Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20094L476 + (14:20:43, 13 December 2024)
- ML20094L475 + (14:20:45, 13 December 2024)
- ML20094L470 + (14:20:46, 13 December 2024)
- ML20094L468 + (14:20:47, 13 December 2024)
- ML20094L467 + (14:20:47, 13 December 2024)
- NG-95-3072, Forwards Rev 0 to MPR-1536, DAEC USI A-46 Seismic Evaluation Rept & Rev 0 to MPR-1545, DAEC USI A-46 Relay Evaluation Rept, Per GL 87-02 + (14:20:48, 13 December 2024)
- HL-5069, Agrees W/Nei Comments Provided to NRC on Notice of Proposed Rulemaking, Safeguards for Spent Nuclear Fuel or High-Level Radwaste Published in Fr on 950815 + (14:20:49, 13 December 2024)
- ML20094L453 + (14:20:49, 13 December 2024)
- ML20094L451 + (14:20:50, 13 December 2024)
- ML20094L442 + (14:20:51, 13 December 2024)
- ML20094L444 + (14:20:51, 13 December 2024)
- ML20094L434 + (14:20:52, 13 December 2024)
- ML20094L417 + (14:20:53, 13 December 2024)
- ML20094L408 + (14:20:54, 13 December 2024)
- ML20094L414 + (14:20:54, 13 December 2024)
- ML20094L387 + (14:20:55, 13 December 2024)
- ML20094L379 + (14:20:57, 13 December 2024)
- ML20094L380 + (14:20:57, 13 December 2024)
- ML20094L378 + (14:20:58, 13 December 2024)
- ML20094L367 + (14:20:59, 13 December 2024)
- ML20094L364 + (14:21:00, 13 December 2024)
- BSEP-95-0561, Application for Amends to Licenses DPR-62 & DPR-71,modifying RPS Electrical Protective Assemblies Channel Functional Test Surveillance Interval in TS SR 4.8.2.5.a,per GL 91-09 + (14:21:01, 13 December 2024)
- 05000277/LER-1995-006-02, :on 951022,transfer of Startup Circuits Resulted in PCIS Group II Half Isolation on Both Units Due Loss of One Offsite Power Source.Pcis Group II Isolation Logics Reset & Affected Sys Restored.W/Undated Ltr + (14:21:03, 13 December 2024)
- BVY-95-124, Responds to NRC Re Violations Noted in Insp Rept 50-271/95-22 on 950918-29.Corrective Actions:Util Will Perform Focussed & Comprehensive Review of IST Program Scope to Verify Compliance W/Asme/Ansi OMa-1988 Parts 1,6 & 10 + (14:21:04, 13 December 2024)
- RBG-42170, Suppl to Special Rept Re Invalid Failure of Div II EDG When Diesel Room Standby Ventilation Fan Failed to auto-start During Monthly Operability Test.Replacement EDG Ventilation Fan Breaker Installed & Verified Operable + (14:21:04, 13 December 2024)
- ML20094L353 + (14:21:05, 13 December 2024)
- ML20094L351 + (14:21:06, 13 December 2024)
- 05000361/LER-1992-008, :on 920218,primary Water Stress Corrosion Cracking of Pressurizer Instrument Nozzles.Noted.Caused by Rust & Boric Acid Crystals.Nozzle Replaced & Interim Repair Will Be Implemented + (14:21:07, 13 December 2024)
- RC-95-0184, Application for Amend to License NPF-12,consisting of TS Change Request 940007,removing Spec for MOVs Thermal Overload Protection & Bypass Devices (3/4.8.4.2) to Follow Guidance of Improved Westinghouse Standardized TS + (14:21:08, 13 December 2024)
- ML20094L340 + (14:21:09, 13 December 2024)
- ML20094L338 + (14:21:10, 13 December 2024)
- HL-5071, Forwards Response to NRC Re Violation Noted in Insp Repts 50-321/95-22 & 50-366/95-22.Corrective Actions: Involved Operator Temporarily Disqualified from Performing Evolutions That Affect Reactivity + (14:21:11, 13 December 2024)
- LIC-95-0211, Responds to Items 2-4 of GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity + (14:21:11, 13 December 2024)
- 0CAN068408, Responds to NRC Re Violations Noted in IE Insp Repts 50-313/84-11 & 50-368/84-11.Requests Addl Time to Complete Response to Items Noted in Rept.Response Will Be Forwarded by 840629 + (14:21:12, 13 December 2024)
- ML20094L320 + (14:21:13, 13 December 2024)
- NG-95-3073, Forwards Summary Rept of IPEEE, Per Suppl 4 to GL 87-20,in Conjunction W/Resolution of USI A-46 + (14:21:14, 13 December 2024)
- ML20094L307 + (14:21:15, 13 December 2024)
- ML20094L305 + (14:21:16, 13 December 2024)
- ML20094L288 + (14:21:17, 13 December 2024)
- RBG-18409, Interim Deficiency Rept DR-154 Re High Voltage Cable Terminations.Next Rept Will Be Provided by 840920 + (14:21:17, 13 December 2024)
- ML20094L286 + (14:21:18, 13 December 2024)
- ML20094L282 + (14:21:19, 13 December 2024)
- ML20094L283 + (14:21:19, 13 December 2024)
- ML20094L278 + (14:21:20, 13 December 2024)
- 05000366/LER-1995-005-03, :on 951020,personnel Error Resulted in Automatic Initiation of Edgs.Counseled & Retrained Involved Individual Re self-verification Techniques + (14:21:22, 13 December 2024)
- ML20094L265 + (14:21:23, 13 December 2024)
- 05000296/LER-1995-005-03, :on 951013,RHR Injection Valve Was Inadvertently Closed as Result of Personnel Error.Briefed & Counseled Personnel Involved + (14:21:32, 13 December 2024)
- ML20094L248 + (14:21:33, 13 December 2024)
- 05000368/LER-1995-006-03, :on 951018,discovered That Rwa Gaseous Effluent Flowpath Not Continuously Monitored as Required by TS Due to Separated Sample Line Connection.Procedures for Using Sampling Equipment Revised + (14:21:35, 13 December 2024)
- ML20094L241 + (14:21:36, 13 December 2024)
- B15424, Clarifies 950609 Proposed Rev to TS Re Secondary Containment Per 951004 Telcon W/Nrc.Revised TS Pages Encl + (14:21:37, 13 December 2024)