Interim Deficiency Rept DER 84-26 Re Improperly Tested or Adjusted Interlock.Initially Reported on 840510.Due to Extensive Investigation & Evaluation Required,Next Rept Delayed Until 841012
ML20098E267
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 09/11/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-30480-TDS, ANPP-30489-TDS, DER-84-26, NUDOCS 8409280289
Download: ML20098E267 (2)


Text

p.

F i t e _-

y.

L Arizona Public Service Company l-m September 11, 1984 ANPP-30480-TDS /TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Offit.e Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 84-26 A 50.55(e) Potentially Reportable Deficiency Relating To Improperly Tested or Adjusted Interlock.

File: 84-019-026; D.4.33.2 Ref erence: ( A) Telephone conversation between P. Narbut and T. Bradish on May 10, 1984 (B) ANPP-29646, dated June 4, 1984 (Interim Report)

(C) ANPP-30190, dated August 13, 1984 (Time Extension)

Dear Sir:

'rS 3

m m

rn The NRC was notified of a potentially reportable deficiency in b

"~

Reference ( A), an Interim Report was transmitted by Reference (BE' and 4 h

~

Time Extension was :equested by Ref erence (C). At that time, it.Was x

estimated that a Fin il Report would be available by September 15,*1984,9 b

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by October 12, 1984, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours, zemb+k E. E. Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director

.EEVB/TRB/nj cc: See Page Two S

_IS~kl D

p P-bd-

'+

. Mr. T. W. Bishop DER ' 84-26 Page Two, cc:

Richard ~ DeYoang,. Director.

- Office of Irspection and Enforcement U. S. Nuclear Regulatory Commission

' Washington, D. ' C. _~. 20555 1

T. G. Woods,1 Jr.

D.-B. Karner W.'E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler' T. ' D. Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen J. A; Brand D. Canady A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson

- R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen R. P. Zimmerman S. R. Frost L. Clyde M. Woods T. J. Bloom

. Records Conter Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339 l