ML20091N573

From kanterella
Jump to navigation Jump to search
Advises That Train B Portion of TP/1/A/1200/03B, Engineered Safeguards Feature Test, Completed on 840508 W/Satisfactory Results,Per SER Confirmatory Item 26 & IE Bulletin 80-06
ML20091N573
Person / Time
Site: Catawba  
Issue date: 06/08/1984
From: Tucker H
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
References
IEB-80-06, IEB-80-6, NUDOCS 8406120373
Download: ML20091N573 (2)


Text

[

O j

DUKE POWER GOMPANY 1*.O. Box 33180 CllAHLOTTE, N.O. 28242 "2.";.2.'.* "

  • 7;;:L June 8, 1984 Mr. Harold R. Denton,. Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commist. ion Washington, D. C. 20555 Attention: Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re: Catawba Nuclear Station Docket Nos. 50-413 and 50-414

Dear Mr. Denton:

My letter April 25, 1984 provided additional information in response to Catawba SER Confirmatory Item 26, Compliance with IE Bulletin 80-06.

In this letter it was noted that the Train A portion of TP/1/A/1200/03B,

" Engineered Safeguards Feature Test" had been completed.

The purpose of this letter is to advise that the Train B portion of the test was completed approximately May 8,1984 with satisfactory results.

Very truly yours, dk*

Hal B. Tucker ROS/php cc: Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Catawba Nuclear Station Mr. Robert Guild, Esq.

Attorney-at-Law P. 0. Box 12097 Charleston, South Carolina 29412 fh8 l Palmetto Alliance 0

21351 Devine Street Columbia, South Carolina 29205 J'

8406120373 840608 PDR ADOCK 05000413 t

.E PDR. -

.u:

s:

Mr.- Harold R. Denton, Director

' June 8, 1984 Page. 2 --

cc: Mr. Jesse L. Riley Carolina Environmental Study Group 854 Henley Place

~ Charlotte, North Carolina 28207

~

l I

i.

,- S k