Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20093F692 + (15:27:37, 13 December 2024)
- ML20093F689 + (15:27:38, 13 December 2024)
- 05000282/LER-1984-006-01, :on 840831,reactor Tripped During Startup. Caused by Steam Flow/Feedwater Flow Mismatch Indication. Faulty Feedwater Flow Transmitter & Regulating Valve to Be Replaced + (15:27:39, 13 December 2024)
- ML20093F681 + (15:27:41, 13 December 2024)
- ML20093F674 + (15:27:42, 13 December 2024)
- TXX-4317, Final Deficiency Rept SDAR-150 Re NSSS Auxiliary Relay Tracks Not Qualified Per IEEE-323-1974.Initially Reported on 840831.Matter Not Reportable Per 10CFR50.55(e) + (15:27:43, 13 December 2024)
- ML20093F671 + (15:27:43, 13 December 2024)
- ML20093F665 + (15:27:44, 13 December 2024)
- ML20093F662 + (15:27:45, 13 December 2024)
- 05000271/LER-1984-010, :on 840616,after Reactor Shut Down,Stack Gas Radiation Monitor II Improperly Responded & on 840617, During Stack Gas II Radiation Calibr Monitor Found W/Gamma Sensitive Detector Vice + (15:27:46, 13 December 2024)
- 05000413/LER-1995-005-02, :on 950913,TS Violation Occurred.Caused by Inadequate Written Communication Due to Technical Inaccuracies in Calibr.Calibr Procedures Placed on Hold Until Revs Made to Ensure Integrity + (15:27:49, 13 December 2024)
- ML20093F653 + (15:27:50, 13 December 2024)
- NLS8400018, Forwards Response to IE Bulletin 84-02, Failures of GE Type Hfa Relays in Use in Class IE Safety Sys. Util Will Change Out All Hfa Relays Associated w/safety-related Sys During Fall 1984 Refueling Outage + (15:27:50, 13 December 2024)
- ML20093F652 + (15:27:51, 13 December 2024)
- RBG-19022, Interim Deficiency Rept DR-197 Re Seismic Testing of Category I Air Compressor Used for Penetration Valve Leakage Control Sys.Next Rept Expected by 841107 + (15:27:52, 13 December 2024)
- ML20093F649 + (15:27:52, 13 December 2024)
- ML20093F634 + (15:27:55, 13 December 2024)
- ML20093F631 + (15:27:56, 13 December 2024)
- ML20093F623 + (15:27:57, 13 December 2024)
- ML20093F622 + (15:27:58, 13 December 2024)
- 05000454/LER-1995-003-10, :on 950913,containment Leak Detector Was Inoperable.Caused by Misinterpretation of TS Requirements by Shift Control Room Engineers Involved.Wrote Daily Order to Identify Correct Interpretation of TS 3.4.6.1 + (15:28:00, 13 December 2024)
- ML20093F613 + (15:28:01, 13 December 2024)
- RC-95-0252, Forwards Rev 7 to General Test Procedure (Gtp) GTP-301, IST of Pumps Second Ten Yr Interval, Incorporating Guidance from NUREG-1482 in Response to GL 89-04,Suppl 1 + (15:28:02, 13 December 2024)
- RBG-19023, Interim Deficiency Rept DR-208 Re Bergen-Paterson Snubber Assembly Pin Connection Compatibility.Next Rept Expected by 841108 + (15:28:02, 13 December 2024)
- 05000362/LER-1984-025-01, :on 840614,isolation Valve Between Containment & Wide Range Containment Pressure Transmitter Found Closed. Cause Unknown.To Prevent Recurrence,All safety-related Instrument Manifold Valves Will Be Seal Wired + (15:28:04, 13 December 2024)
- 05000237/LER-1984-009-05, :on 840621,during Normal Operations,Feedwater Regulating Valve a Operator Vibrated Loose from Valve Stem Coupling.Caused by Vibration of Locknut.Two Sheet Metal Lock Taps Installed + (15:28:07, 13 December 2024)
- 05000237/LER-1984-005-06, :on 840618,security Computer Taken Out Svc, & Fire Detection Alarms Could Not Be Indicated.Caused by Personnel Error.Procedure Will Be Revised to Establish Controls Following Computer Outage + (15:28:09, 13 December 2024)
- ML20093F589 + (15:28:10, 13 December 2024)
- ML20093F591 + (15:28:10, 13 December 2024)
- RC-95-0253, Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-395/95-15.Corrective Actions:Detector Bypass Was Found & Removed Approx 18 H After Seurveillance Test by on-coming Shift Fire Protection Officer + (15:28:11, 13 December 2024)
- ML20093F586 + (15:28:12, 13 December 2024)
- ML20093F585 + (15:28:12, 13 December 2024)
- RBG-19045, Interim Deficiency Rept DR-177 Re Cable for Neutron Monitoring Sys Supplied by Rockbestos.Next Rept Expected by 841128 + (15:28:13, 13 December 2024)
- GO2-95-210, Forwards Response to NRC 950907 Re Violations Noted in Insp Rept 50-397/95-16.Corrective Actions:Implemented Extensive Performance Enhancement Strategy Program + (15:28:14, 13 December 2024)
- ML20093F556 + (15:28:16, 13 December 2024)
- ST-HL-AE-5157, Forwards Physical Security Plan Temporary Addenda That Reflects Addl Security Measures During Const Activities Associated W/Vehicle Barrier Upgrade Project.Plan Withheld + (15:28:18, 13 December 2024)
- ML20093F555 + (15:28:18, 13 December 2024)
- 05000443/LER-1995-005, :on 950731,util Failed to Comply W/Action Requirements in TS 3.3.1.Caused by Inadequate Job Scoping of Ni Calibr Work Package.Ceased All TS Related Work Removed from Refueling Outage to non-outage Period + (15:28:20, 13 December 2024)
- ML20093F544 + (15:28:22, 13 December 2024)
- ML20093F543 + (15:28:22, 13 December 2024)
- L-95-273, Forwards Rev 47 to Physical Security Plan for Plant & Has Determined That Rev Does Not Decrease Effectiveness of Plan. Encl Withheld + (15:28:23, 13 December 2024)
- ML20093F535 + (15:28:23, 13 December 2024)
- RBG-19024, Interim Deficiency Rept DR-242 Re Motor Operator Pinion Gear Fracture in RHR Sys Safety Valve Supplied by Limitorque.Next Rept Expected by 841128 + (15:28:24, 13 December 2024)
- ML20093F532 + (15:28:26, 13 December 2024)
- ML20093F531 + (15:28:26, 13 December 2024)
- ML20093F529 + (15:28:27, 13 December 2024)
- ML20093F525 + (15:28:28, 13 December 2024)
- ML20093F522 + (15:28:28, 13 December 2024)
- ML20093F512 + (15:28:29, 13 December 2024)
- BVY-95-106, Monthly Operating Rept for Sept 1995 for Vynp + (15:28:30, 13 December 2024)
- ML20093F503 + (15:28:30, 13 December 2024)