Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20099F160 + (11:36:00, 13 December 2024)
- ML20099F151 + (11:36:01, 13 December 2024)
- ML20099F152 + (11:36:01, 13 December 2024)
- ML20099F146 + (11:36:02, 13 December 2024)
- ML20099F145 + (11:36:03, 13 December 2024)
- ML20099F143 + (11:36:03, 13 December 2024)
- 3F1184-07, Forwards Changes to Rev 4 to Modified Amended Security Plan. Changes Withheld (Ref 10CFR73.21) + (11:36:04, 13 December 2024)
- ML20099F133 + (11:36:04, 13 December 2024)
- JAFP-92-0590, Monthly Operating Rept for Jul 1992 for Ja Fitzpatrick Nuclear Power Plant + (11:36:05, 13 December 2024)
- ML20099F129 + (11:36:06, 13 December 2024)
- ML20099F131 + (11:36:06, 13 December 2024)
- ML20099F126 + (11:36:07, 13 December 2024)
- ML20099F125 + (11:36:08, 13 December 2024)
- ML20099F122 + (11:36:08, 13 December 2024)
- 05000374/LER-1992-009-05, :on 920714,RCIC Turbine Exhaust Vacuum Breaker Upstream stop,motor-operated Valve Tripped.Caused by Thermal Overload on Motor Control Ctr Due to Packing Binding.Valve Stroke Frequency Increased + (11:36:10, 13 December 2024)
- ML20099F108 + (11:36:11, 13 December 2024)
- RBG-19386, Interim Deficiency Rept DR-227 Re Push Rod Sockets in Rocker Arm Assemblies for Tdi Standby Diesel Generator 1EGS*EGIA. Interim or Final Status Rept Will Be Provided by 850116 + (11:36:12, 13 December 2024)
- B14212, Advises That Util Intends to Utilize ASME Code Case N481 for Insp of RCP Casings at Facility,In Support of Relief Request RR-2 Re Alternate Exams of External Weld Surface & Internal Surface of Rcp,Transmitted Via + (11:36:13, 13 December 2024)
- ML20099F097 + (11:36:14, 13 December 2024)
- ML20099F089 + (11:36:15, 13 December 2024)
- ML20099F088 + (11:36:16, 13 December 2024)
- ML20099F087 + (11:36:17, 13 December 2024)
- BECO-84-190, Application for Amend to License DPR-35,revising Tech Spec Sections 6.1 Through 6.8 & Figures 6.2.1 & 6.2.2 Re Organizational Responsibilities.Fee Paid + (11:36:18, 13 December 2024)
- 0CAN089202, Forwards Response to Violations Noted in Insp Repts 50-313/92-06 & 50-368/92-06 Re Activities Associated W/ Failure to Properly Test Security Equipment as Required.Encl Withheld + (11:36:18, 13 December 2024)
- ML20099F078 + (11:36:19, 13 December 2024)
- ML20099F070 + (11:36:20, 13 December 2024)
- 05000382/LER-1992-006-01, :on 920711,unidentified RCS Leakage Greater than TS 3.4.5.2 Limit of 1 Gpm Discovered.Caused by Failure of Temporary Leak Repair to Hot Leg Sample Valve.Valve Closed & Repaired by Sealant Injection + (11:36:22, 13 December 2024)
- SNRC-1104, Forwards Requested Addl Info Re Various Aspects of Newly Developed Qualified Load for Tdi Diesel Generators,Per 841026 Telcon + (11:36:23, 13 December 2024)
- ML20099F042 + (11:36:24, 13 December 2024)
- ML20099F026 + (11:36:25, 13 December 2024)
- ML20099E994 + (11:36:29, 13 December 2024)
- ML20099E993 + (11:36:30, 13 December 2024)
- ML20099E992 + (11:36:31, 13 December 2024)
- ML20099E988 + (11:36:31, 13 December 2024)
- ML20099E986 + (11:36:32, 13 December 2024)
- ML20099E977 + (11:36:34, 13 December 2024)
- ML20099E976 + (11:36:35, 13 December 2024)
- FVY-84-132, Forwards Startup Test Rept Vermont Yankee Cycle 11, Per Tech Spec Section 6.7.A.1 Requirements + (11:36:36, 13 December 2024)
- ML20099E962 + (11:36:39, 13 December 2024)
- ML20099E960 + (11:36:40, 13 December 2024)
- ML20099E949 + (11:36:41, 13 December 2024)
- ML20099E948 + (11:36:41, 13 December 2024)
- ML20099E946 + (11:36:42, 13 December 2024)
- 05000369/LER-1984-025-02, :on 840712,Westinghouse Filed Part 21 Rept Re Potential Overpressurization of Component Cooling Water Sys. Mods Will Be Designed & Implemented to Increase Relief Capacity of Surge Tanks + (11:36:44, 13 December 2024)
- ML20099E943 + (11:36:45, 13 December 2024)
- B14014, Proposed TS Table 3.6-2 Re Containment Isolation Valves + (11:36:46, 13 December 2024)
- B14041, Application for Amend to License DPR-65,changing TS Table 3.6-2 to Include Addition of Bypass Lines & Associated Containment Isolation Valves 2-MS-458 & 2-MS-459 to Provide Drainage Path for Condensate During Plant Startup + (11:36:47, 13 December 2024)
- 1CAN089202, Requests 30-day Extension of Submittal Date for Inservice Insp Outage Summary Rept Due to Be Submitted on 920807. Extension Required Due to Heavy Workload Following Tenth Refueling Outage Which Ended on 920509 + (11:36:47, 13 December 2024)
- ML20099E932 + (11:36:48, 13 December 2024)
- RBG-37295, Informs That Util Will Revise Vendor Interface Program to Reflect Contact w/safety-related Vendors on Once Per Cy Basis,Per 900928 Response to Generic Ltr 90-03, Vendor Interface for Safety-Related Components + (11:36:49, 13 December 2024)
- ML20099E928 + (11:36:49, 13 December 2024)