Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- W3P84-1607, Suppls & Discusses R Beker Concerns Re Questions 640.17-22.FSAR Changes Which Will Be Implemented in Future Amend Per 10CFR50.71(e) Requirements + (16:48:18, 13 December 2024)
- 05000416/LER-1984-028, :on 840507,during Storm,Arcing Occurred Across Open Disconnect for 500 Kv Switchyard Breaker,Causing Loss of Power Which Resulted in Reactor Water Cleanup Reactor Isolation.Plant Shut Down + (16:48:20, 13 December 2024)
- 05000327/LER-1984-033, :on 840511,automatic Reactor Trip on lo-lo Level Experienced in Steam Generator 2 Following Turbine Trip.Caused by Broken Linkage on Steam Dump Valve 1-FCV-1-107.Linkage Replaced + (16:48:23, 13 December 2024)
- 05000305/LER-1984-010, :on 840507,during Power escalation,lo-lo Level Setpoint Reached in Steam Generator 1B,initiating Reactor Trip.Caused by Operator Attempting to Stabilize Level Oscillation.No Corrective Actions Necessary + (16:48:25, 13 December 2024)
- ML20091P500 + (16:48:26, 13 December 2024)
- ML20091P495 + (16:48:26, 13 December 2024)
- 05000369/LER-1984-015, :on 840426,during Performance of Rod Control Cluster Assembly Drop Timing,Rod B-12 Failed to Indicate Correct Position.Caused by Defective Detector/Encoder Card. Card Replaced & Drop Timing Completed + (16:48:28, 13 December 2024)
- ML20091P488 + (16:48:29, 13 December 2024)
- ML20091P485 + (16:48:32, 13 December 2024)
- ML20091P484 + (16:48:32, 13 December 2024)
- ML20091P473 + (16:48:33, 13 December 2024)
- ML20091P472 + (16:48:35, 13 December 2024)
- ML20091P466 + (16:48:37, 13 December 2024)
- ML20091P468 + (16:48:37, 13 December 2024)
- ML20091P464 + (16:48:39, 13 December 2024)
- ML20091P465 + (16:48:39, 13 December 2024)
- ML20091P461 + (16:48:41, 13 December 2024)
- ML20091P456 + (16:48:42, 13 December 2024)
- ML20091P460 + (16:48:42, 13 December 2024)
- ML20091P452 + (16:48:43, 13 December 2024)
- ML20091P445 + (16:48:47, 13 December 2024)
- ML20091P440 + (16:48:56, 13 December 2024)
- ML20091P431 + (16:49:04, 13 December 2024)
- ML20091P427 + (16:49:04, 13 December 2024)
- ML20091P424 + (16:49:06, 13 December 2024)
- 05000373/LER-1995-005-06, :on 950208,discovered That Samples of Diesel Fuel Required by TS 4.8.1.1.2.c.2 Not Taken Due to Failure to Properly Implement Changes to TS 4.8.1.1.2.c.2 Sampling Requirements.Sampling Procedures Revised.W/O Ltr + (16:49:11, 13 December 2024)
- ML20091P405 + (16:49:20, 13 December 2024)
- ML20091P401 + (16:49:21, 13 December 2024)
- LIC-95-0157, Forwards Rev 3 to Fort Calhoun Station ISI Program Plan for Third Ten-Yr Interval 1993-2003 + (16:49:22, 13 December 2024)
- ML20091P388 + (16:49:23, 13 December 2024)
- ML20091P385 + (16:49:25, 13 December 2024)
- ML20091P381 + (16:49:26, 13 December 2024)
- ML20091P379 + (16:49:26, 13 December 2024)
- 05000298/LER-1995-010, :on 950413,unanalyzed Condition Discovered During Closeout of RHR Min Flow Valve Design Change (DC) 94-332.Caused by Improper Review of Previous DC 76-2.Util Implemented DC 94-332 + (16:49:28, 13 December 2024)
- ML20091P376 + (16:49:29, 13 December 2024)
- ML20091P361 + (16:49:34, 13 December 2024)
- ML20091P357 + (16:49:35, 13 December 2024)
- ML20091P348 + (16:49:37, 13 December 2024)
- 05000397/LER-1984-042, :on 840517,reactor Manually Shut Down Due to Loss of Control of Vessel Water.Caused by Malfunction of Mechanical Linkage from Servo Control Motor.Linkage Repositioned & Refastened + (16:49:39, 13 December 2024)
- ML20091P339 + (16:49:40, 13 December 2024)
- LIC-95-0160, Forwards FFD Program Performance Data Rept,For Six Month Period Ending 950630,per 10CFR26.71(d) + (16:49:41, 13 December 2024)
- 05000286/LER-1984-007-01, :on 840508,while at 100% Power,Monthly Surveillance Test 3PT-M1 Results Indicated Failure in Channel 41.Caused by Out of Range Setpoints Due to Instrument Drift.Instrumentation Readjusted + (16:49:43, 13 December 2024)
- JAFP-95-0389, Responds to NRC Re Violation Noted in Safety Insp Rept 50-333/95-02.Corrective Actions:Formal Critique of Unauthorized Combustible Control Permit & Related Events Completed on 950204 & New Fire Protection Supervisor Hired + (16:49:44, 13 December 2024)
- ML20091P333 + (16:49:45, 13 December 2024)
- ML20091P330 + (16:49:46, 13 December 2024)
- RBG-41810, Forwards Fitness for Duty six-month Program Performance Data Rept for Jan-June 1995 + (16:49:47, 13 December 2024)
- ML20091P325 + (16:49:48, 13 December 2024)
- NRC-95-0070, Forwards Semiannual FFD Rept for Period from Jan-June 1995, in Accordance w/10CFR26.71(d) + (16:49:49, 13 December 2024)
- ML20091P318 + (16:49:50, 13 December 2024)
- ML20091P317 + (16:49:51, 13 December 2024)
- BECO-LTR-95-085, Forwards FFD Program Performance Data for Period Jan-June 1995,in Accordance w/10CFR26.71(d) + (16:49:52, 13 December 2024)