Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000289/LER-1984-004-03, :on 830602,discovered Tube A-134-74 Mistakenly Plugged in June 1983 While Tube A-135-72 Left Unplugged. Complete Photographic Reverification of All Plugged Tubes Performed + (10:55:30, 13 December 2024)
- 05000528/LER-1985-013, :on 850223,Train B Diesel Generator Started Inadvertently During Routine Surveillance Testing.Caused by Error in Surveillance Procedure for Testing Certain Subgroup Relay Contacts.Change Notice Issued + (10:55:32, 13 December 2024)
- ML20100F673 + (10:55:33, 13 December 2024)
- 05000289/LER-1984-004, Forwards Corrected LER 84-004-00 Re Misplugged Steam Generator Tubes.Rept Date Corrected & Licensee Contact Changed + (10:55:34, 13 December 2024)
- ML20100F664 + (10:55:34, 13 December 2024)
- 05000339/LER-1984-010-01, :on 841101,accumulator Isolation Valves a & B Inadvertently Opened When Breakers Energized.Caused by Solid Protection Sys Slave Relay in Deenergized State.Relay Actuated Into Correct Position + (10:55:36, 13 December 2024)
- ML20100F652 + (10:55:37, 13 December 2024)
- RBG-19523, Final Part 21/deficiency Rept Re Thread Leakage in Rosemount Inc 1153 Series Pressure Transmitters.Initially Reported on 841026.New Procedure Recently Developed by Rosemount to Ensure Proper Curing of Neolube 100 Thread Sealant + (10:55:38, 13 December 2024)
- 05000454/LER-1985-024, :on 850301,turbine/reactor Trip Occurred.Caused by Inability of Turbine electro-hydraulic Controller to Properly Position Governor Valves to Pick Up Generator Load. Load Vs Valve Position Curve Revised + (10:55:39, 13 December 2024)
- ML20100F635 + (10:55:42, 13 December 2024)
- ML20100F632 + (10:55:44, 13 December 2024)
- ML20100F620 + (10:55:50, 13 December 2024)
- ML20100F621 + (10:55:50, 13 December 2024)
- RBG-19483, Final Deficiency Rept DR-253 Re Limit Switch Compartment Covers on Limitorque SMB-000 Valve Operators.Initially Reported on 841016.Matl to Be Removed from Cover Internal Flanges to Allow Increase in Opening Size + (10:55:51, 13 December 2024)
- ML20100F616 + (10:55:52, 13 December 2024)
- ML20100F613 + (10:55:53, 13 December 2024)
- ML20100F606 + (10:55:54, 13 December 2024)
- RBG-19484, Part 21/Deficiency Rept DR-259 Re Separation of Underwriter Safety Device Co Part 13549 Split Terminal Blocks.Initially Reported on 841019.Corrective Action Not Determined.Next Rept Will Be Provided by 850103 + (10:55:55, 13 December 2024)
- ML20100F603 + (10:55:56, 13 December 2024)
- ML20100F599 + (10:55:57, 13 December 2024)
- RBG-19481, Final Deficiency Rept DR-233 Re Potential Degradation of Epoxy Formulations,Including Devcon Plastic Steel,By Heat & Radiation.Devcon Adequate to Support Primary Shield Wall & Jet Impingement Wall Loads & Addl Bending Stresses + (10:55:57, 13 December 2024)
- ML20100F598 + (10:55:58, 13 December 2024)
- ML20100F592 + (10:55:59, 13 December 2024)
- ML20100F590 + (10:56:00, 13 December 2024)
- RBG-19495, Interim Deficiency Rept DR-190 Re Fill Pumps Supplied by Gould Pumps,Inc for Lpcs,Hpcs & RHR Sys.Next Rept Expected by 850131 + (10:56:01, 13 December 2024)
- ML20100F564 + (10:56:02, 13 December 2024)
- ML20100F560 + (10:56:03, 13 December 2024)
- ML20100F549 + (10:56:03, 13 December 2024)
- ML20100F545 + (10:56:04, 13 December 2024)
- 05000458/LER-1996-004, :on 960115,CI of Various BOP Valves Occurred Due to Inattention to Detail.I&C Technician Counseled + (10:56:06, 13 December 2024)
- ML20100F532 + (10:56:07, 13 December 2024)
- ML20100F531 + (10:56:08, 13 December 2024)
- ML20100F526 + (10:56:08, 13 December 2024)
- 05000255/LER-1984-015, :on 840804,loss of Electrohydraulic Control Fluid Pressure Resulted in Turbine Trip & Automatic Reactor Trip.Caused by Loose Fitting on Discharge Line Due to Personnel Error.Bracket Replaced + (10:56:10, 13 December 2024)
- RBG-19470, Interim Deficiency Rept DR-215 Re Uninterruptible Power Supply Inverters Supplied by Elgar Corp.Next Rept Will Be Submitted by 850123 + (10:56:11, 13 December 2024)
- ML20100F513 + (10:56:12, 13 December 2024)
- ML20100F512 + (10:56:13, 13 December 2024)
- ML20100F502 + (10:56:14, 13 December 2024)
- ML20100F501 + (10:56:14, 13 December 2024)
- ML20100F497 + (10:56:15, 13 December 2024)
- 05000247/LER-1984-017, :on 841021,reactor Trip Occurred During Turbine Generator Overspeed Test.Caused by Operator Using Wrong Gauge During Test.Facility Stabilized at Hot Shutdown Conditions + (10:56:17, 13 December 2024)
- 05000282/LER-1984-010-01, :on 841029,steam Generator Tube Leakage Occurred.Probably Caused by Intergranular Attack in Tubesheet Crevice Region.Leaking Tubes Plugged.Several Tubes Will Be Removed for Analysis + (10:56:19, 13 December 2024)
- 05000327/LER-1984-068, :on 841104,inadvertent Relay Actuation Caused Auxiliary Bldg Ventilation Isolation.Caused by Relay Not Fully Seated on Terminal Block.Relay Placed Back Into Correct Position.Isolation Reset + (10:56:21, 13 December 2024)
- ML20100F484 + (10:56:22, 13 December 2024)
- ML20100F485 + (10:56:22, 13 December 2024)
- ML20100F483 + (10:56:23, 13 December 2024)
- ML20100F480 + (10:56:24, 13 December 2024)
- ML20100F475 + (10:56:25, 13 December 2024)
- ML20100F474 + (10:56:25, 13 December 2024)
- ML20100F473 + (10:56:26, 13 December 2024)
- 05000327/LER-1984-055, :on 840817 & 20,during Work on Storage Facility for Plant Maint Insulators,Doors A028 & A029 Left Open. Caused by Personnel Failure to Realize Outer Door Part of Vital Area Boundary.Procedure Revised + (10:56:28, 13 December 2024)