- ML20093C099 + (15:42:03, 13 December 2024)
- 05000397/LER-1984-095, :on 840910,during Power Ascension Test,Reactor Scram Occurred.Caused by Test Switch Connected to Reactor Protection Sys Rather than Reactor Pump Trip Logic,Due to Misreading of Test Procedure Drawing + (15:42:05, 13 December 2024)
- ML20093C089 + (15:42:06, 13 December 2024)
- ML20093C085 + (15:42:07, 13 December 2024)
- ML20093C082 + (15:42:08, 13 December 2024)
- ML20093C081 + (15:42:09, 13 December 2024)
- ML20093C080 + (15:42:10, 13 December 2024)
- ML20093C079 + (15:42:11, 13 December 2024)
- RBG-19048, Interim Deficiency Rept DR-240 Re Three Potential Problems W/Random Trip Output of Westinghouse Type SA-1 Differential Relays.Initially Reported on 840828.Interim or Final Status Rept Will Be Provided by 841027 + (15:42:12, 13 December 2024)
- ML20093C073 + (15:42:14, 13 December 2024)
- 05000335/LER-1984-008-02, :on 840828,spurious Containment Isolation Signal Received.Caused by Two Shorted Instrument Bus Wires During Electrical Insp.Signal Reset + (15:42:16, 13 December 2024)
- ML20093C068 + (15:42:17, 13 December 2024)
- ML20093C062 + (15:42:18, 13 December 2024)
- ML20093C057 + (15:42:19, 13 December 2024)
- TAC:43804 + (15:42:20, 13 December 2024)
- ML20093C056 + (15:42:21, 13 December 2024)
- 05000370/LER-1984-019-01, :on 840820,while Filling & Venting Upper Head Injection Sys,Reactor Vessel Head Sight Glass Failed, Releasing RCS Water Into Containment Bldg.Caused by Design Deficiency.Sight Glass Replaced + (15:42:23, 13 December 2024)
- ML20093C044 + (15:42:24, 13 December 2024)
- W3P84-2580, Interim Rept of Significant Const Deficiency 84 Re Tube Track Welding Defects.Rept Reopened to Resolve Issues Referenced in DG Eisenhut .Final Rept Due Approx 841005 + (15:42:24, 13 December 2024)
- ML20093C043 + (15:42:25, 13 December 2024)
- W3P84-2582, Interim Rept of Significant Const Deficiency 101 Re Traceability of Stainless Steel Instrument Tubing.Rept Reopened to Resolve Issues Referenced in DG Eisenhut .Final Rept Due Approx 841005 + (15:42:25, 13 December 2024)
- ML20093C038 + (15:42:26, 13 December 2024)
- 05000397/LER-1984-096, :on 840901,deluge Sys Actuated Due to Steam Leak.Fire Pump & Two pre-action Sys Tripped & Fire Alarm Received for Water Filtration Bldg.Caused by Shut Cooling Water Supply Valve to FP-P-110 Diesel Engine + (15:42:30, 13 December 2024)
- ML20093C030 + (15:42:32, 13 December 2024)
- 05000331/LER-1984-033, :on 840906,electric Fire Pump Failed to Meet Flow Requirements & Plant Exceeded 7-day Limit for Pump Inoperability.Pump Impeller Adjusted to Increase Flow to Meet Requirement + (15:42:34, 13 December 2024)
- ML20093C026 + (15:42:35, 13 December 2024)
- ML20093C025 + (15:42:36, 13 December 2024)
- W3P84-2583, Interim Rept of Significant Const Deficiency 57 Re Inadequate Instrumentation & Control Installations Turnover Documentation.Rept Reopened to Resolve Issues Referenced in DG Eisenhut .Final Rept Due Approx 841005 + (15:42:36, 13 December 2024)
- 05000338/LER-1984-008-02, :on 840901,radial Flaws Discovered During Insp of HX Lap Rings.Caused by Cracking Due to Chloride Induced Stress Corrosion.Stainless Steel Installed at Point of Lap Ring + (15:42:38, 13 December 2024)
- ML20093C012 + (15:42:42, 13 December 2024)
- ML20093C017 + (15:42:42, 13 December 2024)
- ML20093C006 + (15:42:44, 13 December 2024)
- 3F0884-19, Effluent & Waste Disposal Semiannual Rept,Jan-June 1984 + (15:42:45, 13 December 2024)
- ML20093C001 + (15:42:46, 13 December 2024)
- ML20093C000 + (15:42:47, 13 December 2024)
- ML20093B995 + (15:42:47, 13 December 2024)
- ML20093B992 + (15:42:48, 13 December 2024)
- RBG-18942, Interim Deficiency Rept DR-188 Re Hubs on socket-weld Flanges Supplied by Guyon Alloys for Instrument Lines on Main Steam Isolation Sys.Next Rept Expected by 841121 + (15:42:49, 13 December 2024)
- 05000370/LER-1984-018-01, :on 840819,during Preoperational Test,Diesel Generator 2A Unexpectedly Started Automatically.Caused by Failure to Adequately Test Automatic Fast Transfer Circuitry.Undervoltage Relays to Be Replaced + (15:42:51, 13 December 2024)
- ML20093B963 + (15:42:55, 13 December 2024)
- ML20093B962 + (15:42:55, 13 December 2024)
- ML20093B961 + (15:42:56, 13 December 2024)
- ML20093B954 + (15:42:57, 13 December 2024)
- ML20093B958 + (15:42:57, 13 December 2024)
- ML20093B952 + (15:42:58, 13 December 2024)
- ML20093B947 + (15:42:59, 13 December 2024)
- 05000311/LER-1984-021, :on 840826,trip of Steam Generator Feed Pump 21 Resulted in Steam Flow/Feed Flow Mismatch on Steam Generators & Reactor Trip.Caused by Failure of Magnetic Speed pick-up Sensor.Sensor Replaced + (15:43:01, 13 December 2024)
- ML20093B940 + (15:43:03, 13 December 2024)
- ML20093B936 + (15:43:05, 13 December 2024)
- ML20093B934 + (15:43:06, 13 December 2024)
- 3F1084-02, Application for Amend to License DPR-72,requesting Authorization to Continue Using once-through Steam Generator (OTSG) Drain Lines for OTSG Blowdown for Brief Periods of Time Above High Energy Line Threshold + (15:43:07, 13 December 2024)
- ML20093B930 + (15:43:07, 13 December 2024)