Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20092L104 + (16:02:04, 13 December 2024)
- ML20092L102 + (16:02:04, 13 December 2024)
- ML20092L080 + (16:02:05, 13 December 2024)
- LD-92-026, Forwards Nonproprietary & Proprietary Responses to Request for Addl Info,Including Listing of MAAP Parameter File for Sys 80+ Design.Proprietary Response & Listing of MAAP Parameter File for Sys 80+ Design Withheld + (16:02:06, 13 December 2024)
- LD-92-024, Forwards Response to NRC Request for Addl Info on Electrical Distribution Sys Design,In Ref to NRC Review of CESSAR + (16:02:08, 13 December 2024)
- 05000327/LER-1984-039, :on 840527,control Room Ventilation Isolation Occurred Twice When High Radiation Alarm Actuated.Caused by Failed Vacuum Pump & Inadvertently Generated Spurious Spike. Alarm Cleared & Pump Bearings & Vanes Replaced + (16:02:10, 13 December 2024)
- ML20092L066 + (16:02:11, 13 December 2024)
- ML20092L065 + (16:02:11, 13 December 2024)
- LD-92-022, Forwards NRC Re Addl Info for NRC Staff Review of CESSAR-Design Certification + (16:02:12, 13 December 2024)
- ML20092L058 + (16:02:13, 13 December 2024)
- ML20092L054 + (16:02:14, 13 December 2024)
- ML20092L051 + (16:02:14, 13 December 2024)
- ML20092L048 + (16:02:15, 13 December 2024)
- ML20092L047 + (16:02:16, 13 December 2024)
- ML20092L035 + (16:02:18, 13 December 2024)
- RS-20-045, Response to Request for Additional Information Related to Relief Request 14R.05 for the Fourth Inservice Inspection Interval + (16:02:18, 13 December 2024)
- RBG-18-089, Forwards Response to Request for Addl Info Re Combustible Gas Control Sys.Based on Evaluation,Util Will Select Suitable Equipment Protection Measures Appropriate for Equipment Location & Degraded Core Thermal Environ + (16:02:20, 13 December 2024)
- ML20092L019 + (16:02:20, 13 December 2024)
- ML20092L007 + (16:02:21, 13 December 2024)
- ML20092L006 + (16:02:22, 13 December 2024)
- ML20092K997 + (16:02:22, 13 December 2024)
- ML20092K996 + (16:02:23, 13 December 2024)
- ML20092K980 + (16:02:30, 13 December 2024)
- ML20092K987 + (16:02:30, 13 December 2024)
- ML20092K973 + (16:02:31, 13 December 2024)
- ML20092K972 + (16:02:32, 13 December 2024)
- LD-92-020, Responds to Request for Addl Info Re C-E Std SAR-Design Certification + (16:02:34, 13 December 2024)
- ML20092K963 + (16:02:34, 13 December 2024)
- ML20092K962 + (16:02:35, 13 December 2024)
- 05000325/LER-1992-003, :on 920117,reactor Scrammed Due to Primary Uninterruptible Power Supply (UPS) Internal Failure.Standby UPS Placed in Svc Prior to Reactor Startup & Addl Troubleshooting to Be Conducted on Primary UPS + (16:02:37, 13 December 2024)
- ML20092K957 + (16:02:38, 13 December 2024)
- ML20092K951 + (16:02:39, 13 December 2024)
- ML20092K950 + (16:02:39, 13 December 2024)
- ML20092K946 + (16:02:40, 13 December 2024)
- ML20092K935 + (16:02:40, 13 December 2024)
- ML20092K934 + (16:02:41, 13 December 2024)
- ML20092K923 + (16:02:42, 13 December 2024)
- ML20092K911 + (16:02:43, 13 December 2024)
- ML20092K908 + (16:02:45, 13 December 2024)
- ML20092K904 + (16:02:45, 13 December 2024)
- ML20092K902 + (16:02:46, 13 December 2024)
- ML20092K887 + (16:02:47, 13 December 2024)
- ML20092K871 + (16:02:48, 13 December 2024)
- ML20092K870 + (16:02:49, 13 December 2024)
- LD-92-017, Forwards Response to NRC Re Addl Info for NRC Staff Review of CESSAR Design Certification + (16:02:50, 13 December 2024)
- AECM-84-0342, Requests License Condition 2.C (32), Interplant Communication Sys, Be Revised to Delete Fixed Date Requirement for Submittal of Communications Test Results,Due to Prolonged Delay in Power Ascension Program + (16:02:51, 13 December 2024)
- ML20092K849 + (16:02:51, 13 December 2024)
- 05000333/LER-1992-006, :on 920122,inadequate Fire Watch Noted in Areas W/Deficiencies in Fire Penetration Seal & Ventilation Ductwork Damper.Caused by Personnel Error.Fire Watch Personnel Replaced & Disciplined + (16:02:53, 13 December 2024)
- ML20092K833 + (16:02:55, 13 December 2024)
- ML20092K828 + (16:02:55, 13 December 2024)
- ML20092K827 + (16:02:56, 13 December 2024)
- ML20092K824 + (16:02:57, 13 December 2024)