MONTHYEARML20079Q4141983-09-30030 September 1983 Safety Parameter Display Sys Program Plan, in Response to Generic Ltr 82-33,Suppl 1 to NUREG-0737 Project stage: Other ML20082F3351983-11-0404 November 1983 Requests Info Re NRC Schedule for Preimplementation Review of Safety Parameter Display Sys.Nrc Review Needed to Enable Further Implementation of NUREG-0737,Suppl 1 Requirements Per Generic Ltr 82-33 Project stage: Other ML20079Q4051984-01-20020 January 1984 Forwards Safety Parameter Display Sys Program Plan & Responds to NRC Re Control Room Design Review in-progress Audit.Audit Proposed to Take Place During Wk of 840312 Project stage: Other ML20137L0731984-08-31031 August 1984 Rev 0 to Procedure EIP-24, Test Procedure for Performance & Isolation Testing of 1E Analog & Digital Isolators Project stage: Other ML20093C0801984-09-19019 September 1984 Informs That Safety Parameter Display Sys (SPDS) SAR Will Be Submitted by 841114.Preimplementation Audit Results Received 4 Months Later than Expected.Schedule for Submittal of SPDS Info Requested in NRC Will Be Provided Project stage: Other ML20099J3161984-11-13013 November 1984 Forwards Response to NRC 840914 Request for Addl Info Re SPDS Sar,Rev 0 to SAR, Fort St Vrain SPDS & Revised SPDS Program Plan Project stage: Request ML20099J3341984-11-13013 November 1984 Revised SPDS Program Plan Project stage: Other ML20099J3261984-11-15015 November 1984 Rev 0 to Fort St Vrain SPDS Sar Project stage: Other ML20141N1891984-12-0707 December 1984 Rev 2 to Procedure EIP-30, Isolator Circuit Differential High Voltage Fault Test Procedure Project stage: Other ML20107C1021985-01-31031 January 1985 Responds to 850131 Request for Addl Info Re SPDS Isolators. Description of Measures Taken to Protect Safety Sys from Electrical Interference Generated by SPDS Will Be Provided by Aug 1985 Project stage: Request ML20137L0671985-08-0101 August 1985 Rev 0 to Procedure PSCC-1-EIP-24, Test Procedure for Qualification of Fort St Vrain Electrical Isolation Sys for Public Svc Co of Co Project stage: Other ML20137L0561985-08-26026 August 1985 Forwards PSCC-1-EIP-24, Test Procedure for Qualification of Fort St Vrain Electrical Isolation Sys... & Rev 0 to EIP-24, Test Procedure for Performance & Isolation Testing..., Per NRC Request for SPDS Review Project stage: Request ML20137N9141985-09-0505 September 1985 Forwards Test Plan Used in Testing SPDS Isolation Equipment from Interference & Provides Action Taken Re Info Needed for NRC Review Project stage: Other ML20141N1871986-02-19019 February 1986 Forwards Response to 860103,14 & 15 Requests for Addl Info Re SPDS Project stage: Other ML20203P9441986-04-29029 April 1986 Clarifies to NRC Re Spds.Forwards Rev 2 to Procedure EIP-30, Isolator Circuit Differential High Voltage Fault Test Procedure Project stage: Other 1984-08-31
[Table View] |
Text
--
i
-o-public Service Company W On&nado 2420 W. 26th Avenue, Suite 100D, Denver, CO 80211 September 19, 1984 Fort St. Vrain Unit No. 1 P-84372 Regional Administrator Region IV Nuclear Regulatory Commission
'g g g g g
611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012 Attention: Mr. E. H. Johnson
)
L DOCKET N0. 50-267
SUBJECT:
Safety Parameter Display System Safety Analysis Report
REFERENCES:
- 1) PSC Letter Dated 03/09/84, Warembourg to Collins; P-84079
- 2) NRC Letter Dated 09/14/84, Johnson to Lee; G-84355
Dear Mr. Johnson:
Public Service Company of Colorado pro date for the SPDS Safety Analysis Report (posed a tentative submittal SAR) of September 20, 1984 in Reference 1.
The proposed date was based on PSC's understanding that the results of the NRC SPDS Pre-Implementation Audit of March 12, 1984 would be available within 30 days of the audit for PSC to review and take appropriate action.
During the audit exit interview, PSC was informed that only the official audit report represented the final position of the NRC, and that information provided during the audit represented the opinion of the auditors only.
In this respect, PSC has been hesitant to finalize the SPDS safety analysis report.
In a
recent discussion between Mr.
Phil Wagner (NRC) and Mr. M.H. Holmes (PSC), Mr. Wagner indicated that PSC should delay submittal of the SPDS SAR until PSC reviews the results of the SPDS
/
dgD B410100350 840919 PDR ADOCK 0D000267 F
PDR i
' P-84372 y
Page 2 audit, since NRC coments could impact the SAR.
PSC received the.
"SPDS Pre-Implementation Audit Results for Fort St. Vrain" (Reference
- 2) on September 18, 1984, four months after the date previously specified by the NRC..
Based on the discussion with Mr. Wagner and the recent receipt of the audit results, PSC is proceeding to take appropriate action on the requests contained in Reference 2.
PSC hereby commits to submitting the SPDS SAR on or before November 14, 1984 along with the schedule for submitting information on the SPDS requested in Reference 2.
If you have any questions regarding this matter, please call Mr.M.H.Holmesat(303)571-8409.
Very truly yours, b V' Y M A D. W. Warembourg, Man Nuclear Engineering Division DWW/NB:pa