Ny*****44 NORTHEAST NUCLEAR ENERGY COMPANY. ET AL.
3 4
DOCKET NO. 50-423 MILLSTONE NUCLEAR POWER STATION. UNIT NO. 3 i
l AMENDMENT TO FACILITY OPERATING LICENSE i
Amendment No.123 License No. NPF-49 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Northeast Nuclear Energy
'l Company, et al. (the licensee) dated July 17, 1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission;
\\
C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; i
and l
E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
\\0 9601040028 951228 PDR ADOCK 05000423 p
PDR i
4
1l
' t 1
6 2.
Accordingly, the license is amended by changes to the Technical i
Specifications as, indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-49 is hereby amended to read as follows:
(2)
Technical Soecifications j
The Technical Specifications contained in Appendix A, as revised through Amendment No.123
, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
l 3.
This license amendment is effective as of the date of its issuance, to be implemented within 90 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION i
Phillip F. McKee, Director Project Directorate I '
Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: December 28, 1995 i
l 4
4 4
j
2 4
ATTACHMENT TO LICENSE AMENDMENT N0.123 FACILITY OPERATING LICENSE NO. NPF-49
)
DOCKET NO. 50-423 i
Replace the following pages of the Appendix A, Technical Specifications, with the attached pages.
The revised pages are identified by amendment number and contain vertical lines indicating the areas of change.
{
Remove Insert 3/4 6-19 3/4 6-19 3/4 6-20 3/4 6-20 3/4 7-16 3/4 7-16
)
^
3/4 7-19 3/4 7-19 3/4 7-20 3/4 7-20 i
3/4 7-21 3/4 7-21 3/4 9-13 3/4 9-13 1
3/4 9-14 3/4 9-14 3/4 9-15 3/4 9-15 B3/4 6-6 B3/4 6-6
}
5 i
W 4
l 1
4 i
4
{
CONTAllglENT SYSTEMS i
3/4.6.6 SEC0E ARY CONTAllelENT SUPPLEMENTARY LEAK COLLECTION Als RELEASE SYSTEN i
LIMITING CO M ITION FOR OPERATI0li i
i 3.6.6.1 Two independent Supplementary Leak Collection and Release Systems shall be OPERABLE with each system comprised of:
l a.
one OPERABLE filter and fan, and i,
b.
one OPERABLE Auxiliary Building Filter. System as defined in j
Specification 3.7.9.
l APPLICABILITY: N0 DES 1, 2, 3, and 4.
j EIl0$:
I With one Supplementary Leak Collection and Release System inoperable, restore
{
the inoperable system to OPERf3LE status within 7 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 4
30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
j l
SURVEILLANCE REQUIREMENTS i
}
4.6.6.1 Each Supplementary Leak Collection and Release System shall be demon-i strated OPERABLE:
l l
a.
At least once per 31 days on a STAGGERED TEST BASIS by initiating, i
from the control room, flow through the HEPA filters and charcoal l
adsorbers and verifying a system flow rate of 7600 cfm to 9800 cfm l
and that the system operates for at least 10 continuous hours with the heaters operating, i
l b.
At least once each REFUELING INTERVAL or (1) after any structural l
maintenance on the HEPA filter or charcoal adsorber housings, or (2) l following painting, fire, or chemical release in any ventilation zone communicating with the sye+.es by:
1)
Verifying that the system satisfies the in-place penetration and bypass leakage testing acceptance criteria of less than 0.05f, and uses the test procedure guidance in Regulatory Posi-l tions C.5.a, C.S.c, and C.S.d of Regulatory Guide 1.52, Revi-sion 2, March 1978,* and the system flow rate is 7600 cfm to i
9800 cfs; i
MILLSTONE - WIT 3 3/4 6-19 Amendment No. J, 57, 57, ese Jpp,123 l
i
1 i
i CONTAllelENT SYSTEMS SURVEILLANCE REQUIRENENTS (Continued) i
~
2)
Verifying, within 31 days after removal, that a laboratory i
analysis of a representative carbon sample obtained in accord-ance with Regulatory Position C.6.b of Regulatory Guide 1.52, i
Revision 2, March 1978,* meets the laboratory testing criteria of Regulatory Position C.6.a of Regulatory Guide 1.52, Revi-i sion 2, March 1978,* for a methyl todido penetration of less j
than 0.175%; and i
3)
Verifying a system flow rate of 7600 cfm to 9800 cfm during system operation when tested in accordance with ANSI N510-1980.
