ML20097G832

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for May 1992 for Brunswick Steam Electric Plant Units 1 & 2
ML20097G832
Person / Time
Site: Brunswick  
Issue date: 05/31/1992
From: Rumple R, Spencer J
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9206170330
Download: ML20097G832 (8)


Text

F CP&L cnot na Phwbr h tight company Brunswick Nuclear Project P. O. Box 10429 Southport, NC 28461_0429 J$ $ 1 W' 4

FILE:

B09-135100 U.S. Nuclear Regulatory Commission Washington, DC 20555 Attn: Document Control Desk BRUNSWICK STFAM ELECTRIC PIANT UNITS 1 AND 2 DOCKET NOS, 50 325 AND 50 324 LICENSE NOS. DPR 71 AND DPR.62 MONTitLY OPERATING REPORT Centlemen:

In accordance with Technical Specification 6.9.1.11 for the Brunswick Stearn '

Electric Plant, Units 1 and 2, Carolina Power & Light Cornpany herewith submits the report of operating statistics and shutdown experience for the month of May 1992.

Very truly your,

kw

.. Spencer, e eral Manager uswick Nuclear Project RDR/mcg l

90 0041.MSC Enclosures cc:

Ms. D. M. Aslett Mr. T. C. Bell Mr. R. M. Coats l

Mr. S. D. Ebneter Mr.

M.-D. Hill Mr. N. P. Le Mr. W. R. Murray

/ O((450y3hf f

Mr. R. C. Oehl Ms. R. M. Parsons L

Mr. R. L. Prevatte Mr. R. B. Richey Mr. F. Yost INPO 49-f t)'

l l'T 01'7 U l

9206170330 920531 PDR ADOCK OS000324 1

l N

PDR

CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE 1

RUN DATE 06/04/92 APPENDIX B - AVERAGE DAILY POWER LEVEL' RPD39-000 RUN TIME 09:13:12 BRUNSWICK UNIT 1 DOCKET NO. 050-0325 COMPLETED BY RONALD RUMPLE TELEPHONE (919)457-2752 MAY 1992 DAY AVG. DAILY POWER LEVEL EAY AVG. DAILY POWP.R LEVEL (MWE-NET)

(MWE-NET) 12 17 8

1 8

10 18 2

10 19

-10 3

10 20

-10 4

5

-9 21

- -10 6

-9 22

-11 10 23-

-10 7

4 10 24

-10 8

10 25

-10 9

l 11 26

-10 i

10 11

-8 27

-10 12

~6 28

-10 i

13

-6 29

-10 14

-6 30

-10 l

15

-7 31

-11:

16

-8 l

1.16 - 8 D

  • I w

a-ws-sww<~

e r, ers,wmv m

g > w - wo-r, er v.ww a-

-r n w

e:-->--w-w1r--

n e vn y-,vnns v.o r

1r w-,

r_,<

-,w s

r.,-mns,,-6

-mn>g

~ _ _ _ _ _. _ _. _

CPfrL CO PLANT PERFORMANCE DATA SYSTEM PAGE 1

RUN DATE 06/04/92 OPERATING DATA REPORT RPD36-000 RUN TIME 09:13:14 BRUNSWICK UNIT 1 DOCKET NO. 050-s325 COMPLETED BY RONALD RUMPLE OPERATING STATUS TELEPHONE (919)457-2752

1. UNIT NAME: BRUNSWICK UNIT 1 NOTES-There are 560 f uel bundles
2. REPORTING PERIODt MAY 92 in the Reactor Core, 1090 BWR and 3.

LICENSED TiiERMAL POWER (MWT): 2436 160 PWR spent fuel burJ1es in the

4. HAMEPLATE RATING (GROSS MWE): 867.0 ruel Pool, and 108 fuel bundles in l

S.

DESIGN ELECTRICAL RATING (NET MWE): 821.0 the now fuel storago vault *

6. MAX DEPENDABLE CAPACITY (GROSS MWE)* 791.0
7. MAX DEPENDAPLE CAPACITY (NET MWE): 767.0 8.

IF CilANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 TilRU 7) SINCE LAST REPORT, GIVE REASONS j

9. POWER LEVEL TO Wi!ICil RESTRICTED IF ANY (NET MWE):
10. REASONS FO! RESTRICTION IF ANY:

THIS YR TO CUMUL l

MONTH DATE ATIVE l

11. IlOURS IN REPORTING PERIOD 744.00 3647.00 133295.00
12. NUMBER OF HOURS REACTOR CRITICAL

.00 2517.88 87881.32 t

13. REACTOR RESERVE SHUTDOWN HRS

.00

.00 1647.10

14. HOURS GENERATOR ON LINE

.00 2487.31 84201.37

15. UNIT RESERVE SHUTDOWN HOURS

.00

.00

.00

16. GROSS Ti!ERMAL ENERGY GEN. (MWH)

. 00 5896708.27 183021943.70

17. GROSS ELEC. ENERGY GEN. (MWH)

.00 1935805.00 60019285.00

18. NET ELEC. ENERGY GENERATED (MWH)

-6950.00 1867598.00 57760928.00

19. UNIT SERVICE FAOTOR

.00~

68.20

.63.17

20. UNIT AVAILABILITY FACTOR...

.00-68.20 63.17

31. UNIT CAP. FACTOR (USING MDC NET)

-1.22 66.77 55.00-

22. UNIT CAP. FACTOR (USING DER NET)

-1.14 62.37 52.78

23. UNIT FORCED OUTAGE RATE 100.00 31.04 16.07
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACil):
35. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 9/1/92
26. UNITS-IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1

