Unit 2 PBAPS LlHITING CONDil!ONS FOR OPERATION Sl'RVEILLANCE REQUIREMENTS
~'
4.9.A.I.2.f (Continued)
- 4. Verifying that all automatic diesel generator trips except engine overspeed, genarator differential over-current, generator ground overcurrent and manual cardox initiation are automatically bypassed upon an ECCS actuation signal.
5.Verifyingthecleselgenerator operates for at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. During the first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of this test, the diesel generatorshallbeloagedtoan indicated 2300-3000 kW and during the remaining 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> of this test, the diesel generator shall be loa d to an indicated 2400-2600 kW
- 6. Verifying diesel generator capability at full load temperature within 5 minutes afte{bystartingandcompleting the 24 ho test loading the diesel as described-in Surveillance Requirement 4.9.A.1.2.bandoperatfngfor greater than 5 minutes aThis test shall be conducte<' in accordance with the manufacturer's recommendations regarding engine prelube and warm-up and, as applicable, loading and shutdown.
bThis band is meant as guidaice to avoid routine overloading of the engine.
Loads in excess of this band for special testing, under direct monitoring by the manufacturer or system engineer, or momentary variations due to changing bus loads shall not invalidate the test.
cif Surveillance Requirement 4.9.A.1.2.f.6 is not satisfactorily completed, it is not necessary to repeat the preceding 24-hour test.
Instead, the diesel generator may be operated at 2400-2600 kW for 1-hour or until operating temperature has stabilized prior tc
~ performing Surveillance Requirement.4.9.A.1.2.f.6.
dPerformance ci Surveillance Requirement 4.9.A.1.2.f.6 will not be used to satisfy the requirements of Surveillance Requirement 4.9.A.1.2.b.
L 9205070002 920428 gDR
-218e-l ADOCK 0500 7
Unit 3 PBAPS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS l
4.9.A.I.2.f (Continued)
- 4. Verifying that all automatic diesel generator trips except engine overspeed, generator differential over-current, generator ground overcurrent and manual cardox initiation are automatically bypassed upon an ECCS actuation signal.
5.Verifyingthedieselgenerator operates for at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. During the first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of this test, the diesel generatorshallbeloagedtoan indicated 2800-3000 kW and during the remaining 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> of this test, the diesel generator shall be loa d to an indicated 2400-2600 kW
- 6. Verifying diesel generator capability at ful) load temperature within 5 minutes after completing the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> testc by starting and loading the diesel as described in Surveillance Requirement 4.9.A.1.2.bandoperatjngfor greater than 5 minutes.
aThis test shall be conducted in accordance with the manufacturer's recommendations regarding engine prelube and warm-up and, as pplicable, loading and shutdown.
bThis: band is meant as guidance to avoid routine overloading of the engine.
Loads in excess of this band-for special testing, under direct monitoring by the manufacturer or system engineer, or momentary variations due to changing bus loads shall not invalidate the test.
CIf Surveillance Requirement 4.9.A.l.2.f.6 is not satisfactorily completed, it is not necessary to repeat the preceding 24-hour test.
Instead, tha diesel generc'or may be operated at 2400-2600 kW for. I hour or until operating temperature has stabilized prior to performing Surveillance Raquirement 4.9.A.1.2.f.6.
dPerformance of' Surveillance Requirement 4.9.A.1.2.f.6 will not be used to satisfy the l
- requirements of Surveillance Requirement 4.9 A.1.2.b.
L l
L l
L
-218e-
Unit 2 PBAPS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS
'3.9.'B (Continued) 6.
With fuel oil in one of the diesel
- 6. None generator main storage tanks not available or not in conformance with Surveillance Requirement 4.9.A.1.2.e, implement the following:
a.
Isolate the main storage tank from the system, with the associated diesel generator being supplied from one of the remaining storage tanks within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, and b.
Establish and mali.tain a minimum of 108,000 gallons of diesel fuel oil in the other three main storage tanks within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, and c.
Sample the fuel oil in the other three main storage tanks and confirm conformance with specification 4.9.A.l.2.e within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and d.
Replace the unacceptable fuel oil witn acceptable fuel and return the storage tank to service within 7 days, or place the reactor in Cold Shutdown within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
Accelerated testing of the diesel generators is not required.
7.
With one of the 4kV emergency busses
- 7. Ncne or 480V emergency load centers
.equired by 3.9.A.3 not energized, declare the associated equipment inoperable and take the appropriate action for that system.
Reenergize the bus within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, l
-220b-I
Unit 3 PBAPS LlHITING CONDITIONS FOR OPERA 110N SURVEILLANCE REQUIREMENTS l
'3.9.'B (Continued) 6.
With fuel oil in one of the diesel
- 6. None l
j generator main storage tanks not j
l available or not in conformance with l
Surveillance Requirement 4.9.A.1.2.e, implement the following:
a.
Isolate the main storace tank from the system, with the as>ociated diesel generator being supplied from one of the remaining storage tanks within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and b.
Establish and maintain a minimum of 108,000 gallons of diesel fuel oil in the other three main storage tanks within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, and c.
Sample the fuel oil in the other three main storage tanks and confirm conformance with specification 4.9.A.1.2.e'within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and d.
Replace the unacceptable fuel oil with acceptable fuel and reture) the storage tank to service within 7 days, or place the reactor in Cold Shutdown within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
Accelerated testing of the diesel generators is not required.
7.
With one of the 4kV emergency busses
- 7. None or 480V emergency. load centers required by 3.9.A.3 r.ot energized, declare the' associated equipment inoperable and take the appropriate action for.that system.
Reenergize the bus within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in COLD SHOT 00WN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
L.
L
?-
I 220h-g
-w+e.
r +
e
.+