1 i
c.
After every 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of charcoal adsorber operation, by verifying, j
within 31 days after removal that a laboratory analysis of a repre-sentative carbon sample obtained in accordance with Regulatory j
Position C.6.b of Regulatory Guide 1.52, Revision 2, March 1978,*
i meets the laboratory testing criteria of Regulatory Position C.6.a i
of Regulatory Guide 1.52, Revision 2, March 1978,* for a methyl iodide penetration of less than 0.175%:
4 d.
At least once each REFUELING INTERVAL by:
l 1)
Verifying that the pressure drop across the combined HEPA i
filters and charcoal adsorber banks is less than 6.25 inches Water Gauge while operating the system at a flow rate of 7600 cfm to 9800 cfs, i
l 2)
Verifying that the system starts on a Safety Injection test j
- signal, j
3)
Verifying that each system produces a negative pressure of 1
greater than or equal to 0.4 inch Water Gauge in the Auxiliary Building at 24'6' elevation within 120 seconds after a start j
signal, and i
1 4)
Verifying that the heaters dissipate 50 15 kW when. tested in j
accordance with ANSI N510-1980.
i l
i
- ANSI N510-1980 shall be used in place of ANSI N510-1975 referenced in i
Regulatory Guide 1.52, Revision 2, March 1978.
MILLSTONE - L511T 3 3/46-20 Amendment No. J. JJ. 77, oso7 JPP,123 l
l
l*
PLANT SYSTEMS SURVEILLANCEREQUIREMENTS(Continued) i l
At least once each REFUELING INTERVAL or (1)l adsorber housings, l after any structural c.
maintenance on the HEPA filter or charcoa or (2) following painting, fire, or chemical rela.se in any ventilation zone communicating with the system by:
]
1)
Verifying that the system satisfies the in-place penetration and bypass leakage testing acceptance criteria of less than 0.05% and uses the test procedure guidance in i
Regulatory Position C.5.a. C.5.c, and C.5.d of Regulatory i
Guide 1.52, Revisions 2, March 1978,* and the system flow j
rate is 1,120 cfm 120%;
2)
Verifying, within 31 days after removal, that a laboratory analysis of a representative carbon sample obtained in accordance with Regulatory Position C.6.b of Regulatory Guide 1.52, Revision 2, March 1978,* meets the laboratory testing criteria of Regulatory Position C.6.a of i
Regulatory Guide 1.52, Revision 2, March 1978,*
for a
j methyl iodide penetration of less than 0.175%; and 3)
Verifying a system flow rate of 1,120 cfm 120% during i
system operation when tested in accordance with ANSI l
N510-1980.
l d.
After every 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of charcoal adsorber operation, by verifying, within 31 days after removal, that a laboratory j
analysis of a
representative carbon sample obtained in l
l accordance with Regulatory Position C.6.b of Regulatory Guide i
1.52, Revision 2, March 1978,* meets the laboratory testing l
criteria of Regulatory Position C.6.a of Regulatory Guide 1.52, Revision 2, March 1978,* for a methyl iodide penetration of
(
less than 0.175%;
i l
e.
At least once each REFUELING INTERVAL by:
l
]
1)
Verifying that the pressure drop across the combined HEPA j
filters and charcoal adsorber banks is less than 6.75 inches Water Gauge while operating the system at a flow
+
j rate of 1,120 cfm 120%;
2)
Verifying that the system maintains the control room at a positive pressure of greater than or equal to 1/8 inch Water Gauge at less than or equal to a pressurization flow l
of 230 cfm relative to adjacent areas during system operation; and l
3)
Verifying that the heaters dissipate 9.4 1 kW when tested in accordance with ANSI N510-1980.
4 i
MILLSTONE'- UNIT 3 3/4 7-16 Amendment No. J 123 0370 2
PLANT SYSTEMS I
tuovrrinauer ernuteruruft (can+4nn.A) c.
