p terg#g UNITED STATES
[,
S NUCLEAR REGULATORY COMMISSION j
WASHINGTON, D.C. 2006640M GULF STATES UTILITIES COMPANY **
CAJUN ELECTRIC POWER COOPERATIVE AND ENTERGY OPERATIONS. INC.
DOCKET NO. 50-458 RIVER BEND STATION. UNIT 1 i
AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 87 License No. NPF-47 1.
The Nuclear Regulatory Commission (the Comission) has found that:
A.
The application for amendment by Gulf States Utilities * (the licensee) dated May 30, 1995, as supplemented by letters dated November 20 and December 12, 1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Comission; 1
C.
There is reasonable assurance:
(1) that the activities authorized i
by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; I
D.
The issuance of this license amendment will not be inimical to the comon defense and security or to the health and safety of the public; and
- E0I is authorized to act as agent for Gulf States Utilities Company, which has been authorized to act as agent for Cajun Electric Power Cooperative,
)
and has exclusive responsibility and control over the physical construction, operation and maintenance of the facility.
t
- Gulf States Utilities Company, which owns a 70 percent undivided interest in River Bend, has merged with a wholly owned subsidiary of Entergy i
Corporation.
Gulf States Utilities Company was the surviving company in
)
the merger.
9601300298 960129 PDR ADOCK 05000458 p
4
- l.,
E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly' the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment; and Paragraph 2.C.(2) of Facility Operating License No. NPF-47 is hereby amended to read as follows:
(2) Technical Specifications and Environmental Protection Plan i
The Technical Specifications contained in Appendix A, as revised through Amendment No. 87 and the Environmental Protection Plan j
contained in Appendix B, are hereby incorporated in the license.
E0I shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
The license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION David L. Wi g nton, Senior Project Manager Project Directorate IV-1 Division of Reactor Projects Ill/IV Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: January 29, 1996
ATTACHMENT TO LICENSE M4ENDMENT NO. 87 FACILITY OPERATING LICENSE NO. NPF-47 DOCKET NO. 50-458 Replace the following pages of the Appendix A Technical Specifications with the attached pages. The revised pages are identified by Amendment number and contain marginal lines indicating the areas of change.
REMOVE INSERT 3.6-61 3.6-61 3.6-62 3.6-62 3.6-63 3.6-63 3.6-64 3.6-64 3.6-65 3.6-65 3.6-66 3.6-66 3.6-67 3.6-67
Drywell 3.6.5.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.6.5.1.3 Verify bypass leakage is less than or
NOTE-----
equal to the bypass leakage limit.
SR 3.0.2 is not l
applicable for However, during.the.first unit startup extensions > 12 following bypass leakage testing months.
performed in accordance with this SR, the acceptance criterion is s 10% of the drywell bypass leakage limit.
24 months following 2 consecutive tests with bypass leakage greater than the bypass leakage limit until 2 consecutive tests are less than or equal i
to the bypass leakage limit E
48 months following a test leakage bypass leakage greater than the bypass leakage limit M
120 months RIVER BEND 3.6-61 Amendment No. 81, 87
-_ c Drywell 3.6.5.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY Once prior to SR 3.6.5.1.4 Visually inspect the exposed accessible performance of interior and exterior surfaces of the each Type A drywell.
test required by SR 3.6.1.1.1 SR 3.6.5.1.5 Verify seal leakage rate when the gap Once within 72 between the door seals is pressurized to hours after 2 3 psid.
each drywell air lock door closing SR 3.6.5.1.6 Verify drywell air lock leakage by 24 months performing an air lock barrel leakage test at 1 3 psid.
l RIVER BEND 3.6-62 Amendment No. B1, 87 i
Drywell Air Lock 3.6.5.2 3.6 CONTAINMENT SYSTEMS 3.6.5.2 Drywell Air Lock LCO 3.6.5.2 The drywell air lock shall be OPERABLE.
APPLICABILITY:
MODES 1, 2, and 3.
ACTIONS
NOTE-------------------------------------
l Entry and exit is permissible to perform repairs of the affected air lock components.
l CONDITION REQUIRED ACTION COMPLETION TIME A.
One drywell air lock
NOTES------------
door inoperable.
1.
Required Actions A.1, A.2, and A.3 are not applicable if both doors in the air lock are inoperable and Condition C is entered.
2.
Entry and exit is permissible for 7 days under administrative controls.
A.1 Verify the OPERABLE 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> door is closed.
bliQ (continued) l RIVER BEND 3.6-63 Amendment No. B1, 87
Drywell Air Lcck 3.6.5.2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
(continued)
A.2 Lock the OPERABLE 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> door closed.
AND A.3 Verify by Once per 31 days administrative means the OPERABLE door is locked closed.
B.
Drywell air lock
NOTES----
=--
interlock mechanism 1.
Required Actions B.1, inoperable.
B.2, and B.3 are not applicable if both doors in the air lock are inoperable and Condition C is entered.
2.
Entry and exit is permissible under the control of a dedicated individual.
= __
B.1 Verify an OPERABLE 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> door is closed.
AND B.2 Lock an OPERABLE door 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> closed.
680 B.3 Verify by Once per 31 days administrative means an OPERABLE door is locked closed.
(continued) l RIVER BEND 3.6-64 Amendment No. 61, 87
Drywell Air Lock 3.6.5.2 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME l
C.
Drywell air lock C.1 Verify a door is I hour inoperable for reasons closed.
other than Condition A or B.
AE l
C.2 Restore air lock to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> OPERABLE status.
D.
Faquired Action and D.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.
AE D.2 Be in MODE 4.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> l RIVER BEND 3.6-65 Amendment No. 81, 87
Drywell Air Lock 3.6.5.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY l
SR 3.6.5.2.1 Deleted SR 3.6.5.2.2 Verify drywell air lock seal air flask 7 days pressure is 1 75 psig.
NOTE--------------------
Only required to be performed upon entry into drywell.
1 Verify only one door in the drywell air lock can be opened at a time.
24 months SR 3.6.5.2.4 Deleted SR 3.6.5.2.5 Verify, from an initial pressure of 18 months 75 psig, the drywell air lock seal pneumatic system pressure does not decay at a rate equivalent to > 0.67 psig for a period of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
l RIVER BEND 3.6-66 Amendment No. 81, 87
Drywell Isolatten Valves 3.6.5.3 3.6 CONTAINMENT SYSTEMS 3.6.5.3 Drywell Isolation Valves LCO 3.6.5.3 Each Drywell Isolation Valve shall be OPERABLE.
APPLICABILITY:
MODES I, 2, and 3.
ACTIONS
NOTES------------------------------------
1.
Penetration flow paths, except for the 24 inch purge valve penetration flow path, may be unisolated intermittently under administrative controls.
2.
Separate Condition entry is allowed for each penetration flow path.
3.
Enter applicable Conditions and Required Actions for systems made inoperable by Drywell Isolation Valves.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more A.1 Isolate the affected 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> penetration flow paths penetration flow path with one drywell by use of at least isolation valve one closed and inoperable.
de-activated automatic valve, closed manual valve, blind flange, or check valve with flow through the valve secured.
AND (continued)
RIVER BEND 3.6-67 Amendment No. 81, 87