ML20094L351

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Rev 84-02 to Emergency Plan Implementing Procedures
ML20094L351
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 07/17/1984
From: Tucker H
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20094L354 List:
References
NUDOCS 8408150326
Download: ML20094L351 (1)


Text

- _ _ _ _ _ - _ _ _ _ - - _. _ _ _ _ _ _ _ _

e Duxe POWER GoxP.wr P.O. BOX 33180 CHARLOTTE, N.C. 28242 HAL B. TTICKER Tetzenose

(* * * ' * "

,, ".." 1 Jul 17, 1984 Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Re: Oconee Nuclear Station Docket Nos. 50-269, 50-270, 50-787 GNS Emergency Implementing Procedures Manual Revision 84-02

Dear '.fr. O'Reilly:

Please find attached for your use and review two copies of Revision No. 84-02 to the Oconee Nuclear Station Emergency Implementing Procedures Manual.

These revisions are being submitted in accordance with 10 CFR 50.54(q) and do not decrease the effectiveness of the Emergency Plan Implementing Procedures or Emergency Plan. Please note that the revised material " Emergency Telephone Numbers" is consicered confidential and is not for publication.

By copy of this letter, two copies are provided to Document Control Desk, NRG, Washington, D. C.

Very truly yours, W

kW Hal B. Tucker PFG/rhs Attachments cc:

U.

d. auc ear egu atory Commission Washington, D. C.

20555 8408150326 840717 DR ADOCK 05000269 PDR b

4

- ~'-

_. _. _. _. _ _.