At least once each REFUELING INTERVAL or following a major l
alteration of the control room envelope pressure boundary by:
1.
Verifying that the control room envelope is isolated in response to a Control Building Isolation test signal, 2.
Verifying that after a 60 second time delay following a Control Building Isolation test signal, the control room envelope pressurizes to greater than or equal to 1/8 inch W.G. relative to the outside atmosphere, and i
3.
Verifying that the positive pressure of Specification 4.7.8.c.2 is maintained for greater than or equal to 60 minutes.
e l
1 i
i
(
MILLSTONE - UNIT 3 3/4 7-19 Amendment No.123 0371 1
i i
j PLANT SYSTEMS
}
3/4.7.9 ADXILIARY BUILDING FILTER SYSTEN l
LIMITING COMITION FOR OPERATION i
3.7.9' Two independent Auxiliary Building Filter Systems shall be OPERABLE l
with each system comprised of:
a.
one OPERABLE filter and fan, and l
i b.
one OPERATIONAL Charging Pump / Reactor Plant Component Cooling i
Water Pump Ventilation System.
i j
APPLICABILITY: N00ES 1, 2, 3, and 4.
l
&GI1Qli:
With one Auxiliary Building Filter System inoperable, restore the i
inoperable system to OPERABLE status within 7 days or be in at least HOT l
STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
In
- addition, comply with the ACTION requirements of j
Specification 3.6.6.1.
i j
SURVEILLANCE REQUIREMENTS 4.7.9 Each Auxiliary Building Filter System shall be demonstrated OPERABLE:
i i
a..
At least once per 31 days on a STAGGERED TEST BASIS by initiating, from the control
- room, flow through the HEPA l
filters and charcoal adsorbers and verifying a system flow rate of 30,000 cfm 110% and that the system operates for at least 10 continuous hours with the heaters operating; j
b.
At least once each REFUELING INTERVAL or (1) after any structural l
{-
maintenance on the HEPA filter or charcoal adsorber housings, i
or (2) following painting, fire, or chemical release in any ventilation zone communicating with the system by:
1 1)
Verifying that the cleanup system satisfies the in-place 4
penetration and bypass leakage testing acceptance criteria of less than 0.05% and uses the test procedure guidance in Regulatory Positions C.5.a C.5.c, and C.5.d of Regulatory i
Guide 1.52, Revision 2, March 1978,* and the system flow
[
rate is 30,000 cfm 110%;
2)
Verifying, within 31 days after removal, that a laboratory i
analysis of a representative carbon sample obtained in i
accordance with Regulatory Position C.6.b of Regulatory j
Guide 1.52, Revision 2, March 1978,* meets the laboratory 1
l 4
NILLSTONE - UNIT 3 3/4 7-20 Amendment No. g, 77,123
.n
PLANT SYSTEMS j
SURVEILLANCE REQUIREMENTS l
testing criteria of Regulatory Position C.6.a of
{
Regulatory Guide 1.52, Revision 2, March 1978,*
for a
j methyl iodide penetration of less than 0.175%; and t
l 3)
Verifying a system flow rate of 30,000 cfm 110% during i
system operation when tested in accordance with ANSI l
j N510-1980.
j c.
After every 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of charcoal adsorber operation, by j
verifying, within 31 days after removal, that a laboratory analysis of a representative carbon sample obtained in accordance with Regulatory Position C.6.b of Regulatory Guide
?
1.52 Revision 2, March 1978,* meets the laboratory testing criteria of Regulatory Position C.6.a of Regulatory Guide 1.52, 1
Revision 2,
March 1978*, for a methyl iodide penetration of j
less than 0.175%;
d.
At least once each REFUELING INTERVAL by:
l 1)
Verifying that the pressure drop across the combined HEPA l
filters and charcoal adsorber banks is less than 6.8 inches Water Gauge while operating the system at a flow l
rate of 30,000 cfm 110%,
i j
2)
Verifying that the system starts on a Safety Injection test signal, and 3)
Verifying that the heaters dissipate 180 118 kW when l
tested in accordance with ANSI N510-1980.
I e.
