Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20096C635 + (13:05:30, 13 December 2024)
- RBG-18-722, Interim Deficiency Rept DR-167 Re HPCS Diesel Generator Control Panel.Interim or Final Status Rept Will Be Provided by 841016 + (13:05:31, 13 December 2024)
- ULNRC-03310, Informs NRC of Implementation of Amend 104 to License NPF-30,approving Relocation of TS Table 3.3-2 & 3.3-5 to Chapter 16 of FSAR + (13:05:32, 13 December 2024)
- ML20096C616 + (13:05:32, 13 December 2024)
- ML20096C609 + (13:05:33, 13 December 2024)
- ML20096C606 + (13:05:34, 13 December 2024)
- ML20096C604 + (13:05:34, 13 December 2024)
- ST-HL-AE-4097, Responds to Violations Noted in Insp Repts 50-498/92-06 & 50-499/92-06 on 920224-28.Corrective Actions:Purchase Orders Issued to Obtain Both Kalsi & Westinghouse MOV Actuator Uprating Program Test Results + (13:05:35, 13 December 2024)
- ML20096C592 + (13:05:39, 13 December 2024)
- ML20096C590 + (13:05:40, 13 December 2024)
- ML20096C589 + (13:05:41, 13 December 2024)
- ML20096C582 + (13:05:41, 13 December 2024)
- ML20096C576 + (13:05:42, 13 December 2024)
- ML20096C565 + (13:05:43, 13 December 2024)
- ML20096C568 + (13:05:43, 13 December 2024)
- ML20096C563 + (13:05:44, 13 December 2024)
- ML20096C553 + (13:05:45, 13 December 2024)
- ML20096C562 + (13:05:45, 13 December 2024)
- ML20096C547 + (13:05:46, 13 December 2024)
- 05000370/LER-1995-004-04, :on 951216,manually Initiated Actuation of Both Unit 2 Motor Driven Auxiliary Feedwater Pumps. Caused by Loss of Auxiliary Steam to Main Feedwater Pump Turbine. Procedures Revised + (13:05:48, 13 December 2024)
- DCL-84-297, Forwards Replacement Page to Rev 11 to Security Plan.Page Withheld (Ref 10CFR73.21) + (13:05:49, 13 December 2024)
- ML20096C540 + (13:05:49, 13 December 2024)
- ML20096C535 + (13:05:50, 13 December 2024)
- GO2-84-476, Responds to NRC Re Observations Noted in Insp Rept 50-397/84-15.Corrective Actions:Nonessential Activity in Control Room Limited,Personnel Counseled Re Adherence to Procedures & log-keeping Procedure Revised + (13:05:51, 13 December 2024)
- ML20096C534 + (13:05:51, 13 December 2024)
- ML20096C532 + (13:05:52, 13 December 2024)
- ML20096C521 + (13:05:53, 13 December 2024)
- ML20096C528 + (13:05:53, 13 December 2024)
- ML20096C515 + (13:05:54, 13 December 2024)
- 05000456/LER-1995-012-02, :on 951005,method of Makeup to VCT Could Not Be Supported Through Existing Documentation.Caused by Mgt Deficiency.Addl Makeups to VCT Via Boric Acid Storage Tank Provided + (13:05:56, 13 December 2024)
- ML20096C471 + (13:05:57, 13 December 2024)
- DCL-84-291, Revised Emergency Plan Implementing Procedures,Including EP R-2, Release of Airborne Radioactive Matls, EP EF-6, Operating Procedures for Ears 9845C Controlling Stations & EP RB-15, Initial Sampling Exercise... + (13:05:58, 13 December 2024)
- ML20096C462 + (13:05:59, 13 December 2024)
- ML20096C459 + (13:05:59, 13 December 2024)
- ML20096C458 + (13:06:00, 13 December 2024)
- 05000333/LER-1992-018, :on 920407,discovered Potential Failure of Containment Isolation Valves in RHR Pump min-flow Lines to Close.Caused by Design Error.Internal Parts of Valves Will Be Replaced Prior to Startup + (13:06:02, 13 December 2024)
- ML20096C443 + (13:06:03, 13 December 2024)
- ML20096C440 + (13:06:04, 13 December 2024)
- ML20096C436 + (13:06:04, 13 December 2024)
- 2CAN088414, Responds to 840727 Request for Addl Info Re IAEA Safeguards Implementation.Review of Draft Implementation Plans Expected to Be Complete by 840930.Encl Withheld + (13:06:05, 13 December 2024)
- ML20096C434 + (13:06:05, 13 December 2024)
- ML20096C424 + (13:06:06, 13 December 2024)
- ML20096C421 + (13:06:07, 13 December 2024)
- ML20096C420 + (13:06:07, 13 December 2024)
- ML20096C419 + (13:06:08, 13 December 2024)
- ML20096C414 + (13:06:09, 13 December 2024)
- ML20096C410 + (13:06:10, 13 December 2024)
- GO2-84-047, Responds to NRC Noting Unacceptability of Corrective Action Proposed for Violation a in Insp Rept 50-397/84-09.Containment Entry Will Be Made W/One Air Lock Door Closed at All Times + (13:06:11, 13 December 2024)
- RBG-18703, Interim Deficiency Rept DR-192 Re HVAC Duct Pieces Fabricated by Mccroskey Sheet Metal.Interim or Final Status Rept Will Be Provided by 840914 + (13:06:11, 13 December 2024)
- ML20096C403 + (13:06:12, 13 December 2024)
- ML20096C401 + (13:06:13, 13 December 2024)