Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20100F616 + (10:55:52, 13 December 2024)
- ML20100F613 + (10:55:53, 13 December 2024)
- ML20100F606 + (10:55:54, 13 December 2024)
- RBG-19484, Part 21/Deficiency Rept DR-259 Re Separation of Underwriter Safety Device Co Part 13549 Split Terminal Blocks.Initially Reported on 841019.Corrective Action Not Determined.Next Rept Will Be Provided by 850103 + (10:55:55, 13 December 2024)
- ML20100F603 + (10:55:56, 13 December 2024)
- ML20100F599 + (10:55:57, 13 December 2024)
- RBG-19481, Final Deficiency Rept DR-233 Re Potential Degradation of Epoxy Formulations,Including Devcon Plastic Steel,By Heat & Radiation.Devcon Adequate to Support Primary Shield Wall & Jet Impingement Wall Loads & Addl Bending Stresses + (10:55:57, 13 December 2024)
- ML20100F598 + (10:55:58, 13 December 2024)
- ML20100F592 + (10:55:59, 13 December 2024)
- ML20100F590 + (10:56:00, 13 December 2024)
- RBG-19495, Interim Deficiency Rept DR-190 Re Fill Pumps Supplied by Gould Pumps,Inc for Lpcs,Hpcs & RHR Sys.Next Rept Expected by 850131 + (10:56:01, 13 December 2024)
- ML20100F564 + (10:56:02, 13 December 2024)
- ML20100F560 + (10:56:03, 13 December 2024)
- ML20100F549 + (10:56:03, 13 December 2024)
- ML20100F545 + (10:56:04, 13 December 2024)
- 05000458/LER-1996-004, :on 960115,CI of Various BOP Valves Occurred Due to Inattention to Detail.I&C Technician Counseled + (10:56:06, 13 December 2024)
- ML20100F532 + (10:56:07, 13 December 2024)
- ML20100F531 + (10:56:08, 13 December 2024)
- ML20100F526 + (10:56:08, 13 December 2024)
- 05000255/LER-1984-015, :on 840804,loss of Electrohydraulic Control Fluid Pressure Resulted in Turbine Trip & Automatic Reactor Trip.Caused by Loose Fitting on Discharge Line Due to Personnel Error.Bracket Replaced + (10:56:10, 13 December 2024)
- RBG-19470, Interim Deficiency Rept DR-215 Re Uninterruptible Power Supply Inverters Supplied by Elgar Corp.Next Rept Will Be Submitted by 850123 + (10:56:11, 13 December 2024)
- ML20100F513 + (10:56:12, 13 December 2024)
- ML20100F512 + (10:56:13, 13 December 2024)
- ML20100F502 + (10:56:14, 13 December 2024)
- ML20100F501 + (10:56:14, 13 December 2024)
- ML20100F497 + (10:56:15, 13 December 2024)
- 05000247/LER-1984-017, :on 841021,reactor Trip Occurred During Turbine Generator Overspeed Test.Caused by Operator Using Wrong Gauge During Test.Facility Stabilized at Hot Shutdown Conditions + (10:56:17, 13 December 2024)
- 05000282/LER-1984-010-01, :on 841029,steam Generator Tube Leakage Occurred.Probably Caused by Intergranular Attack in Tubesheet Crevice Region.Leaking Tubes Plugged.Several Tubes Will Be Removed for Analysis + (10:56:19, 13 December 2024)
- 05000327/LER-1984-068, :on 841104,inadvertent Relay Actuation Caused Auxiliary Bldg Ventilation Isolation.Caused by Relay Not Fully Seated on Terminal Block.Relay Placed Back Into Correct Position.Isolation Reset + (10:56:21, 13 December 2024)
- ML20100F484 + (10:56:22, 13 December 2024)
- ML20100F485 + (10:56:22, 13 December 2024)
- ML20100F483 + (10:56:23, 13 December 2024)
- ML20100F480 + (10:56:24, 13 December 2024)
- ML20100F475 + (10:56:25, 13 December 2024)
- ML20100F474 + (10:56:25, 13 December 2024)
- ML20100F473 + (10:56:26, 13 December 2024)
- 05000327/LER-1984-055, :on 840817 & 20,during Work on Storage Facility for Plant Maint Insulators,Doors A028 & A029 Left Open. Caused by Personnel Failure to Realize Outer Door Part of Vital Area Boundary.Procedure Revised + (10:56:28, 13 December 2024)
- RBG-19468, Interim Deficiency Rept DR-203 Re Arc Strikes on Interior Surface of Seven of Eight Air Start Receiver Tanks on Standby Diesel Generators Supplied by Tdi.Next Rept Will Be Submitted by 841220 + (10:56:29, 13 December 2024)
- ML20100F467 + (10:56:30, 13 December 2024)
- ML20100F466 + (10:56:34, 13 December 2024)
- 05000247/LER-1984-016, :on 841016,during Rod Withdrawal at Conclusion of Maint Refueling Outage,Steam Generator Delta P Signal Tripped Reactor.Caused by Lifting of Safety Relief Valve on Secondary Side + (10:56:35, 13 December 2024)
- ML20100F456 + (10:56:37, 13 December 2024)
- ML20100F457 + (10:56:37, 13 December 2024)
- ML20100F455 + (10:56:39, 13 December 2024)
- 05000331/LER-1984-039, :on 841101,during Normal Operation,Reactor Water Cleanup Sys Isolated Due to Momentary Spurious Signal in Reactor Water Cleanup Isolation Logic.Cause Unknown.Sys Free of Valid Isolation Parameters + (10:56:40, 13 December 2024)
- 05000333/LER-1984-023, :on 841104,w/reactor at Approx 30% Power Following Outage,Reactor Trip Occurred Due to Reactor Vessel Low Water Level.Caused by Malfunctioning Condensate Bypass Flow Controller + (10:56:42, 13 December 2024)
- ML20100F444 + (10:56:44, 13 December 2024)
- BSEP-95-0668, Provides Results of Confirmatory Testing Response for NRC Bulletin 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode + (10:56:45, 13 December 2024)
- ML20100F440 + (10:56:45, 13 December 2024)
- ML20100F434 + (10:56:47, 13 December 2024)
- ML20100F432 + (10:56:48, 13 December 2024)