After each complete or partial replacement of a HEPA filter 1
bank, by verifying that the cleanup system satisfies the l
in-place penetration and bypass leakage testing acceptance i
criteria of less than 0.05% in accordance with ANSI N510-1980 i
for a DOP test aerosol while operating the system at a
j flow rate of 30,000 cfm 110%; and i
l f.
After each complete or partial replacement of a charcoal adsorber bank, by verifying that the cleanup system satisfies j
the in-place penetration and bypass leakage testing acceptance criteria of less than 0.05% in accordance with ANSI N510-1980
)
for a halogenated hydrocarbon refrigerant test gas while operating the system at a flow rate of 30,000 cfm 110%.
l l
l ANSI N510-180 shall be used in place of ANSI N510-1975 referenced in l
Regulatory Guide 1.52, Revision 2, March 1978.
NILLSTONE - LMIT 3 3/4 7-21 Amendment No. J, y,123 osn l
L
4.
r b'
i REFUELIM _DEEBAT10HS i
3/4.9.12 FUEL BUILDING EXHAUST FILTER SYSTEN I
LIMITING COM ITION FOR OPERATION i
3.9.12 Two independent Fuel Building Exhaust Filter Systems shall be j
OPERABLE. At least one Fuel Building Exhaust Filter System shall be in i
operation whenever any evolution involving movement of fuel within the storage
{
pool or crane operations with loads over the storage pool is in progress.
i i
APPLICABILITY: Whenever irradiated fuel with less than 60 days deca,y is in
{
the storage pool.
AGIlQH:
1 a.
With one Fuel Building Exhaust Filter System inoperable, fuel movement within the storage pool or crane operation with loads over the storage pool may proceed provided the OPERABLE Fuel Building i
Exhaust Filter System is capable of being powered from an OPERABLE l
emergency power source and is in operation and discharging through at least one train of HEPA filters and charcoal adsorbers.
j b.
With no Fuel Building Exhaust Filter System OPERABLE, suspend all operations involving movement of fuel within the storage pool or crane operation with loads over the storage pool until at least one Fuel Building Exhaust Filter System is restored to OPERABLE status.
I-c.
The provisions of Specifications 3.0.3 are not applicable.
SURVEILLANCE REQUIRENENTS 4.9.12 The above required Fuel Building Exhaust Filter Systems shall be demonstrated OPERABLE:
i l
a.
Within 31 days prior to moving fuel within or loads over the storage pool when irradiated fuel with less than 60 days decay is present by initiating, from the control room, flow through the HEPA filters and charcoal adsorbers, and verifying a system flow rate of 20,700 cfm 10% and that the system operates for at least 10 continuous hours with the heaters operating; l
I b.
At least once each REFUELING INTERVAL or (1) after any structural l
maintenance on the HEPA filter or charcoal adsorber housings, or (2) following painting, fire, or chemical release in any ventilation j
zone communicating with the system by:
l l
MILLSTONE - WIT 3 3/49-13 Amendment No. J. J7, JP),123 4
0373
i
)
REFUELING OPERATIONS SURVEILLANCE REQUIREMENTS (Continued) 1)
Verifying that the cleanup system satisfies the in-place penetration and bypass leakage testing acceptance criteria of less than 0.05% and uses the test procedure guidance in Regulatory Positions C.5.a, C.S.c, and C.5.d of Regulatory, Guide 1.52, Revision 2 March 1978,* and the system flow rate is 20,700 cfm 110%;
2)
Verifying, within 31 days after removal, that a laboratory analysis of a representative carbon sample obtained in accordance with Regulatory Position C.6.b of Regulatory Guide 1.52, Revision 2, March 1978,* meets the laboratory testing criteria of Regulatory Position C.6.a of Regulatory Guide 1.52, Revision 2, March 1978,* for a methyl iodide penetration of less than 0.175%; and 3)
Verifying a system flow rate of 20,700 cfm 110% during system operation when tested in accordance with ANSI N510-1980.
c.
After every 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of charcoal adsorber operation by verifying, within 31 days after removal, that a laboratory analysis of a representative carbon sample obtained in accordance with Regulatory Position C.6.b of Regulatory Guide 1.52, Revision 2, March 1978,*
meets the laboratory testing criteria of Regulatory Position C.6.a of Regulatory Guide 1.52, Revision 2, March 1978,* for a methyl iodide penetration of less than 0.175%;
{
d.
