ML20093L443
| ML20093L443 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 05/25/1984 |
| From: | Cook K LOUISIANA POWER & LIGHT CO. |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML20093L435 | List: |
| References | |
| W3F84-0074, W3F84-74, NUDOCS 8407310411 | |
| Download: ML20093L443 (4) | |
Text
.
4 1'
LOUISIANA 142 DRARONDE STREET POWER & L1GHT e o. Box 6008
- NEW ORLEANS. LOUISIANA 70174 * (504) 366-2345 UTluTIES SYSTEM May 25, 1984 W3F84-0074 3-A45 Mr. E.H. Johnson Chief, Reactor Project Branch 1
$@@%@h U.S. Nuclear Regulatory Commission j
Region IV 611 Ryan Plaza Drive, Suite 1000 h!AY 2 91984 Arlington, Texas 76011 h
SUBJECT:
Louisiana Power & Light Company Waterford 3 SES Docket No. 50-382 Radiation Monitoring System Practical Factors Guide
Dear Mr. Johnson:
In response to a commitment made by LP&L during emergency preparedness inspection 84-23, please find attached the Radiation Monitoring System Practical Factors Guide. Operator walk-throughs utilizing the checklist are scheduled to begin May 28, 1984.
Very truly yours, K.W. Cook Nuclear Support & Licensing Manager KWC/PNB/mlm cc:
W.M. Stevenson, E.L. Blake, B. Churchill, J. Collins, L. Constable 8407310411 g407g3 DR ADOCK 0300039g PDR
I
,y WATERFORD 3 QUALIFICATION CARD LOUISIANA NUMBER POWER & LIGHT NSINSYS M
PREPARED Bh GL DATE: 8 7.4 'N f j
h, O
f[22/ffh REVIEWED BY:
DATE:
TRAINING SUPERVISOR APPROVED BY:
DATE: d Z[ ff4 GROUP /DE ARTMENT HEAD
/
/
f/Zi//fr APPROVED BY:
C DATE:
TRAININ UPERINTENDENT TRAINEE DATA NAME SSN:
LAST FIRST M.I.
DEPARTMENT:
COMPANY:
SIGNATURE:
COMPLETED:
DATE:
TRAINING SUPERVISOR TRAINING RECORD UPDATED BY:
DATE:
RECORD VERIFIED BY:
DATE:
3R6?-1-(ipa _JRrg6MtbwLfA J
RADIATION MONITORING SYSTEM PRACTICAL FACTORS GUIDE NAME I.
Perform or Simulate the following in accordance with applicable procedure on:
A.
RM-23 1.
Display all available information
/
SE DATE 2.
Acknowledge Alarm
/
SE DATE 3.
Source Check
/
SE DATE 4.
Advance filter on applicable monitors
/
(Simulate)
SE DATE 5.
Purge monitor
/
SE DATE e
6.
Start /Stop Monitor flow (pump)
/
(Simulate)
SE DATE 4
7.
Lamp Check
/
SE DATE 8.
Change Alarm Setpoint
/
SE DATE 9.
Initiate Grab Sample on applicable moni". ors
/
SE DATE B.
CP-6 Console Operations 1.
Display Menus
/
Display Grids
/
SE DATE 3.
Display Monitor a.
Monitor History a Alarms
/
SE DATE b.
Monitor Trend
/
SE DATE a
c.
Sourca Check
/
SE DATE d.
Advance filter on applicable monitors
/
(Simulate)
SE DATE e.
Purge Monitor
/
SE DATE f.
Start /Stop Monitor flow (pump)
/
(Simulate)
SE DATE g.
Chango Alarm Setpoints
/
SE DATE h.
Displays Trends
/
SE DATE C.
NMC Process Monitors 1.
Pre Release Test
/
SE DATE 2.
Change Alarm Setpoint
/
SE DATE 3.
Source Check
/
SE DATE II.
Discuss A.
Local Operation of RM-80
/
SE DATE B.
Automatic Actions on Applicable Monitors
/
SE DATE a
C.
System interface with CEPADAS
/
SE DATE D.
Potential Alarms and Operator Response
/
l SE DATE 1
E.
Discuss application of various displays and menus.
/
SE DATE III. Successfully Completed Practical Factors
/
Shift Supervisor DATE IV. Attended System Lecture in Requalification Training
/
Training Supervisor DATE 9