ML20098B080

From kanterella
Jump to navigation Jump to search
Forwards Rev 8 to Catawba Unit 1,Cycle 9,Core Operating Limits Rept, Sept 1995
ML20098B080
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 09/28/1995
From: Canady K
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20098B081 List:
References
NUDOCS 9510020127
Download: ML20098B080 (1)


Text

ll l

o.

Duke her Company 1

s

- PO Box 1006

}

Char {otte. NC282011006 i

1 O--

1

- September 28,1995 1

U. S. Nuclear Regulatory Commission I

ATTN: Document Control Desk Washington, D.C. 20555 -

Subject:

Catawba Nuclear Station, Unit 1 '

Docket Number 50-413 Core Operating Limits Report for Cycle 9 Please find attached a revision to the Core Operating Limits Report (COLR) for Catawba Unit 1 Cycle 9, pursuant to Catawba Technical Specification 3/4.9.12. This revision establishes a 1.imiting Condition for Operation (LCO) for the Spent Fuel Pool (SFP) Boron Concentration.

If there are any questions, please contact Richard H. Clark at (704) 382-5823.

j K. S. Canady Manager, Nuclear Engineering Nuclear General Office Nuclear Generation Department sg8 cc: Mr. R. E. Martin, Senior Project Manager bxc: S. A. Gewehr Office of Nuclear Reactor Regulation R. H. Clark U. S. Nuclear Regulatory Commission S.B. Thomas Mail Stop 141125, OWFN B.R. Rash Washington, D.C. 20555 D. A. Wellbaum (CNS)

Z. L. Taylor (CNS)

Mr. S. D. Ebneter, Regional Administrator CNS Master File: CN-801.01 U. S. Nuclear Regulatory Commission - Region II E-NRC-ClC09 COLR 101 Marietta Street, NW - Suite 2900

. Atlanta,GA 30323 i

Mr. R. J. Freudenberger Senior Resident Inspector

' Catawba Nuclear Station 0200.T 9510020127 950928 r*,= omww m, PDR ADOCK 05000413 I

P PDR.

1

)

'