At least once each REFUELING INTERVAL by:
l l
1)
Verifying that the pressure drop across the combined HEPA filters and charcoal adsorber banks is less than 6.8 inches i
Water Gauge while operating the system at a flow rate of 20,700 cfm 110%.
l i
l i
4 NILLSTONE - LSIIT 3 3/4 9-14 Amendment No. 7,123 0373 i
l
l' l'
)
REFUELING 0PERATIONS l
SURVEILLANCE REQUIREMENTS (Continued) t i
2)
Verifying that the system maintains the spent fuel storage pool l
area at a negative pressure of greater than or equal to 1/4 i
inch Water Gauge relative to the outside atmosphere during system j
operation, and 1
j 3)
Verifying that the heaters dissipate 150 115 kW when tested in i
accordance with ANSI N510-1980.
1 i
s.
After each complete or partial replacement of a HEPA filter bank, by 1
verifying that the cleanup system satisfies the in-place penetration and bypass leakage testing acceptance criteria of less than 0.05% in accordance with ANSI N510-1980 for a DOP test aerosol while operating l
the system at a flow rate of 20,700 cfm 110%; and
)
i f.
After each complete or partial replacement of a charcoal adsorber j
bank, by verifying that the cleanup system satisfies the in-place i
penetration and bypass leakage testing acceptance criteria of less than 0.05% in accordance with ANSI N510-1980 for a halogenated hydrocarbon refrigerant test gas while operating the system at a l
flow rate of 20,700 cfm 110%.
i 4.9.12.2 The Fuel Building Exhaust Filter System shall be verified to be i
operating within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> prior to the initiation of and at least once per j
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> during either fuel movement within the fuel storage pool or crane i
operations with loads over the fuel storage pool whenever irradiated fuel with l
less than 60 days decay is in the storage pool.
i i
l i
4 I
l e
- ANSI N510-1980 shall be used in place of ANSI N510-1975 referenced in Regulatory Guide 1.52, Revision 2, March 1978.
j 1
1 i
N!LLSTONE - IMIT 3 3/49-15 Amendment No.123 om
ColffAllelENT SYSTEMS BASES 3/4.6.6.1 SUPPLEMENTARY LEAK COLLECTION AND RELEASE SYSTEM (Continued)
Surveillance Ranuirements A
Cumulative operation of the SLCRS with heaters operating for at least 10 continuous hours in a 31-day period is sufficient to reduce the buildup of moisture on the adsorbers and HEPA filters. The 31-day frequency was developed in consideration of the known reliability of fan motors and con-trols. This test is perfoimed on a STAGGERED TEST BASIS once per 31-days.
- b. c. e. and f These surveillances verify that the required SLCRS filter testing is performed in accordance with Regulatory Guide 1.52, Revision 2.
ANSI N510-1980 shall be used in place of ANSI N510-1975 referenced in Regulatory Guide 1.52, Revision 2.
The surveillances include testing HEPA filter performance, charcoal adsorber efficiency, system flow rate, and the physical properties of the activated charcoal (general. use and following specific operations).
d The automatic startup ensures that each SLCRS train responds properly.
l The REFUELING INTERVAL frequency is based on the need to perform this l
surveillance under the conditions that apsly during a plant outage' and the potential for an unplanned transient if tte surveillance was performed with l
the reactor at power. The surveillance verifies that the SLCRS starts on a SIS test signal.
It also includes the automatic functions to isolate the other ventilation systems that are not part of the safety-related postaccident l
operating configuration and to start up and to align the ventilation systems l
that flow through the secondary contziament to the accident condition.
The main steam valve building ventilation system isolates.
l l
Auxiliary building ventilation (normal) system isolates.
Charging pump / reactor plant component cooling water pump area cooling j
subsystem aligns and discharges to the auxiliary building filters and a filter fan starts.
Hydrogen recombiner ventilation system aligns to the postaccident j
configuration.
l The engineered safety features building ventilation system aligns to the l
postaccident configuration.
P l
NILLSTONE - LNIIT 3 B3/46-6 Amendment No. R.123 se74 i