Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NRC-95-0102, Forwards Rev 7a to Fermi 2 Ufsar. Rev 7a Incorporate Changes to QA Program as Result of NRC Approval of TS Amend 104,including Revised Pages to Retract Refs to Plant Mod Not Yet Implemented & Page Inadvertently Omitted from Rev 7 + (12:12:49, 13 December 2024)
- 05000368/LER-1995-002-04, :on 950901,Unit 2 Experienced Automatic RT on B SG High Level as Resust of Human Error Involving Use of Improper Work Surface by Contract Painter.Caused by Human Error.Mgt Suspended All Plant Painting + (12:12:51, 13 December 2024)
- ML20098B381 + (12:12:52, 13 December 2024)
- ML20098B372 + (12:12:53, 13 December 2024)
- ML20098B370 + (12:12:54, 13 December 2024)
- ML20098B362 + (12:12:55, 13 December 2024)
- ML20098B346 + (12:12:55, 13 December 2024)
- ML20098B341 + (12:12:56, 13 December 2024)
- ML20098B338 + (12:12:57, 13 December 2024)
- ML20098B333 + (12:12:57, 13 December 2024)
- ML20098B331 + (12:12:58, 13 December 2024)
- 05000368/LER-1995-003-04, :on 950902,automatic RT on High Axial Shape Index During Startup Due to Inadequate Monitoring & Action to Maintain Excore Power Below Core Protection Calculator Trip Enable Setpoint.Revised Procedure + (12:13:00, 13 December 2024)
- ML20098B326 + (12:13:01, 13 December 2024)
- 05000265/LER-1995-005-09, :on 950825,Units Experienced Automatic Reactor Scram During EHC Pressure Regulator fail-over Test.Caused by Inadequate EHC Sys Pressure Regulator Setpoint Bias.Adjusted EHC Sys Pressure Setpoint Bias & Time Lag Constants + (12:13:03, 13 December 2024)
- ML20098B314 + (12:13:04, 13 December 2024)
- ML20098B308 + (12:13:05, 13 December 2024)
- ML20098B306 + (12:13:06, 13 December 2024)
- ML20098B305 + (12:13:06, 13 December 2024)
- ML20098B299 + (12:13:07, 13 December 2024)
- ML20098B297 + (12:13:08, 13 December 2024)
- NRC-95-4566, Provides List of Matl That Contain No Info That Licensee Considers Proprietary + (12:13:08, 13 December 2024)
- ML20098B280 + (12:13:09, 13 December 2024)
- ML20098B256 + (12:13:10, 13 December 2024)
- ML20098B238 + (12:13:11, 13 December 2024)
- NRC-95-4570, Provides Discussion on Bases for Mass Transfer Correlation Biases Used for AP600 Containment Design Basis Analyses + (12:13:12, 13 December 2024)
- TAC:54531 + (12:13:12, 13 December 2024)
- ML20098B200 + (12:13:14, 13 December 2024)
- NRC-95-4564, Forwards Evaluation Re Probability of Pipe Break in MFW Line within Turbine Bldg & Load Combinations for leak-before- Break in AP600 Plant + (12:13:14, 13 December 2024)
- 05000498/LER-1995-009, :on 950829,reactor Tripped Due to Loss of Reactor Coolant Flow.Caused by Inadequate Supervisory Practices.Discussion Conducted W/Supervisors on Importance of Proper Supervisory Involvement + (12:13:16, 13 December 2024)
- ML20098B186 + (12:13:17, 13 December 2024)
- ML20098B184 + (12:13:18, 13 December 2024)
- ML20098B183 + (12:13:19, 13 December 2024)
- ML20098B180 + (12:13:19, 13 December 2024)
- ML20098B177 + (12:13:20, 13 December 2024)
- ML20098B174 + (12:13:21, 13 December 2024)
- PY-CEI-NRR-1987, Informs That Centerior Electric Co Should Be Substituted Wherever Nomenclature Newco Appears in 940602 Proposed Amend Submittal Re Proposed Merger of Toed & Clei + (12:13:21, 13 December 2024)
- ML20098B164 + (12:13:22, 13 December 2024)
- ML20098B162 + (12:13:23, 13 December 2024)
- ML20098B163 + (12:13:23, 13 December 2024)
- ML20098B159 + (12:13:24, 13 December 2024)
- BSEP-95-0504, Responds to NRC Re Violations Noted in Insp Rept 50-325/95-10 on 950525.Corrective Actions:Will Develop Refuel Floor Project Implementation Plan + (12:13:25, 13 December 2024)
- ML20098B154 + (12:13:25, 13 December 2024)
- 2CAN099505, Forwards Response to NRC Questions Re Util 950404 TS Change Request to Allow Latching & Unlatching of CEAs W/Less than 23 Ft of Water Over Top of Irradiated Fuel Assemblies + (12:13:26, 13 December 2024)
- HL-5034, Forwards Response to NRC Re Violations Noted in Insp Rept 50-321/95-16.Corrective Actions:Valve Stem Was Replaced,Repaired Bonnet & Valve Guides & Valve Was Packed Correctly + (12:13:27, 13 December 2024)
- ML20098B151 + (12:13:27, 13 December 2024)
- ML20098B150 + (12:13:28, 13 December 2024)
- ML20098B148 + (12:13:29, 13 December 2024)
- ML20098B146 + (12:13:32, 13 December 2024)
- ML20098B143 + (12:13:33, 13 December 2024)
- 05000331/LER-1995-009, :on 950829,PCIS Groups 2 Through 5 Isolations Occurred Due to EPA Breaker Trip on Undervoltage. Placed Bus on Alternate Power Supply + (12:13:35, 13 December 2024)
- B15369, Revises Completion Date of Commitment Made in 950330 Response to NOV Re Mod Associated W/Engineering Work Request (EWR) 3-93-109.Mod Should Be Implemented by 960331 + (12:13:36, 13 December 2024)
- 05000302/LER-1995-016, :on 950831,revised Calculations Lead to non- Conservative EFIC Setpoint That Resulted in Operation Outside Design Basis.Caused by Change in Methodology Used by Util Personnel.Changed EFIC Sys + (12:13:39, 13 December 2024)