com,,.ud rth 18 S t
9, ;: #,
' Post Office Box 2641
~ Birmingham, Alabama 35291 -
,11:
- Telephone 205 783-6090 s
R. P. Mcdonald M s' C 'fo'"'
AlabamaPbwer me sxwn eer< sen August 31, 1984 Docket Nos.-50-348L 50-364
' Director,' Nuclear Reactor Regulation U.' S. Nuclear Regulatory Connission -
Washington, D. C. 20555 Attention:, Mr. S. A. Varga Joseph M. Farley Nuclear Plant - Units 1 and 2 NUREG-0737, Item II.B.3, Post-Accident Sampling Capability Gentlemen:
NUREG-0737, Item II.B.3, Post-Accident Sampling Capability, provides that the Farley Nuclear Plant be capable of performing chloride analysis of
.- post-accident samples within four days after the decision to take a post-
~
- accident sample. This analysis is not required to be performed onsite.
In Alabama Power Company's February 9,1981 letter to the NRC, it was stated that arrangements'had been made to perform this analysis offsite within the
_four day time-constraint.
By letter dated April 1,1983 Alabama Power Company reiterated the four day time-constraint for chloride analysis and stated that ion specific electrodes would be utilized in'such analysis. This position was confirmed
-by the December 15, 1983 NRC Safety Evaluation regarding NUREG-0737 Item -
-II.B.3,: Post-Accident Sampling Capability.
It has been subsequently determined that use of ion specific electrodes for chloride analysis may not be appropriate for tall. levels of possible iodine concentration.
In the event that the iodine concentration of the post-accident sample precludes the use of an ion specific electrode for chlorine analysis, an ion chromatograph will be utilized for chloride measurement within the four day time-constraint. This instrument is capable of measuring the expected levels of chloride concentration in the anticipated post-accident iodine environment.'
EhhoENs ll0 F
ij Hr. S. A. Varga August 31, 1984 U. S. Nuclear Regulatory Connission Page 2 Alabama Power Company hereby clarifies its April 1,1983 response in that chloride analysis may be performed either onsite, by use of either an ion chromatograph or other suitable instrtment, or offsite if required.
In
- any event, chloride analysis will be perfonned within four days as required by NUREG-0737,. Item II.B.3.
If there are any questions, please advise.
Yours very tr R. P. Mcdonald RPM / JAR:grs-D7 cc: Mr. L. B. Long Mr. J. P. O' Reilly Mr. E. A. Reeves Mr. W. H. Bradford 4
4 m
2