1.16 - 9 y

j l

u l

wr w=

g-W,+w.i erp-"g g

e 3m.p-,

4 4-9

-i--m.

t4"

.M V

mt p

  1. T m

y a

p-

4 4

DOCKET wo.

050-0325 UNIT NAME E v s=tek 1 OATF

. A-e 1992 COMPLETED BY W ald Rurcie TELEPHONE 919-a57-2752 UNIT SHWWS AMD POWER REDUCTIONS REPORT 7 TH May 1992 1

METHOD Cf ICENSEE SYSTEM COMPONENT CAUSE 4 CORRECTIVE ACTION TO l

DURATION SHUTTING 00W4 ETENT C00E (4)

CODE (5)

FREVENT RECUR *ENCE l TYPE (1)

M0.

I DATE (HOURS)

REASON (2)

REACTOR (3)

REPORT NO.

e 92-023 920421,

F 704.0 A

4 1-92-12 NB N/A Diesel Generator building wall 90-1 Continued was declared incoerable. As a fran previous result tarsses E-5 and E-6 were month declared troperable. Because of

.g' Tech. Spec. 3.0.3. the 'Jnit was taken to cold shutdown. The Diesel Generator tmtiding malls are being inspected and repaired. In ackittion. all other walls on site that may have an lepact on safety equipment are being inspected and repaired if needed. At the same 0-time, the items in the scheduled PT l

outage (scheduled to start May 30th) are being accomplished at this time.

For further details on the corrective action refer to LER i

1-92-12. Th!s event is being closed

{

out on May 30th at 0800 hrs and the planned PT outege is being opened at t

the same time.-(See event 92-024).

1:

T22e 2:

Reason 3:

Method 4:

Syste Code:

5:

C e t Code F - Forced A-Equipment failure 1-Manual Instructions for Instructions for 5 - kheduled (explain) 2-Manual Scram preparation of data entry preparation of data B-Maintenance er test 3-Automatic scram sheets for Licensee Event entry sheets for LER C-Refueling 4-Continuations Report (LER) file from ftie froe IEEE Standa-d D-Regulatory 5-Load reductions IEEE Standard 805-1983, 803A-1983 per restriction 6-Other per NUREG-10ZZ.

NUREG-1022.Section VI.

E-Operator Training &

Section VI. Item 13.b Item 13.c License Examination F-Adninistrative

+

G-Operational errer (explain)

H-Other (explatn)

DOCKET NO.

050-0325 UNIT NAME Barswick 1 DATE Jre192 COMPLETED Bf W ald M ie TELEPHCNE 919-a57-2752 UNIT SHUTDOWNS AND P0iER REDUCTIONS wy 1992 REPORT MONTH a

METHOD OF LICENSEE SYSTEM COMPONENT CAUSE & CCRRECTIVE ACTION TO DURATION SHUTTING DOWN EVENT CODE (4)

CCDE (5)

PREVENT RECURRENCE NO.

DATE TYPE'(1)

(HOURS)

REASON (2)

REACTOR (3)

REPORT NO.92-024 920530 5

40.0 8

4 1-92-12 N/A N/A To complete the scheduled Feriodic Continued Testing outage. Also, repairs to frers previous the Diesel Generater building walls month continue.

1:

har 2:

Peasen 3:

Met M 4:

System Code:

5:

Cs e t Code F - Forced A-Equipment fatture 1-Manual Instructions for Instructices for 5 - Scheduled

-(explain) 2-Manual Scram preparet'on of date entry preparation cf data B-Maintenance or test 3-Automatfc scram sheets for Licensee Event entry sheets for LER C-Refueling 4-Continuations Report (LER) flie from flie from IEEE Standard D-

. Regulatory 5-Lead reductions IEEE Standard 805-1A3 803A-1983. per restriction 6-Other per NUREG-1022 NUREG-1022.Section VI.

E-Operator Training &

Section VI. Item 13.b Itse 13.c License Examination F-Administrative 6-Operational error (explain)

H-Other (explain)

j 1'

CP6L CO PLANT PERFORMA!1CE DATA SYSTEM PAGE 2

i RUN DATE 06/04/93 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 09:13:12 BRUNSWICK UNIT 2 l

)

DOCKET No. 050-0324 i

COMPLETED BY RONALD RUMPLE

]

TELEPIIONE (919)457-2752 i

j MAY 1992 1i DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL i

(MWE-NET)

(MWE-NET) 1 1

-9 17

-11 2

-11 18

-11 j

3

-11 19

-12 4

-11 20

-11 f

3 5

-12 21

-11 6

-12 22

-11 7

1 3

7

-12

-23

-12 i

l 8

-11 24 i i

9

-11 25

-12 i

10

-11 26

-11 l

L j

11

-11 27

-11 i'

12

-12 28

-11 f

l 13

-12 29

-10' l-14

-11 30

-11 i

i 15

-12 31

-10 l

16

-11 i

J 4

4-h I

'1.16 - 8 3

3 k

.- l

+

i',_,__

,.... _.,.,,...,.., ~,,. -.. - - - -,.

