Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20098E383 + (11:59:48, 13 December 2024)
- ML20098E380 + (11:59:49, 13 December 2024)
- ML20098E376 + (11:59:50, 13 December 2024)
- ML20098E369 + (11:59:51, 13 December 2024)
- ML20098E364 + (11:59:52, 13 December 2024)
- ML20098E356 + (11:59:52, 13 December 2024)
- 05000361/LER-1984-033, :on 840616,during Hydrostatic Testing of Fire Main Piping,Leakage Occurred Through Hydrostatic Test Boundary Valves,Pressurizing Fire Main Above Operating Pressure.Caused by Cracked Piping + (11:59:54, 13 December 2024)
- ML20098E341 + (11:59:55, 13 December 2024)
- ML20098E316 + (12:00:00, 13 December 2024)
- ML20098E305 + (12:00:02, 13 December 2024)
- 0CAN059204, Annual Rept of Errors or Changes in ECCS Sys Evaluation, 1991 + (12:00:06, 13 December 2024)
- 05000286/LER-1984-013-01, :on 840822,turbine Generator & Reactor Trips Initiated Automatically on High Level in Steam Generator 32. Caused by Feedwater Sys Transient Due to Leak in Control Oil Sys.Leak Repaired + (12:00:09, 13 December 2024)
- 05000249/LER-1984-012-05, :on 840823,unit Scrammed on Intermediate Range Monitor (IRM) hi-hi W/Companion APRM Downscale When IRMs Inserted.Caused by Personnel Error.Causes & Corrective Actions Investigated + (12:00:11, 13 December 2024)
- ML20098E267 + (12:00:13, 13 December 2024)
- 05000328/LER-1984-013-02, :on 840820,pressurizer Relief Tank Rupture Disc Ruptured,Resulting in Containment Ventilation Isolation & Unit Shutdown.Caused by Leaking Pressurizer Safety Valve. Discs & Valves Replaced + (12:00:15, 13 December 2024)
- 05000237/LER-1984-011, :on 840705,fire Watch Established Due to Discovery of Several Unsealed Mechanical Penetrations.All Penetrations Sealed W/Cerafiber & Vimasco + (12:00:17, 13 December 2024)
- ML20098E248 + (12:00:18, 13 December 2024)
- 05000483/LER-1984-032, :on 840820,control Room Ventilation,Containment Purge & Fuel Bldg Ventilation Isolations Actuated.Caused by Failed 15-volt Dc Power Supply in ESF Actuation Sys Cabinet. Power Supply Replaced + (12:00:20, 13 December 2024)
- 05000366/LER-1984-020, :on 840821,unplanned Full Reactor Protection Sys Actuation Occurred.Caused by Opening Links When Turbine Off Line.Procedure Being Revised + (12:00:22, 13 December 2024)
- ML20098E237 + (12:00:23, 13 December 2024)
- ML20098E231 + (12:00:24, 13 December 2024)
- ML20098E226 + (12:00:25, 13 December 2024)
- ML20098E224 + (12:00:26, 13 December 2024)
- BECO-84-159, Forwards Rev 1 to Detailed Control Design Review, Per 831026 Commitment & NUREG-0737,Item 1.D.1 + (12:00:27, 13 December 2024)
- ML20098E213 + (12:00:27, 13 December 2024)
- ML20098E209 + (12:00:28, 13 December 2024)
- BECO-84-155, Forwards Pilgrim Nuclear Power Station Training Manual, Per Generic Ltr 84-14 + (12:00:29, 13 December 2024)
- ML20098E194 + (12:00:30, 13 December 2024)
- ML20098E195 + (12:00:30, 13 December 2024)
- 3F0592-15, Rev 2 to TS Change Request 165,correcting TS Index Pages & Section 6.9.2, Special Repts Re Fire Svc Sys + (12:00:31, 13 December 2024)
- 05000219/LER-1984-019, :on 840817,scram Discharge Vol Drain Valves V-15-121 & V-15-134 Failed to Close.Caused by Mispositioned Mechanical Override to V-15-121 & Binding in V-15-134. Override Repositioned & V-15-134 Overhauled + (12:00:33, 13 December 2024)
- JPN-92-022, Reaffirms Commitment to Perform Reliability Testing of Manual Bus Transfers Between Onsite & Offsite Power Supplies & Resolve 4.16 Kv Switchgear Deficiency,Per NRC Recommendations in Safety Evaluation + (12:00:34, 13 December 2024)
- ML20098E186 + (12:00:34, 13 December 2024)
- 0CAN059203, Advises That Util Will Perform Detailed Evaluation of Withdrawal of 891019 Application for Amends to Licenses DPR-51 & NPF-6,changing Operational & Surveillance Requirements for Main Steam Line Radiation Monitors + (12:00:35, 13 December 2024)
- ML20098E174 + (12:00:36, 13 December 2024)
- ML20098E171 + (12:00:36, 13 December 2024)
- ML20098E170 + (12:00:37, 13 December 2024)
- ML20098E168 + (12:00:38, 13 December 2024)
- 05000328/LER-1992-005-01, :on 920414,Loop 3 Main Steam Check Valve Found Stuck in Open Position.Caused by Interference Between counter-weight Arm Assembly & packing-gland Stud.Work Instructions Revised Re Proper Clearance + (12:00:39, 13 December 2024)
- ML20098E165 + (12:00:40, 13 December 2024)
- LD-92-071, Requests That Mailing List for Sys 80+ Project Be Revised as Indicated on Encl.Eh Kennedy Should Be Replaced W/Cb Brinkman + (12:00:41, 13 December 2024)
- 05000247/LER-1984-011, :on 840813,at Cold Shutdown,Two Component Cooling Water Pumps & Standby Pump Tripped on Overcurrent Protection Signal.Caused by Wetting of Pump Motors.Pumps Returned to Svc + (12:00:43, 13 December 2024)
- 05000302/LER-1992-005, :on 920429,determined That EDG Could Exceed Max Rating for Certain Makeup Pump Operational Lineups. Caused by Failure to Analyze Consequences of Loss of Offsite Power Event.Surveillance Procedures Revised + (12:00:45, 13 December 2024)
- LD-92-070, Discusses Sys 80+ Human Factors Engineering Review Criteria, Per 920519 Meeting.Text of Draft SER Should Clearly State That Work Continuing w/ABB-C-E Through Public Meetings to Converge on Set of Criteria for Review of Nuplex 80+ + (12:00:46, 13 December 2024)
- ML20098E158 + (12:00:46, 13 December 2024)
- ML20098E138 + (12:00:47, 13 December 2024)
- ML20098E128 + (12:00:48, 13 December 2024)
- ML20098E129 + (12:00:48, 13 December 2024)
- ML20098E126 + (12:00:49, 13 December 2024)
- BSEP-84-2024, RO 1-84-17:on 840821,normal Sys Flow in Unit 1 RHR Svc Water Loop B Could Not Be Established.Cause Unknown.Next Rept Will Be Submitted by 841022 + (12:00:50, 13 December 2024)
- ST-HL-AE-4106, Forwards Rev 19 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) + (12:00:50, 13 December 2024)