ML20091P376
| ML20091P376 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 01/24/1992 |
| From: | Gates W OMAHA PUBLIC POWER DISTRICT |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| LIC-92-006R, LIC-92-6R, NUDOCS 9202030046 | |
| Download: ML20091P376 (2) | |
Text
.
Oinaha Public Power District 144 South 16th Stru t Ma!!
uha NMuaa 68102 2247 402/630 2000 January 24, 1992 Ll!92-00fsR V. S. Nuclear Regulatory Commission AllN: Document Control Desk Pail Station e'l 137 Washingten, DC 20555
References:
1.
Docket No. 50 285 2.
Letter fron OPPD (K. J. Morris 31, 1989 (LIC 89)0815)to NRC (Document cated August 3.
Letter from 0 PPD (K. J. Morris) to NRf, (Document Control Desk) dated October 20. 1989 (LIC-89-0947) 4.
Letter from OPPD (W. G. Cates) to NRC (Document Control Desk) dated August 14, 1991 (LIC-91-074R) 5.
Letter from NRC (D. L. Wigginton) to OPPD (W. G. Gates) dated November 25, 1991 Gentlemen:
SUBJECT:
Resolution of HED 93 Regarding Single Indicating Lamps in Reference 5, the NRC found the proposed resolution to HED 93 by Omaha Public with the NRC staff) on Decemberto be unacceptable. OPPD held a telephone confer'nce call Power District (OPPD 20, 1991 to <!iscuss the incandescent lamp administrative control program proposed in Reference 4.
The conversation centered on details of the administrative program proposed by 0 PPD in Reference 4 and its similarity to the LED lamo replacement program proposed in References 2 and 3.
Based on this discussi<:n, the NRC and OPPD agreed thot:
1.
The aoministrative incandescent lamp replacement program discussed in Reference 4 will be implemented by May 1,1992 as an interim measure. No modifications on the subject matter will be implemented during the 1992 refueling outage.
A probability determination of equivalency for adtinistrative control of incandescent lamp replacement can be submitted by OPPD for NRC review.
OPPD intends to perform the determination noted in (2) above and submit it to the NRC by July 1, ;992, if the NRC finds the administrative centrol program unacceptable af ter reviewing the probability plan discussed in (2) above, OPPD will modify the current single indicating lamps d' iring the 1993 refueling outage.
9202030046 920124 l
(h PDR ADOCK 05000285 i
P PDH 45 5R4 or;e, n v,
- o;, at a,-
/ h
)
LIC 97 006R Page 2 h
i If you should have any questions, please contact me.
l Sincarely,
//6./$Y.*N2 l
1 W. G. Gat is i
Division rianager Nuclear Operations WGG/sel' c:
LeBoeuf, Lamo, Leiby & MacRae R. D. Martin, NRC Regional Administrator, Region IV
- 0. L. Wiggluton, NRC Senior Project Manager R. P. Mullikin, NRC Senior Resident inspector i
e s
_-_..__..,__.._:...__._______...__..___.