Text
Sc
'( -
[
.3
-- 4 I
f{,
T g5 A
lemphone H12,350-ME
-- Nucsear Group.
V O bon A Snippregno.-t FA 150N4404 August 10, 1992 Beaver Valley rover Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF 'i3 Monthly Omratirn Rercrt
- U. S, Nuclear Regulatory Commission
' Doctunent Control Desk
- Washington, D.C.
20555 GentleJren:
In accordance ' with Appendix A,
Technical Specifications, the Ponthly Operating Report is sulnitted for Unit 3 and Unit 2 for the raanth of July, 1992.
1 Very truly yours, i
sh J. D. Siebor
- j Vice President
-\\/ Nuclear Group DTJ/mmg
?EncloGures cc: NRC Regional Office' King of Prussia, PA i
. F f
C R
y
_}
s
~
e,.
- r, ilARPATIVE SU4fARY OF
- '4 FDITITU Y OPEPATING - EXPERIDCE
(
UNIT 1
' JULY 1992 9
- July-1 The Unit operated at a nomina 2 value of 100% output.
_through l-Jul'f7-s,
. July 8.
Ac 2150 ' b ~ its the tl nits output was reduced by approximately to 1..Jve corditions in the condenser hot -. ell. At 2%
4 2330 hours0.027 days <br />0.647 hours <br />0.00385 weeks <br />8.86565e-4 months <br /> the Units output wa<a raturred to a trainal valee of 100%.
- July,9
'Ibe Unit operated at a nominal value of 100% outTut.
Ltjuungh July 30 -
Julv 31-At-2000 hours the Units output was reduced to approximately 70% to load follow f ar the remairda ~of the report _ period.
.y 1
4 9
9-1 x
&y E
).13$
+
~
,l L-1 L',
a OPERATING DATA REPORT DOCKET NO.
50-334 REPORT DATC:
08/03/92 COMPLETED BY; DAVID T.
10NES TELEPHONE:
(412) 393-7612 OPEPATING SIAILM 1.- UNIT NAME: BEAVER VALLEY POWER STATT.ON, UNIT 1 Notes
[_f
- 2. REPCRTING PERIOD: JULY 1992
- 3. LICENSED THERMAL POWER (!Nt):
2652
- 4. NAMEHAT2 RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Nit MWe):
835
- 6. MAX. DEPEND /.BLE CAPACITY (Gross XVe):
860
(
7, MAX. DEPENDABLE CAPACITY (Net INe):
810
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE 1AST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO VHICH RESTRICTED, IF A'? (Net MWc):
N,;ne
-10. REASONS'FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMULATIVE s
- 11. HOURS IN REPORTING PERIOD:
744 0 5111.0 142463,0
.12.
.NO. OF HRS. REACTOR V 3RITICAL:
744.0 5111.0 90434.6
- 13. REACTOR RLSERVE SHUIO.. HOURS:
0.0 0.0 4482.8
- 14. HOURS CENERATOR VAS ON LINE:
744.0 5111.6 88542.2
- 15. UNIT RESERVE SHUTDOWN HOURS:
0,0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH)-
1965639.0 13344394.0 211856570.5
- 17. CROSS ELECT; ENERGY CEN. (MWH):
640430.0 4373520.0 68171923.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
604500.0 4128790.0 63696340.0 z19. UNIT SERVICE FACTOR: (PERCENT).
100.0 100.0 64.2
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 100.0 64.2
- 22. UNIT CAPACITY FACTOR (DER): PCT 97.3 96.7 56.2 mE
- 23. UNIT FORCED OUTAGE RATE: (PERCF"T) 0.0 0.0 15.9
- 24. SHUTDOWNS SCHEDUIS.D OVER NEAT SIX MONTHS (TYPE,DATE, AND DURATION OF EACH);
-25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF SThRTUP:
26; UNITS IN. TEST STATUS (PRIOR TO COMKERCIAL OPERATION):
):
FORECl,ST ACHIEVED INITIAL CRITICALITY
_ N/A N/A _
INITIAL ELECTRICITY N/A N/A COMMERCIAL OTOATION N/A N/A
(
l i
1--
. _j
l - --..f
- 1 AVER.'4E DAILY LUIT FGER If!EL DOCKET 10.
