D OPERATING DATA REPORT DOCKET NO.
50-286 DATE 10/1/84 COMPLETED BY L-Kall v TELEPHONE
'914) 739-8200 OPERATING STATUS
- 1. Unit Name:
- Indian Point No. 3 Nuclear Power Plant, Notes
- 2. Reporting Period:
- Sentember 1994
- 3. Licensed Thermal Power (MWt):
3025
- 4. Nameplate Rating (Gross MWe):
1013 965
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe).
1000 965
- 7. Maximum Dependable Capacity (Net.MWe):
- 8. If Changes Occur in Capacity Ratingi(Items Number 3 Through 7) Since Last Report. Give Reasons:
i
- 9. Power Level To which Restricted,if Any (Net MWe):
- 10. Reasons For Restrictions. If Any:
This Month Yr..to Date Cumulative 720 6575.0 70,896.0
- 11. Hours in Reporting Period
- 12. Number Of Hours Reactor Was Critical 720 5821.58 40,246.08
- 13. Reactor Reserve Shutdown Hours 0
0 0
720 5595.62 38,737.62
- 14. Hours Generator On.Line 0
0 0
- 15. Unit Reserve Shutdown Hours 2,165,700,13 16,1C2,264.24 102,527,909.24
- 16. Cross Thermal Energy Generated (MWH) 699,680 5,240,595 31,607.205
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH1 674,920_
5,045,053 30,289.231 100.0 85.1 54.6 i
- 19. Unit Service Factor 100 0 85.1 54.6'
- 20. Unit Availability Factor 97 l 79.b 46.7 *
- 21. Unic Capacity Factor (Using MDC Net) 97 l 79.5 43.6
- 22. Unit Capacity Factor (Using DER Net) 13.5 22.2
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:
- Weighted average Mid Cycle 3 team Generator Inspection Outage for Four Weeks Startino October 13, 1984 25 If Shur Down At End Of Report Period. Estimated Date of Startup:
l 26 Units in Test Status iPrior to Commercial Operationi:
Forecast Achieved l
INITIA L CRITICALITY l
INITIA L ELECTRICITY COMMERCI AL OPER ATION 8410180499 840930 DR ADOCK 05000 g
AVERAGE DAll JNIT POWER LEVEL DOCKET NO.
50-286 Indian Point UNIT No. 3 DATE october 1, 1984 COMPLETED BY L Kelly TELEPHONE (914) 739-8200 MONTH september 1984 DAY AVERAGE DA LY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) iMWe-Net)
I 903 17 940 934 940 2
g 936 940 3
937 940 4
39 938 941 5
21 938 940 6
22 939 940 7
937 939 8
24 931 939 9
936 938 It) 939 942 gI 27 938 945 12 28 947 13 29 933 939 34 30 937 15 33 939 16 INSTRUCTIONS
~ On this format. list the average daily unit power level in MWe Net for each da; in the reporting month. Compute to the nearest whole megawatt.
(9/77)
0 0 S
-O e
(
e W
c 2
e
'C N
O
-ll
~
cg t
Z e4 i
e a
O r : d.h O
g m s e
m.-
. d.
c \\
C N 39C"
=
s
- 4 l
-5 " ".%
y*
\\
T
~s
=
e
{ O m
y y
=""
p e4 M 7,
- s
=
i ~1
=
=
c _= 4 -
=
- 2 3 H >as Z d.3
== 5 4 I E
e' W W
=W
=
4-C
- u ;:
E '~ C
': =
1MEC
=
- 3 $,
.= @2 %
f" Z A.
ph 4J
=
- d =-
In3e. w g( =.
=._. x_ = -
a
=
=.
=
Z.
J-
.a u
= - 9 w.
g g W,
=s-e y
(
14 40
=
a-
=
?
W r,
w R
I a
Z E
e
, s O_
w E
m g Po]
8 bXli 5r W
tu3uoduJo3 -
m
=&
a WQ u
.. q :; = -
] ===== $
=
g
.= es -s = "
h Wy a
tus:s45 2 hiQ UE m m -r o
o a.
(O A
=
C
. M
-Z,:
s o
Z 2
3_ =.
2w$
UW g
E a
=
Q
.a
=
-&g W
n m
==
-M
=n
.30l.9$3M u.D z
t
.upings Jo M 38W 3
p f,
. $3c.
E.
3
,5 4
N J
.g.$ m'.=*:0 6
3 2sc en U C k.M
(
- % 'E 3 ".=
n J
x s=.=
($Jf10IN o g c=c. H..,.6
-==
x 5.-
uoric;na
=
.e E
- c..,. =
.. = = -
C'= = w. _= "no u* g a -
a
- *I y-s -n u e c.=s ad22%C<6C 8dAJ.
