Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PY-CEI-NRR-1511, Submits Rept of Unsatisfactory Licensee Blind Performance Test Procedure Result,In Accordance w/10CFR26,app A,2.8 + (12:22:04, 13 December 2024)
- ML20097H138 + (12:22:06, 13 December 2024)
- ML20097H144 + (12:22:06, 13 December 2024)
- ML20097H136 + (12:22:07, 13 December 2024)
- ML20097H126 + (12:22:11, 13 December 2024)
- 05000416/LER-1992-008, :on 920519,several Ci Valves Closed When Power Was Lost to Sys Relays Due to Blown Fuse.Caused by Design of Associated Panel & Relay Base.Personnel Advised to Exercise Caution When Performing Task + (12:22:12, 13 December 2024)
- ML20097H118 + (12:22:20, 13 December 2024)
- 05000277/LER-1992-009-01, :on 920520,reactor Scram Occurred When Two Turbine CIV Closed Simultaneously Causing Power Trip Signal. Cause Determined to Be Unexpected Closure of Intercept Valve 2.Sys Reset & Returned to Normal + (12:22:21, 13 December 2024)
- 05000362/LER-1992-003-01, :on 920515,reactor Coolant Pump Tripped.Caused by Phase C Differential Relay Operation on RCP Supply Breaker.Rcp Motor Preventive Maint Program Modified to Include Periodic Replacement of Capacitors + (12:22:23, 13 December 2024)
- ML20097H102 + (12:22:25, 13 December 2024)
- 05000255/LER-1984-016, :on 840810,excessive Primary Coolant Sys (PCS) Leak Identified.Caused by Cracked Socket Weld on PCS Loop Differential Pressure Sensing Line.Support Added to Piping to Inhibit Dynamic Forces + (12:22:27, 13 December 2024)
- ML20097H094 + (12:22:30, 13 December 2024)
- ML20097H043 + (12:22:31, 13 December 2024)
- ML20097H042 + (12:22:33, 13 December 2024)
- ML20097H013 + (12:22:37, 13 December 2024)
- 05000254/LER-1984-013-04, :on 840808,new Vessel Level Instrument Line Improperly Backflushed,Resulting in Reactor Scram & ECCS Initiation from False Signal.Caused by Personnel Error.Level Instrumentation Lines Flushed & Backfilled + (12:22:38, 13 December 2024)
- ML20097G994 + (12:22:41, 13 December 2024)
- ML20097G983 + (12:22:43, 13 December 2024)
- ML20097G980 + (12:22:44, 13 December 2024)
- ML20097G971 + (12:22:45, 13 December 2024)
- ML20097G967 + (12:22:46, 13 December 2024)
- ML20097G936 + (12:22:47, 13 December 2024)
- ML20097G899 + (12:22:47, 13 December 2024)
- ML20097G888 + (12:22:48, 13 December 2024)
- FVY-84-110, Forwards Response to NRC Request Re Actions Taken in Response to GE Significant Info Ltr 420 Concerning Hatch-2 Vent Header Crack + (12:22:49, 13 December 2024)
- ML20097G868 + (12:22:50, 13 December 2024)
- ML20097G863 + (12:22:51, 13 December 2024)
- 3F0692-03, Monthly Operating Rept for May 1992 for Crystal River Unit 3 + (12:22:52, 13 December 2024)
- ML20097G832 + (12:22:53, 13 December 2024)
- ML20097G831 + (12:22:54, 13 December 2024)
- ML20097G827 + (12:22:55, 13 December 2024)
- ML20097G824 + (12:22:56, 13 December 2024)
- ML20097G822 + (12:22:57, 13 December 2024)
- ML20097G815 + (12:22:58, 13 December 2024)
- ML20097G809 + (12:22:59, 13 December 2024)
- ML20097G803 + (12:23:00, 13 December 2024)
- ML20097G738 + (12:23:01, 13 December 2024)
- ML20097G733 + (12:23:02, 13 December 2024)
- ML20097G725 + (12:23:03, 13 December 2024)
- 0CAN042002, Units 1 and 2, Annual Occupational Radiation Exposure Report + (12:23:04, 13 December 2024)
- ML20097G707 + (12:23:05, 13 December 2024)
- ML20097G716 + (12:23:05, 13 December 2024)
- ML20097G705 + (12:23:06, 13 December 2024)
- ML20097G704 + (12:23:06, 13 December 2024)
- ML20097G694 + (12:23:07, 13 December 2024)
- ML20097G691 + (12:23:08, 13 December 2024)
- ML20097G688 + (12:23:09, 13 December 2024)
- ML20097G684 + (12:23:10, 13 December 2024)
- ML20097G682 + (12:23:11, 13 December 2024)
- ML20097G679 + (12:23:11, 13 December 2024)
- 3F0692-10, Special Rept 92-02:on 920514,waste Gas Decay Tank Hydrogen & Oxygen Monitoring Channels Removed from Svc & Not Returned to Operable Status within 14 Days.Caused by Need to Facilitate Maint.Ts Amend Will Be in Place by Sept 1992 + (12:23:12, 13 December 2024)