ML20098B154

From kanterella
Jump to navigation Jump to search
Notifies NRC of Implementation Dates Associated W/Recently Issued TS Change Requests for Plant
ML20098B154
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 09/27/1995
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9510020271
Download: ML20098B154 (1)


Text

_

_m m.__

EtttlIn Suppstt Depittmset

.j_

A

_-r PECO ENERGY ll fo",'d="Le,.

065 Chesterbrook Boulevard e-Wayne. PA 19067-5691 September 27,1995 Docket Nos.- 50-352 50-353 License Nos. NPF-3G NPF-85 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

Limerick Generating Station, Units 1 and 2 Technical Specifications Change Requests implementation Dates Gentlemen:

The purpose of this letter is to notify the NRC of implementation dates associated with recently issued Technical Specifications Change Requests (TSCRs) for Limerick Generating Station.

TSCR #

BRIEF DESCRIPTION IMPLEMENTATION DATE 94-32-0 Relocation of Turbine Overspeed Protection September 21,1995 System Requirements 94-47-0 Clarification of Emergency Diesel Generator September 21,1995 Steady State Voltage Range if you have any questions, please do not hesitate to contact us.

Very truly yours,

. h.

G. A. Funger, r.,

Director - Licensing cc:

T. T. Martin, Administrator, Region I, USNRC N. S. Peny, USNRC Senior Resident inspector, LGS R. R. Janati, PA Bureau of Radiological Protection nnnnoq 9510020271 950927 PDR ADOCK 05000352 P~c-. u - _, _ _ P D R,

[

0-