Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20093L443 + (15:12:29, 13 December 2024)
- ML20093L444 + (15:12:29, 13 December 2024)
- ML20093L442 + (15:12:30, 13 December 2024)
- ML20093L438 + (15:12:30, 13 December 2024)
- ML20093L436 + (15:12:31, 13 December 2024)
- ML20093L432 + (15:12:32, 13 December 2024)
- ML20093L429 + (15:12:33, 13 December 2024)
- ML20093L424 + (15:12:34, 13 December 2024)
- 05000249/LER-1983-029-03, /03X-1:on 830726,Reactor Water Level Surveillance Dis 1500-3 & Reactor Water Level Sensor Lits 3-263-73 a Required Initial Dp Loading of 260 Inches of Water to Move Indicator.Caused by Worn Diaphragm Switch + (15:12:35, 13 December 2024)
- ML20093L419 + (15:12:37, 13 December 2024)
- ML20093L420 + (15:12:37, 13 December 2024)
- ML20093L415 + (15:12:38, 13 December 2024)
- ML20093L414 + (15:12:39, 13 December 2024)
- ML20093L411 + (15:12:39, 13 December 2024)
- ML20093L410 + (15:12:40, 13 December 2024)
- ML20093L405 + (15:12:40, 13 December 2024)
- 05000374/LER-1984-067, :on 840918,reactor Water Cleanup Inboard Isolation Valve 2G33-F001 Closed & Reactor Water Cleanup Pumps Tripped.Cause Unknown.Tech Spec Change Submitted.Sys Restarted + (15:12:42, 13 December 2024)
- ML20093L401 + (15:12:43, 13 December 2024)
- ML20093L399 + (15:12:44, 13 December 2024)
- ML20093L397 + (15:12:45, 13 December 2024)
- ML20093L395 + (15:12:46, 13 December 2024)
- ML20093L392 + (15:12:47, 13 December 2024)
- 05000316/LER-1984-025, :on 840912,hi-hi Level in Steam Generator 2 Caused Operating Turbine Driven Main Feed Pump & Turbine to Trip.Caused by Operator Error & Level Control Problems.Event Discussed W/Appropriate Personnel + (15:12:48, 13 December 2024)
- ML20093L385 + (15:12:49, 13 December 2024)
- NG-95-2961, Forwards Addl Info Re Util Vibration Program & Revised Relief Request PR-07,in Response to NRC Request in 950413 Safety Evaluation of Original IST Relief Request PR-07,for Use of Vibrational Spectrum Data Assessment + (15:12:50, 13 December 2024)
- 05000316/LER-1984-024, :on 840911,reactor Trip Occurred Due to Loss of 120-volt Ac Vital Bus Inverter.Caused by Shorted C2 Capacitor on Shorting Circuit Board.Failed C2 Capacitor Replaced + (15:12:52, 13 December 2024)
- ML20093L381 + (15:12:53, 13 December 2024)
- TXX-4242, Forwards Source Range Neutron Flux Indication Backfit Description for Alternate Shutdown Which Supercedes Methods for Removing High Voltage from Source Range Detector + (15:12:54, 13 December 2024)
- ML20093L380 + (15:12:54, 13 December 2024)
- ML20093L376 + (15:12:55, 13 December 2024)
- ML20093L370 + (15:12:56, 13 December 2024)
- ML20093L374 + (15:12:56, 13 December 2024)
- ML20093L368 + (15:12:57, 13 December 2024)
- ML20093L366 + (15:12:58, 13 December 2024)
- ML20093L358 + (15:12:59, 13 December 2024)
- ML20093L356 + (15:13:00, 13 December 2024)
- 05000327/LER-1984-057, :on 840927,interactions on safety-related Sys Found Not in Compliance w/10CFR50,App R.Fire Watches Already Established Due to Commitments & Will Remain in Effect Until Full Compliance Achieved + (15:13:01, 13 December 2024)
- ML20093L352 + (15:13:02, 13 December 2024)
- ML20093L348 + (15:13:03, 13 December 2024)
- ML20093L346 + (15:13:04, 13 December 2024)
- ML20093L342 + (15:13:10, 13 December 2024)
- ML20093L340 + (15:13:11, 13 December 2024)
- ML20093L338 + (15:13:12, 13 December 2024)
- ML20093L334 + (15:13:13, 13 December 2024)
- 05000374/LER-1984-065, :on 840913,reactor Water Cleanup Sys Isolated on Spurious High Differential Temp,Causing Div II Leak Detection Sys to Trip.Caused by Induced Signal While Performing RCIC Calibr Surveillance + (15:13:15, 13 December 2024)
- ML20093L331 + (15:13:16, 13 December 2024)
- 05000325/LER-1984-024, :on 840913,required Grab Sampling of Gaseous Radwaste Effluents from Common Main Off Gas Stack Not Performed on Time.Caused by Inclement Weather.Sampling Performed 2 H Later + (15:13:18, 13 December 2024)
- W3P84-2764, Second Interim Rept of Significant Const Deficiency 116 Re Failure of Static Uninterruptible Power Supply Inverters. Test Data Undergoing Final Review.Setpoint/Hardware Changes May Be Necessary.Final Rept Expected by 841030 + (15:13:19, 13 December 2024)
- RBG-19093, Interim Deficiency Rept DR-243 Re Installation of Pacific Scientific Supplied Snubbers (PSA-10) & Associated Bergen- Paterson Supplied Clamps (PT 1001-15).Next Rept Expected by 841220 + (15:13:20, 13 December 2024)
- ML20093L322 + (15:13:20, 13 December 2024)
- ML20093L312 + (15:13:22, 13 December 2024)