Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20095L476 + (13:15:50, 13 December 2024)
- ML20095L473 + (13:15:50, 13 December 2024)
- TXX-4284, Forwards Response to 840827 Request for Info Re Status of Human Engineering Deficiencies & Clarifications to Control Room Design Review Implementation Audit + (13:15:51, 13 December 2024)
- ML20095L458 + (13:15:51, 13 December 2024)
- ML20095L429 + (13:15:52, 13 December 2024)
- ML20095L417 + (13:15:53, 13 December 2024)
- ML20095L413 + (13:15:56, 13 December 2024)
- ML20095L397 + (13:15:58, 13 December 2024)
- ML20095L393 + (13:15:59, 13 December 2024)
- ML20095L392 + (13:15:59, 13 December 2024)
- BVY-95-141, Forwards 1995 Rept in Accordance w/10CFR50.46(a)(3)(ii) for Plant & Summary of Transition from Using GE Safe/Reflood ECCS Methodology to Using NRC Approved RELAP5YA Evaluation Methodology + (13:16:00, 13 December 2024)
- ML20095L386 + (13:16:02, 13 December 2024)
- ML20095L385 + (13:16:02, 13 December 2024)
- ML20095L383 + (13:16:03, 13 December 2024)
- ML20095L380 + (13:16:03, 13 December 2024)
- ML20095L375 + (13:16:04, 13 December 2024)
- B14096, Forwards Westinghouse Nonproprietary Repts WCAP-13003 & WCAP-13057 & Proprietary Repts WCAP-13002 & WCAP-13056 Re Margin to Overfill Analysis for SGTR for Unit 3 three-loop & four-loop Operation.Proprietary Repts Withheld + (13:16:06, 13 December 2024)
- ML20095L372 + (13:16:06, 13 December 2024)
- TAC:55555 + (13:16:07, 13 December 2024)
- ML20095L365 + (13:16:08, 13 December 2024)
- ML20095L362 + (13:16:10, 13 December 2024)
- ML20095L355 + (13:16:12, 13 December 2024)
- ML20095L354 + (13:16:13, 13 December 2024)
- ML20095L350 + (13:16:14, 13 December 2024)
- ML20095L353 + (13:16:14, 13 December 2024)
- ML20095L348 + (13:16:15, 13 December 2024)
- ML20095L341 + (13:16:16, 13 December 2024)
- ML20095L339 + (13:16:16, 13 December 2024)
- ML20095L337 + (13:16:17, 13 December 2024)
- ML20095L335 + (13:16:18, 13 December 2024)
- LD-92-057, Forwards Draft Section 7 of Distribution Sys Design Guide, Discussed at Mechanical & Piping Sys Audit Meeting on 920422-23 in Charlotte,Nc,Per Commitment in Vendor + (13:16:19, 13 December 2024)
- ML20095L313 + (13:16:19, 13 December 2024)
- LD-92-063, Forwards Info to Supplement 920325 Responses to NRC Request for Addl Info Re Analysis of Ruptured Reactor Coolant Pump Seal Cooler Tube & Single Failure Assumptions for Analysis of moderate-energy-line Break + (13:16:23, 13 December 2024)
- LD-92-060, Forwards Draft Sys 80+ Tier 1 Design Descriptions & Insps, Tests,Analyses & Acceptance Criteria for Sys 80+ Std Design.Meeting Requested on 920512 to Discuss Encl Design Descriptions + (13:16:24, 13 December 2024)
- ML20095L268 + (13:16:25, 13 December 2024)
- PLA-2281, Special Rept:On 840528,during Startup Test 14.2, Reactor Vessel Injections, Two RCIC Sys Actuations Resulted in Injection of Water Into Rcs.Current Usage for Affected Nozzles Less than 0.70 + (13:16:25, 13 December 2024)
- ML20095L253 + (13:16:26, 13 December 2024)
- ML20095L237 + (13:16:27, 13 December 2024)
- ML20095L240 + (13:16:27, 13 December 2024)
- ML20095L233 + (13:16:28, 13 December 2024)
- ML20095L230 + (13:16:29, 13 December 2024)
- BECO-LTR-95-127, Forwards Response to NRC RAI Re Internal Event Analysis in Response to GL 88-20 + (13:16:30, 13 December 2024)
- ML20095L223 + (13:16:30, 13 December 2024)
- ML20095L221 + (13:16:31, 13 December 2024)
- ML20095L218 + (13:16:31, 13 December 2024)
- ML20095L214 + (13:16:32, 13 December 2024)
- ML20095L208 + (13:16:33, 13 December 2024)
- ML20095L212 + (13:16:33, 13 December 2024)
- ML20095L207 + (13:16:35, 13 December 2024)
- ML20095L195 + (13:16:36, 13 December 2024)
- ML20095L197 + (13:16:36, 13 December 2024)