 735 Identified to Be in Deficient Condition.Fire Seals in New Conduits Installed Between Apr 1979 & 831107 Will Be Inspected & Repaired + (16:53:43, 13 December 2024)
- 2CAN068402, Forwards Current 2R4 Refueling Outage Schedule Per 831213 Commitment.Outage Planned for Early Feb 1985.Approx Monthly Updates of Design & Testing Data Will Be Provided + (16:53:44, 13 December 2024)
- ML20091N525 + (16:53:45, 13 December 2024)
- ML20091N519 + (16:53:46, 13 December 2024)
- ML20091N507 + (16:53:47, 13 December 2024)
- ML20091N501 + (16:53:50, 13 December 2024)
- ML20091N492 + (16:53:51, 13 December 2024)
- 3F0192-02, Forwards Schedule Milestones for Security Sys Upgrade Program,Per 911126-27 Meetings W/Nrc,Providing Breakdown of Security Sys Upgrade Project Activities + (16:53:52, 13 December 2024)
- GO2-91-237, Forwards Rev 10 to Guard Training & Qualification Plan.Rev Withheld (Ref 10CFR2.790(d)) + (16:53:52, 13 December 2024)
- GO2-92-019, Forwards Rev 10 to Guard Training & Qualification Plan. Contents of Package Apparently Damaged During Shipment to Dcd,Containing Rev,Reviewed & Found Intact.Rev Withheld + (16:53:53, 13 December 2024)
- HL-5019, Responds to Request for Addl Info Re Core Shroud Mod Scheduled for Installation During Fall 1995 Unit 2 Refueling Outage.Also,Forwards Proprietary Stress Corrosion Cracking Evaluation of XM-19 in BWR Environment. Encl Withheld + (16:53:55, 13 December 2024)
- ML20091N460 + (16:53:57, 13 December 2024)
- ML20091N466 + (16:53:57, 13 December 2024)
- ML20091N458 + (16:53:58, 13 December 2024)
- ML20091N456 + (16:53:59, 13 December 2024)
- ML20091N452 + (16:53:59, 13 December 2024)
- ML20091N446 + (16:54:00, 13 December 2024)
- 05000423/LER-1991-031, :on 911221,TS Surveillance on Ventilation Vent Radiation Monitor Missed & Grab Sample Not Performed for Approx 12 H.Caused by Administrative Oversight.Sample Obtained + (16:54:02, 13 December 2024)
- ML20091N440 + (16:54:04, 13 December 2024)
- ML20091N439 + (16:54:05, 13 December 2024)
- ML20091N431 + (16:54:06, 13 December 2024)
- ML20091N429 + (16:54:07, 13 December 2024)
- 3F0192-09, Corrected TS 3/4 7-26 Re Surveillance Requirements for Hydraulic Snubbers + (16:54:08, 13 December 2024)
- ML20091N417 + (16:54:11, 13 December 2024)
- ML20091N407 + (16:54:12, 13 December 2024)
- ML20091N403 + (16:54:13, 13 December 2024)
- ML20091N400 + (16:54:14, 13 December 2024)
- ML20091N397 + (16:54:15, 13 December 2024)
- ML20091N381 + (16:54:18, 13 December 2024)
- ML20091N376 + (16:54:18, 13 December 2024)
- ML20091N370 + (16:54:21, 13 December 2024)
- ML20091N359 + (16:54:21, 13 December 2024)
- 05000423/LER-1991-030, :on 911219,engineering Evaluation Concluded Failure of Three Normally Energized Auxiliary Relays for MOV Was Caused by Insulation Breakdown.Caused by Accelerated Thermal aging.Non-SR J10s Evaluated & Replaced + (16:54:23, 13 December 2024)