Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000271/LER-1984-015, :on 840724,during Second Verification That Diesel Generator B 4 Kv Bus Pot Fuse Drawer Racked in, Operator Inadvertently Withdrew Drawer.Caused by Insufficent Instructions + (13:14:29, 13 December 2024)
- 05000388/LER-1984-014-01, :on 840723,reactor Water Cleanup Inlet Outboard Board Isolation Valve (2F004) Closed Due to High Temp in Filter Demineralizer Room.Caused by Problems W/Reactor Bldg Chilled Water Sys + (13:14:31, 13 December 2024)
- ML20096A064 + (13:14:33, 13 December 2024)
- DCL-84-262, Requests Exam & Test Requirements for All Presently Licensed Personnel for Unit 1 Be Waived for Unit 2 & Combined OLs for Units 1 & 2 Be Issued.Supporting Documentation Encl.Related Correspondence + (13:14:34, 13 December 2024)
- 05000271/LER-1984-014, :on 840723,during Weekly Environ Air Sample Collections,Sample Station at 1.2 Discovered Not Drawing Continuous Sample.Caused by Blown Main Fuse.Fuse Replaced & Equipment Returned to Svc + (13:14:35, 13 December 2024)
- ML20096A043 + (13:14:36, 13 December 2024)
- ML20096A040 + (13:14:37, 13 December 2024)
- ML20096A035 + (13:14:38, 13 December 2024)
- ML20096A023 + (13:14:42, 13 December 2024)
- ML20096A012 + (13:14:42, 13 December 2024)
- 3F0492-15, Comment Concurring W/Comments Offered by NUMARC on Sections 7 & 8 of Draft NUREG-1449, Shutdown & Low-Power Operation at Commercial Nuclear Power Plants in Us. Urges NRC to Consider Comments Carefully + (13:14:43, 13 December 2024)
- B14123, Requests Relief from ASME Boiler & Pressure Vessel Code Section XI Requirements to Make Interim Repairs to Leak in Piping as Alternative to IWA-7000 repair/IWA-7000 Replacement,In Response to GL 90-05 + (13:14:44, 13 December 2024)
- ML20095L818 + (13:14:44, 13 December 2024)
- ML20095L810 + (13:14:45, 13 December 2024)
- B14126, Informs That Development of Full & Comprehensive FSAR Update,Including RG 1.97 Instrumentation List Requires Addl Time & That Util Intends to Meet Schedule of 920630 for Submittal of FSAR Update,Per Insp Rept 50-336/91-16 + (13:14:46, 13 December 2024)
- ML20095L778 + (13:14:46, 13 December 2024)
- ML20095L774 + (13:14:48, 13 December 2024)
- ML20095L771 + (13:14:49, 13 December 2024)
- ML20095L758 + (13:14:50, 13 December 2024)
- RBG-42325, Forwards Info Supporting Request as Required by Instruction Manual Operations - Notices of Enforcement Discretion + (13:14:52, 13 December 2024)
- ML20095L748 + (13:14:52, 13 December 2024)
- ML20095L692 + (13:14:53, 13 December 2024)
- ML20095L686 + (13:14:54, 13 December 2024)
- 05000311/LER-1984-019, :on 840726,during Controlled Cooldown to Mode 5,both Containment Spray Pumps Inadvertently Cleared & Tagged While Unit in Mode 4,contrary to Tech Specs.Caused by Personnel Error.Pumps Returned to Svc + (13:14:56, 13 December 2024)
- 05000388/LER-1984-013-01, :on 840726,during Scram Due to Turbine Control Valve Fast Closure & Deenergization of 13.8 Kv & 14.16 Kv Buses,Control Rods Did Not Fully Insert.Caused by Failure of Diesel Generators to Start Automatically + (13:14:58, 13 December 2024)
- ML20095L668 + (13:14:59, 13 December 2024)
- ML20095L655 + (13:15:00, 13 December 2024)
- ML20095L650 + (13:15:02, 13 December 2024)
- ML20095L629 + (13:15:05, 13 December 2024)
- 05000339/LER-1992-010, :on 920413,determined That as-found Cold Leg Branch Flows Insufficient to Meet TS Requirements.Probably Caused by Repositioning of Valves Using Stem Height Measurement.Stem Lock Covers Installed + (13:15:06, 13 December 2024)
- ST-HL-AE-1122, Final Deficiency Rept DER 84-016 Re ASTM A-194 Grade 2H & ASTM A563 Grade a Nuts.Initially Reported on 840713.ASTM A563 Grade a Std Hex Nuts Will Be Purged from Site.Item Considered Not Reportable Per 10CFR50.55(e) + (13:15:07, 13 December 2024)
- ML20095L606 + (13:15:08, 13 December 2024)
- ML20095L605 + (13:15:09, 13 December 2024)
- ML20095L600 + (13:15:09, 13 December 2024)
- ML20095L599 + (13:15:10, 13 December 2024)
- ML20095L591 + (13:15:11, 13 December 2024)
- ML20095L590 + (13:15:13, 13 December 2024)
- ML20095L585 + (13:15:14, 13 December 2024)
- ML20095L587 + (13:15:14, 13 December 2024)
- ML20095L584 + (13:15:15, 13 December 2024)
- 05000311/LER-1984-018-01, :on 840725,during Pressurizer Overpressure Protection Sys Functional Test,Rcs Pressure Rapidly Dropped Upon Opening PORV Block Valve 2PR6.Valve Failed to Close in Required Time & Resulted in Reactor Trip + (13:15:20, 13 December 2024)
- ML20095L581 + (13:15:21, 13 December 2024)
- 05000293/LER-1977-030-03, /03X-1:on 770806,during Normal Shutdown for Refueling Outage 3,CRD 34-11 Remained full-out When Reactor Scrammed.Probably Caused by Foreign Substance Restricting Normal Operation.Crd Replaced + (13:15:22, 13 December 2024)
- ML20095L575 + (13:15:24, 13 December 2024)
- ML20095L570 + (13:15:25, 13 December 2024)
- ML20095L572 + (13:15:25, 13 December 2024)
- ML20095L563 + (13:15:26, 13 December 2024)
- ML20095L564 + (13:15:26, 13 December 2024)
- ML20095L559 + (13:15:29, 13 December 2024)
- LD-92-059, Forwards Nonproprietary & Proprietary Slides Presented at 920319 Meeting W/Nrc Re Sys 80+ Reactor Coolant Pump Seal Design & Performance as Suppl to RAI Responses,In Ref to .Proprietary Slides Withheld (Ref 10CFR2.790) + (13:15:30, 13 December 2024)
- 05000321/LER-1984-013, :on 840729,during Procedure HNP-1-3154,HPCI Malfunctioned & Injected Into Reactor.Caused by Short Circuit Across 1/2 of HPCI Automatic Injection Logic.Hpci Test Jack E41-J1 Inspected & Cleaned + (13:15:31, 13 December 2024)