5 4 s G d i 'i d d g
Pt O
5 O
e g:
i O
j Z
s=
us
'J U
LM Z
%M m
N e
4
' - ~ * * * - ~ ~ " - -
MONTHLY I & C CATEGORY I REPORT September 1984 Month W.R. #
DATE EQUIPMENT MALFUf:CTION CORRECTIVE ACTION 3163 9/18/84 Safety Injection Train A Faulty light socket # 735 Replaced light socket Control Room Light Indicator 3094 9/8/84 Power Range Channel 43 Defective hi-volt supply Peplaced hi-volt supply 3091 9/24/84 Over Pressurization System Improper reading Recalibrated :ndicator Pressure Indicator PT 443 3116 9/18/84
- 32 Hydrogen Recombiner Pilot Relay contacts defective Replaced relay contact Flame Relay CR-6 assembly 3139 9/19/84 31 Diesel Generator Pyrometer Improper reading Tightened thermocouple con-
- Points 3 & 5 nection at selector s.tch 3141 9/20/84 Pressurizer Leve] Inelicator Improper indication Calibrated meter LI460 3157 9/27/84 R50 Radiation Maaitor -
Local drawer assembly in-Reconnected loose wire Laundry Liquid operative 3159 9/21/84 R14 Radiation Monitor -
Test position inoperative Performed full drawer cali-Plant Vent bration
p m
i.,
k
%L,
.s... *'
.e,
..e
.I,..
)
g,
!Q MONTHLY I & C' CATEGORY I REPORT x
h September:I19841
. Month -
W.R.'
DATE EQUIPMENT MALFUNCTION CORRECTIVE'ACTIdN i3177 9/27/84-Relay R-10 Reactor Protection Coil of relay open, circuit' Replaced' relay' Train A 4
~
'3210
'9/28/84 Rod Position Indicator M 12, Meter acts erratic Cleaned and adjusted meter
-3213
.9/28/84 Rod Position Indicator C 11 Rod bottom light up Replaced fuse blown fuse I
e v
.s P
W h
e 4
i
H:,
1 MONTHLY MAINTENANCE REPORT' c
September 1984 MONTH-s WR#
DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION
~
3028~
09/06/84 Boric Acid Transfer Pump; seal and casing.
Replaced pump Pump #32 leak 5100
.09/06/84-Hot Penetration' Stripped gear
' Replaced blower Blower #32
'Repl'ced blower 1
~
5101 09/06/84 Hot Penetration Shaft' broken a
Blower #31 5005.
09/06/84 Zurn Strainer #33 Operator will not Clean and lubricate operator Auto Blowdown Function-5080 09/06/84 Instrument Air' Refrigerant Dryer inoperative Repaired loose connection at Dryer #32
' control' fuse
~
5118 09/10/84 Service' Water Zurn Blowdown line clogged Backwashed and' flushed line Strainer #36 5089 09/11/84.
Electric Heat Tracing Test lights Replaced bulbs and cleaned.
Circuit 2,9,15, 26 and 36 inoperative contacts 5221 09/18/84 Radiation Monitor R-13 Motor malfunction Replaced motor and belts:
Sampling Motor T
5190 09/19/84 Containment Fan Cooler Motor malfunction.
Repl'eced motor Unit #33 5210 09/21/84 Service Water Zurn Motor trips..on overload Adjusted. overload Strainer #35 5211' 09/21/84 Service Water Zurn Backwash line clogged
- Flushed line Strainer #36
^
~
.5256-09/21/84
-Instrument Air Motor has.high vibrations Replaced belts and torqued-Compressor #31 motor < bolts 4
MONTHLY MAINTENANCE REPORT September 1984 MONTH WR#
DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 4973 09/24/84 Primary Water Valve 723 Bonnet leaks Torqued bonnet bolts 5151 09/24/84 Diesel Generator #31 Heater inoperative Repaired wiring in terminal box.
Electrical Generator Heater 5195 09/24/84 Pressure Relief Tank Valve malfunction Repaired wiring to valve Sample Valve 958 5272 09/26/84 Service Water Zurn Valve inoperative Rebuilt valve Strainet #36 Blowdown Valve SWN-64 5323 09/28/84 Containment Fan Cooler Motor cooler leaks Replaced cooler Unit #33 I
s 9
- * \\-
.,e._
e e-?
,, ?
SUMMARY
OF OPERATIVE EXPERIENCE SEPTEMBER 1984 1
Indian Point U' nit l3 was~ synchronized to the bus for a total of 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> producing a gross generation of 699,680 MWH for this reporting period.
The unit remained on line' for the entire reporting period without s-experiencing any trips or-reportable load reductions.
~
1 a
b.-U _, _
Indian Point 3 Nuclear Power Plant P.O. Box 215 Buchanan, New'.twk 10511 914 739.8200
- > NewWrkPower 4# Authority October 11, 1984 IP-LK-3570 Docket No. 50-286 License No. DPR-64 Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Document Control Desk
Dear Sir:
^
Enclosed you will find twelve copies of the monthly operating report relating to Indian Point 3 Nuclear Power Plant for the month of September, 1984.
Very ruly yours, W
John C. Brons Resident Manager LK/bam s _)
Enclosures (12 Copies) cc:
Dr. Thomas E. Murley, Regional Administrator Region i U. S. Nuclear Regulatory Con: mission 631 Park Avenue King of Prussia, Pennsylvania 19406 IP3 Resident Inspectors' Office George Wilverding (SRC), WP0 J. P. Bayne, WP0 S. V. Fuller, NYO W. R. Yario, NYO INP0 Records Center Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30339 SV l
\\