Interim Deficiency Rept DER 84-41 Re Adequacy of Cardinal Industrial Products Program for Supplier Qualification. Initially Reported on 840524.Due to Extensive Evaluation, Next Rept Delayed Until 841203
ML20100F513
Person / Time
Site: Palo Verde  
Issue date: 11/20/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-31190-TDS, DER-84-41, NUDOCS 8412060644
Download: ML20100F513 (2)


Text

,.

.v.

Arizona Nuclear Power Project P.O. box 52034 e PHOENIX, ARIZONA 85072-2034 November 20, 1984 ANPP-31190-TDS/LBS U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects

Subject:

Time Extension For Report - DER 84-41 A 50.55(e) Potentially Reportable Deficiency Relating To Adequacy of Cardinal Industrial Products Program For Supplier Qualification.

File:

84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between P. Narbut and T. Bradish on May 24, 1984 (B) ANPP-29809, dated June 22,1984 (Interim Report)

(C) ANPP-30410, dated August 31, 1984 (Time Extension)

(D) ANPP-30591, dated September 20, 1984 (Interim Report)

(E) Telephone conversation between L. Miller and W. E. Ide on l

l November 2, 1984 (F) ANPP-31083, dated November 7,1984 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), Interim Reports were transmitted by References (B) and (D), and Time Extensions were requestod by References (C) and (F).

Reference (F) estimated that a Final Report would be available by November 21, 1984.

The overall results of the PVNGS review of this matter and associated testing programs were presented to the NRC on November 13, 1984.

However, due to the extensive Materials testing performed, final review of test data is taking longer than originally expected. It is now expected that this information will be finalized by December 3, 1984.

Very truly r e.,

QkAM 8412060644 841120 E. E. Van Brunt, Jr.

PDR ADOCK 05000528 APS Vice President S

PDR Nuclear Production ANPP Project Director EEVB/LBS/nj cc: See Page Two t

1 0 f6J/

gp :,

^

, : -3 j

t

~

w.

fMr. D. F. Kirsch

DER 84-41 Page.Two

-cc:*

Richard.DeYoung, Director.

Office of Inspection and Enforcement

~

U. S. Nuclear. Regulatory Commission

~ Washington,- D. C.

20555

. T. G. Wo'ods, Jr.

D. B. Karner :

W. E. Ide-D. B. Fasnacht-A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo lB.' S Kaplan J. R. Bynum

- J. - M. Allen D.:Canady A. C. Gehr W. ~ J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson R. P. Zimmerman M. L. Clyde M. Woods T. J. Bloom Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339 5