Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20100C479 + (11:03:56, 13 December 2024)
- LD-85-013, Discusses CESSAR Confirmatory Issues 1 & 2 Re Single Failure Vulnerability of Auxiliary Pressurizer Spray.Power Supply Isolators for Valves CH-239 & CH-240 Will Be Added If Sufficient to Close Confirmatory Issues 1 & 2 + (11:03:57, 13 December 2024)
- ML20100C469 + (11:03:58, 13 December 2024)
- ML20100C471 + (11:03:58, 13 December 2024)
- 1CAN038509, Application for Amend to License DPR-51,deleting ETS in Entirety.Justification for Deletion & Significant Hazards Consideration Encl.Fee Paid + (11:03:59, 13 December 2024)
- ML20100C448 + (11:04:03, 13 December 2024)
- ML20100C442 + (11:04:04, 13 December 2024)
- ML20100C441 + (11:04:04, 13 December 2024)
- ML20100C427 + (11:04:05, 13 December 2024)
- ML20100C411 + (11:04:06, 13 December 2024)
- ML20100C401 + (11:04:06, 13 December 2024)
- ML20100C386 + (11:04:07, 13 December 2024)
- 05000255/LER-1985-002-01, :on 850219,during Review of Tech Spec Test, Discovered Surveillance Interval for Three of Four Safety Injection Tanks Exceeded.Caused by Personnel Error. Disciplinary Action & Counseling Administered + (11:04:10, 13 December 2024)
- LD-85-014, Forwards Revs to 1984 Final Repts Re Removal of Safety Injection Nozzle Thermal Sleeve & CEA Guide Tube Brackets. Corrective Actions for Reactor Coolant Pumps & Temp Detector Thermowell Listed.Concurrence Requested by 850430 + (11:04:11, 13 December 2024)
- ML20100C377 + (11:04:11, 13 December 2024)
- AECM-84-0455, Responds to NRC Re Violations Noted in Insp Rept 50-416/84-24.Corrective Actions:Training of Nuclear Plant Engineering Personnel Stressing Util Position on Higher Stds of Technical Competence Conducted on 840828 + (11:04:12, 13 December 2024)
- ML20100C366 + (11:04:13, 13 December 2024)
- ML20100C350 + (11:04:14, 13 December 2024)
- ML20100C346 + (11:04:15, 13 December 2024)
- ML20100C344 + (11:04:16, 13 December 2024)
- ML20100C343 + (11:04:16, 13 December 2024)
- ML20100C340 + (11:04:18, 13 December 2024)
- ML20100C335 + (11:04:19, 13 December 2024)
- ML20100C334 + (11:04:20, 13 December 2024)
- ML20100C333 + (11:04:21, 13 December 2024)
- ML20100C325 + (11:04:22, 13 December 2024)
- ML20100C322 + (11:04:23, 13 December 2024)
- RBG-20398, Interim Deficiency Rept DR-274 Re Field Wiring to Asco & Target Rock Corp Solenoid Valves.Next Rept Will Be Provided by 850329 + (11:04:23, 13 December 2024)
- ML20100C309 + (11:04:24, 13 December 2024)
- RBG-20397, Interim Deficiency Rept DR-271 Re Containment Penetrations Supplied by Conax Corp for Resistance Temp Detector Circuits.Next Rept Will Be Provided by 850322 + (11:04:25, 13 December 2024)
- RBG-20399, Interim Deficiency Rept DR-277 Re External Solder Fluxes for Electrical Terminations.Next Rept Will Be Provided by 850329 + (11:04:25, 13 December 2024)
- ML20100C300 + (11:04:26, 13 December 2024)
- ML20100C299 + (11:04:27, 13 December 2024)
- ML20100C291 + (11:04:28, 13 December 2024)
- ML20100C286 + (11:04:29, 13 December 2024)
- RBG-20404, Final Deficiency Rept DR-283 Re Multicable Transit Modules Used as Pressure Barrier Seal in Drywell Sleeve Electrical Penetrations.Initially Reported on 850207.Pressure Seals Installed in All Drywell Sleeves + (11:04:29, 13 December 2024)
- JPN-96-004, Forwards Application for Amend to License DPR-59,revising Allowed out-of-service Times for Single Inoperable EDGs to Accommodate on-line Maint of EDGs + (11:04:30, 13 December 2024)
- ML20100C282 + (11:04:31, 13 December 2024)
- 05000251/LER-1985-007, :on 850218,containment Spray Pump Power 4A Supply Breaker Inoperable.Caused by Closing Spring Charging Motor Being Off During Test,Resulting in Closing Springs Discharging.Charging Power Restored + (11:04:33, 13 December 2024)
- ML20100C270 + (11:04:34, 13 December 2024)
- ML20100C260 + (11:04:35, 13 December 2024)
- ML20100C247 + (11:04:36, 13 December 2024)
- RBG-19-577, Forwards Responses to NRC Request for Addl Info,Providing Final Close Out to SER Table 1.4 Confirmatory Items 8 & 9 Re Fuel Assembly Peak Acceleration.Changes to FSAR Text Will Be Incorporated in Future Amend + (11:04:36, 13 December 2024)
- ML20100C236 + (11:04:38, 13 December 2024)
- ML20100C230 + (11:04:39, 13 December 2024)
- ML20100C232 + (11:04:39, 13 December 2024)
- ML20100C222 + (11:04:44, 13 December 2024)
- ML20100C204 + (11:04:45, 13 December 2024)
- ML20100C211 + (11:04:45, 13 December 2024)
- ML20100C187 + (11:04:46, 13 December 2024)
- U-602541, Forwards Rev 21 to Physical Security Plan.Rev Withheld Per 10CFR73.21(c)(2) + (11:04:47, 13 December 2024)
- ML20100C152 + (11:04:48, 13 December 2024)