Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20098B256 + (12:13:10, 13 December 2024)
- ML20098B238 + (12:13:11, 13 December 2024)
- NRC-95-4570, Provides Discussion on Bases for Mass Transfer Correlation Biases Used for AP600 Containment Design Basis Analyses + (12:13:12, 13 December 2024)
- TAC:54531 + (12:13:12, 13 December 2024)
- ML20098B200 + (12:13:14, 13 December 2024)
- NRC-95-4564, Forwards Evaluation Re Probability of Pipe Break in MFW Line within Turbine Bldg & Load Combinations for leak-before- Break in AP600 Plant + (12:13:14, 13 December 2024)
- 05000498/LER-1995-009, :on 950829,reactor Tripped Due to Loss of Reactor Coolant Flow.Caused by Inadequate Supervisory Practices.Discussion Conducted W/Supervisors on Importance of Proper Supervisory Involvement + (12:13:16, 13 December 2024)
- ML20098B186 + (12:13:17, 13 December 2024)
- ML20098B184 + (12:13:18, 13 December 2024)
- ML20098B183 + (12:13:19, 13 December 2024)
- ML20098B180 + (12:13:19, 13 December 2024)
- ML20098B177 + (12:13:20, 13 December 2024)
- ML20098B174 + (12:13:21, 13 December 2024)
- PY-CEI-NRR-1987, Informs That Centerior Electric Co Should Be Substituted Wherever Nomenclature Newco Appears in 940602 Proposed Amend Submittal Re Proposed Merger of Toed & Clei + (12:13:21, 13 December 2024)
- ML20098B164 + (12:13:22, 13 December 2024)
- ML20098B162 + (12:13:23, 13 December 2024)
- ML20098B163 + (12:13:23, 13 December 2024)
- ML20098B159 + (12:13:24, 13 December 2024)
- BSEP-95-0504, Responds to NRC Re Violations Noted in Insp Rept 50-325/95-10 on 950525.Corrective Actions:Will Develop Refuel Floor Project Implementation Plan + (12:13:25, 13 December 2024)
- ML20098B154 + (12:13:25, 13 December 2024)
- 2CAN099505, Forwards Response to NRC Questions Re Util 950404 TS Change Request to Allow Latching & Unlatching of CEAs W/Less than 23 Ft of Water Over Top of Irradiated Fuel Assemblies + (12:13:26, 13 December 2024)
- HL-5034, Forwards Response to NRC Re Violations Noted in Insp Rept 50-321/95-16.Corrective Actions:Valve Stem Was Replaced,Repaired Bonnet & Valve Guides & Valve Was Packed Correctly + (12:13:27, 13 December 2024)
- ML20098B151 + (12:13:27, 13 December 2024)
- ML20098B150 + (12:13:28, 13 December 2024)
- ML20098B148 + (12:13:29, 13 December 2024)
- ML20098B146 + (12:13:32, 13 December 2024)
- ML20098B143 + (12:13:33, 13 December 2024)
- 05000331/LER-1995-009, :on 950829,PCIS Groups 2 Through 5 Isolations Occurred Due to EPA Breaker Trip on Undervoltage. Placed Bus on Alternate Power Supply + (12:13:35, 13 December 2024)
- B15369, Revises Completion Date of Commitment Made in 950330 Response to NOV Re Mod Associated W/Engineering Work Request (EWR) 3-93-109.Mod Should Be Implemented by 960331 + (12:13:36, 13 December 2024)
- 05000302/LER-1995-016, :on 950831,revised Calculations Lead to non- Conservative EFIC Setpoint That Resulted in Operation Outside Design Basis.Caused by Change in Methodology Used by Util Personnel.Changed EFIC Sys + (12:13:39, 13 December 2024)
- ML20098B132 + (12:13:40, 13 December 2024)
- ML20098B129 + (12:13:41, 13 December 2024)
- NRC-95-4565, Forwards Proprietary Rev 1 to WCAP-14292, AP600 Low- Pressure Integral Sys Test at Oregon State Univ Test Analysis Rept, Vol I & Ii.Encl Withheld + (12:13:42, 13 December 2024)
- ML20098B121 + (12:13:43, 13 December 2024)
- ML20098B124 + (12:13:43, 13 December 2024)
- ML20098B115 + (12:13:44, 13 December 2024)
- ML20098B114 + (12:13:45, 13 December 2024)
- ML20098B112 + (12:13:46, 13 December 2024)
- ML20098B109 + (12:13:46, 13 December 2024)
- 3F0995-12, Informs of Removal of Control Complex 164 Ft Elevation Thermo-Lag Fire Barrier & That Compensatory Fire Watches No Longer Required,Based on Util Evaluation of Function of Barrier,Fire Hazards & FP Features of Fire Area Boundary + (12:13:47, 13 December 2024)
- 3F0995-14, Responds to NRC Re Violation Noted in Insp Rept 50-302/95-13 Re Postulated Fire That Could Result in Makeup Tank Vortexing & 10CFR50,App R Concern.Formal Operability Evaluation Conducted in Accordance w/NOD-14 + (12:13:48, 13 December 2024)
- ML20098B098 + (12:13:48, 13 December 2024)
- 05000302/LER-1995-015, :on 950830,revised Calculations Lead to non- Conservative EFIC Setpoint That Resulted in Entry in ITS 3.0.3.Caused by Change in Methodology Used by Util Engineering Personnel.Changed EFIC Setpoints + (12:13:51, 13 December 2024)
- ML20098B091 + (12:13:56, 13 December 2024)
- ML20098B094 + (12:13:56, 13 December 2024)
- ML20098B087 + (12:13:57, 13 December 2024)
- ML20098B085 + (12:13:58, 13 December 2024)
- ML20098B084 + (12:13:58, 13 December 2024)
- ML20098B080 + (12:13:59, 13 December 2024)
- ML20098B079 + (12:14:00, 13 December 2024)
- ML20098B078 + (12:14:01, 13 December 2024)