,.m.

'. CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE 2 i RUN DATE 06/04/92 OPERATING DATA REPORT RPD36-000 ;

RUN TIME 09:13:14 BRUNSWICK UNIT 2 DOCKET NO. 050-0324 i

COMPLETED BY RONALD RUMPLE OPERATING STATUS TELEPl!ONE (919)457-2752

1. UNIT NAME: BRUNSWICK UNIT 2 NOTES-There are 560 f uel bundles
2. REPORTING PERIOD: MAY 92 in the Reactor Core, 1113 DWR and
3. LICENSED THERMAL POWER (MWT): 2436 144 Pwa spent fuel bundles in the
4. NAMEPLATE RATING (GROSS MWE) : 867.0 fuel pool, and 0 fuel bundlee in 5.

DESIGN ELECTRICAL RATING (HET MWE) : 821.0 the new fuel storage vault.

6. MAX DEPENDABLE CAPACITY (GROSS MWE): 782.0
7. MAX DEPENDABLE CAPACITY (NET MWE): 754.0

~~-------------

8.

IF CllANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE) :

10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MOhTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 744.00 3647.00 145319.00
12. NUMBER OF HOURS REACTOR CRITICAL

.00 2378.33 92091.38

13. REACTOR RESERVE SHUTDOWN HRS

.00

.00

.00

14. HOURS GENERATOR.ON LINE

.00 2201.18 87154.67

15. UNIT RESERVE SHUTDOWN HOURS

.00

.00

.00 t

16. GROSS THERMAL ENERGY GEN. (MWH)

.00 4396154.21-184126854.86-

17. GROSS ELEC. ENERGY GF'I. (MWH)

.00 1366375.00 59550469.00

18. NET ELEC. ENERGY GENERATED (MWH)

-8290.00 1306814.00 57097286.00

19. UNIT SERVICE FACTOR

.00 60.36 59.97

20. UNIT AVAILABILITY FACTOR

.00 60.36- -

59.97

21. UNIT CAP. FACTOR (USING MDC NET)

-1.48 47.52 49,93

22. UNIT CAP. FACTOR (USING DER NET)

-1.36 43.65 47.86 l

23. UNIT FORCED OUTAGE RATE

.00 18.45 13.51'

24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 7/15/92
26. UNITS IN TEST STATUS-(PRIOR TO-COMMERCIAL OPERATION): FORECAST-ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l

l-l 1.16 - 9 l

. ~..

e 4,

~.

h^4 G

D M

- N, S

- A, 5

s p.

g g

' g2 3,

d<;>

k.

r.

~c

. y

~

00CKE 20.

_,950-0324 UN t f,3,(

betr7%wjck 2 DA

.J w. 1992 l

L' TID BY _f.gald D =cQ.

- 10E Si?-457-2752 UNIT SHUTDIAS AND POWER RED'D REPORT MONTH Mwy METHOD OF LICENSEE SY3TF.M CUMPONINT CA'JSE & CORRECTIVE ACTION TO DURATION SMITTING 00WI EVENT CODE (4)

CODE (S)

PREVERT RECURREEE NO.

DATE ivPE (1)

(HOURS)

REASON (2)_ REACTOR (3' REPORT NO.92-025 920430 S

74/. '*

8 4

1-92-12 TG XC To carlett the scheduled Continued Maintenave outage to repair the EHC

.l from previot.s System. Main Turbine. Ceactor month Feedpt.ep and the 4A Feedvater Heater. The Diesel Generator butiding walls are being inspectad and repaired. In addition, all other walls on site that may have an l

trpact on safety equipment are balng inspected and repaired if needed

[

l v

1:

Type 2:

Reappn 3:

Method 4:

System Code:

5:

Corro e t Code l

l F - Forced A-Equipment fat'are 1-Manual Instructions fc.c Instructions for I

$ - Scheduled (explain) 2-Manual Scram preparation of data entry preparation of data S-Maintenance or test 3-Automatic scram sheets for Licensee Event entry sheets for LER C-Refueling 4-Continuations Report (LER) flie frors file from IEEE 5tedard D-Regulatory 5-Lead reductions IEEE S'andard 805-1983, 803A-1983, p?r l

restriction 6-Other per NUREG-1022.

K'JRES-1022.Section VI.

E-Operator Training &

Section VI. Item 13 b Item 13.e j

License Examination F*

Administrative G-

'Operat onal error (explain)

H-Other (explain) l i

^'

+

,