ML20093L443

From kanterella
Jump to navigation Jump to search
Responds to IE Emergency Preparedness Insp 50-382/84-23. Radiation Monitoring Sys Practical Factors Guide Encl,Per Util Commitment During Insp
ML20093L443
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/25/1984
From: Cook K
LOUISIANA POWER & LIGHT CO.
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20093L435 List:
References
W3F84-0074, W3F84-74, NUDOCS 8407310411
Download: ML20093L443 (4)


Text

.

4 1'

LOUISIANA 142 DRARONDE STREET POWER & L1GHT e o. Box 6008

  • NEW ORLEANS. LOUISIANA 70174 * (504) 366-2345 UTluTIES SYSTEM May 25, 1984 W3F84-0074 3-A45 Mr. E.H. Johnson Chief, Reactor Project Branch 1

$@@%@h U.S. Nuclear Regulatory Commission j

Region IV 611 Ryan Plaza Drive, Suite 1000 h!AY 2 91984 Arlington, Texas 76011 h

SUBJECT:

Louisiana Power & Light Company Waterford 3 SES Docket No. 50-382 Radiation Monitoring System Practical Factors Guide

Dear Mr. Johnson:

In response to a commitment made by LP&L during emergency preparedness inspection 84-23, please find attached the Radiation Monitoring System Practical Factors Guide. Operator walk-throughs utilizing the checklist are scheduled to begin May 28, 1984.

Very truly yours, K.W. Cook Nuclear Support & Licensing Manager KWC/PNB/mlm cc:

W.M. Stevenson, E.L. Blake, B. Churchill, J. Collins, L. Constable 8407310411 g407g3 DR ADOCK 0300039g PDR

I

,y WATERFORD 3 QUALIFICATION CARD LOUISIANA NUMBER POWER & LIGHT NSINSYS M

PREPARED Bh GL DATE: 8 7.4 'N f j

h, O

f[22/ffh REVIEWED BY:

DATE:

TRAINING SUPERVISOR APPROVED BY:

DATE: d Z[ ff4 GROUP /DE ARTMENT HEAD

/

/

f/Zi//fr APPROVED BY:

C DATE:

TRAININ UPERINTENDENT TRAINEE DATA NAME SSN:

LAST FIRST M.I.

DEPARTMENT:

COMPANY:

SIGNATURE:

COMPLETED:

DATE:

TRAINING SUPERVISOR TRAINING RECORD UPDATED BY:

DATE:

RECORD VERIFIED BY:

DATE:

3R6?-1-(ipa _JRrg6MtbwLfA J

RADIATION MONITORING SYSTEM PRACTICAL FACTORS GUIDE NAME I.

Perform or Simulate the following in accordance with applicable procedure on:

A.

RM-23 1.

Display all available information

/

SE DATE 2.

Acknowledge Alarm

/

SE DATE 3.

Source Check

/

SE DATE 4.

Advance filter on applicable monitors

/

(Simulate)

SE DATE 5.

Purge monitor

/

SE DATE e

6.

Start /Stop Monitor flow (pump)

/

(Simulate)

SE DATE 4

7.

Lamp Check

/

SE DATE 8.

Change Alarm Setpoint

/

SE DATE 9.

Initiate Grab Sample on applicable moni". ors

/

SE DATE B.

CP-6 Console Operations 1.

Display Menus

/

SE DA W 2.

Display Grids

/

SE DATE 3.

Display Monitor a.

Monitor History a Alarms

/

SE DATE b.

Monitor Trend

/

SE DATE a

c.

Sourca Check

/

SE DATE d.

Advance filter on applicable monitors

/

(Simulate)

SE DATE e.

Purge Monitor

/

SE DATE f.

Start /Stop Monitor flow (pump)

/

(Simulate)

SE DATE g.

Chango Alarm Setpoints

/

SE DATE h.

Displays Trends

/

SE DATE C.

NMC Process Monitors 1.

Pre Release Test

/

SE DATE 2.

Change Alarm Setpoint

/

SE DATE 3.

Source Check

/

SE DATE II.

Discuss A.

Local Operation of RM-80

/

SE DATE B.

Automatic Actions on Applicable Monitors

/

SE DATE a

C.

System interface with CEPADAS

/

SE DATE D.

Potential Alarms and Operator Response

/

l SE DATE 1

E.

Discuss application of various displays and menus.

/

SE DATE III. Successfully Completed Practical Factors

/

Shift Supervisor DATE IV. Attended System Lecture in Requalification Training

/

Training Supervisor DATE 9