50-334 UITIT BVPS Unit 1 DATE _ALxTast 3. 1992__
CCt<PIEITD BY David T. Jones TELEPIDNE (412) 393-7612
!Otmi. July 1992 DAY AVERAGE DAILY P0fER IEVEL DAY AVERAGE DAILY POWER IIVEL (IMc-Net)
(!&e-Nat) 1 813 17 813 2
808 18 617 3-808 19 817
.4:
-813 20 817
'S 813 21 821 6
825 22 821
-7 817 23 813 8
813 24 817-
+
9-800 25 6'1 10 808 26 808 11-
=813 27-817-
- 12 804 28 813 13
-804 29 821
. 14 -
804 30 Q17 15 808-31 796 16-813 INSTRUCTIONS' On.this formt, list 02 average daily unit power level INe-Net for each day in the reporting month. Campite to the nearest whole megawatt.
e..
-e
~
79. ; '
,3.,
P,
- r-7_
n e
.c...,..
f
- c.
-n.
,v
.c n..
- . UNIT S3UTDOWS AND POWER RLJbCT!cN5 -(220%) '
. Doc *tet. & ' $bi334'
.q thit. Name. :.BVP5 Uni t #1._a 4
Date' Auoust 3r1o92 '
Comoteted Gy-David T.-Jonec
' REPORT - MONIN JULY 1993 x
-Telephone. (412) 393-7672
' f l.
Method off Licensee:
l Cause'& Corrective.
Durstton-
- shutting.
. Event.
System
' Component Action tot
.'No.
Date
-Typel.
. (Heurs)'
- Reason 2-Down Reactor 3 Repcrt #
. Code 4 Code 5 Prevent Recurrence 0
N
' 5 '-
.N/A ZZ-ZZZZZZ units cutput reduced from.100% to -
'4
-920731 4
.l.
appro.uimately 70% to' toad follow.
1 2-3 4
F-Forced Reason:
Method:
. Exhibit F-Instructions for S-Scheduled A-Equipment Failure (Cxplain) 1-Munual Preparation of Data Entry Sheets' B Mairtenance or Test 2-Manual Scram for Licensee Event Report (LER) Fite C-Ref=eting-3-Automatic Scram (NUREC0161).
D-Regulatory Restriction 4-Cent'd. from Previous Month E-operator Training 1 License Exam Reduction
-5 F-Admini st ra t ive.
9-Other Exhibit H-Sar.e source.
G-operational Err )r (Explain)
H-Otter (Explain)
..u.
7n Y,
INTM SIM4ARY OF MotTIHLY OPERATDJG DTERIDICE Uti1T 2
~ JULY 1992 July'1 The Unit operated at a nm.inal value of 100% output.
e,3 through
. July-15
.. July'16 At 2034 hours0.0235 days <br />0.565 hours <br />0.00336 weeks <br />7.73937e-4 months <br /> the Unit commenced a load reduction to 49%
output. to repair an inoperable pcuer range instrumentation chanrel- (1144).
July ' 17 '-
'Ihe Unit -began power escalation at 1542 hours0.0178 days <br />0.428 hours <br />0.00255 weeks <br />5.86731e-4 months <br /> after-
~
. returning power range instrunentation channel N44 to operable status.
100% output was achieved at 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br />, July 18 The Unit operated at a nomirol value of 200% output.
thrcnJh July:31 a
i I'
e L.
i j t.
OPERATING DATA REPORT DGCKET No.
50 412 REPORT DATE:
08/04/92 CCMPLETED BY: DAVID T. JONES TELEPHONE:
(412) 393 7612 O_PFRATIf1G STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: JULY 1992
- 3. LICENSED THERllAL POWER (MWt):
2652
- 4. NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
836
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
870
- 7. MAX. DEPENDABLE CAPACITY (Net MWe);
820
.+
- 8. IF CHANGF.S OCCUR IN CAPACITY RATINGS SINCE 123T REPORT, GIVE REASONS:
- s. POWER LE*1EL TO VHICH PESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMUIATIVE a
-11. HOURS IN REPORTING PERIOD:
744.0 5111.0 41246.0
- 12. NO, OF PRS. REACTOR VAS CRITICAL:
744.0 3748.0 34828.2
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.i 0.0 0.0
- 14. HOURS GENERATOR VAS ON LINE:
744.0 3670.3 34552.3
- 15. UNIT RESERVE SHUTDOVN HOURS:
0.0 0.0 0.0 16, GROSS THERMAL ENERGY GEN. (MWH):
1934799.0 8944587.0 84304334.4
- 17. GROSS ELECT. ENERGY GEN. (MWH):
632652.0 2895158.0 27069739.0
- 13. NET ELECTRICAL ENERGY GEN. (MWH):
600230.0 2727041.0 25532526.0 c
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 71.8 83.8 l
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 71.8 83.8
- 22. UNIT CAPACITY FACTOR (DER): PCT 96.5 63.8 74.0
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.4 3.6
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH);
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP.
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N /A N/A COMMERCIAL OPEEATION N/A
_Ji/A
p AVERAGE DAILY UTIT POWER IEEL DOCKET NO.
50-412 U3IT BVPS Unit 2 DATE Aucrust 3, 1992 OOMP2I7.D BY David T. Jones TELEPfuiE (412) 393-7612 10 01 July 1992 DAY AVERAGE DAILY POWER UNEL DAY AVERAGE DAILY POWER LEVEL (ifde-Net)
(MWe-Net) 1 315 17 485
'2 814 18 820 3
'811 19 818 7
4 821 20 814 5-819 21 824
.6 826 22 822
, 824 23 819'
' ~
- 8_'
818' 24 8 17 9'
810 25 819 10 814
'26 816 j
11
-815 27 817 12' 8 13 2S 831 13-811 29 829
-14/
800 30 827 15 J17 31 828
- 6.
790 E
'INSTP1UI' IONS:
On this format, list the average daily unit power level NWe-Net for each day in the reportirrJ nonth. Campute to the nearest whole regawatt.
C ',.
_ 9::'-
~....
.: 5;;
~ ~; ~
~
E-
- p a.
3., :., -
- ,. 7,
- -
m**
' ^ *"r g.
en
- u..
- ._+'
.,4
+.-
-CWIT.SildTDOVWSAhD-POWERREDUCTIONS(t2(,k)',
Docket No.
50-412
[-;h Unit Name _BVPS ttnit #2-
, Oste. August 3. 1992
- Compleeted Sy David T. Jones-REPORY MONTH JULY 1992' Telephone (412) 393-~4612-r Methcd of-Licensee.
'Cause & Corrective Duration
.~Shuttins Event System-CCWt Action to N o.'
Date.
Type 1.
(Nours)'
Reason 2
.Down Reacter3
. Report af
, Code 4..
Code 5
" Prevent Recurrence.
16 '
920716-
.. F.
0
-. B 5'
. W/A -
- IF-INSTRU_.
Unit's output recuded frem 100% to 49% to repair an inoperable' power rarge instrumentation channet (ii44 ),
l I.
I 5
I J
1 2
3-4 F-foaced Reason:
Methed; Exhibit F-Instructions for 5-Scheduled
.A-iquipment.Falture (Explain) 1-Manual Preparation of trata Entry Sheets i
B-Maintenarece or Test 2 Manual scrse for 1icensee Event Report (LER) Fite C-Retueting 3* Automatic iceam (NtJREG0161).
D-2egulatory Aestriction 4,ont'd. from Previous Month E-Operator. Training & License Exam 5* Reduction 5
F-Administrative 9-Other Exhibit H-same Source.
G-operational Error (Explain) 4-Other (Explain) v 1-.
s
.