Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20101S518 + (09:01:03, 13 December 2024)
- ML20101S512 + (09:01:03, 13 December 2024)
- 2CAN018502, Application for Amend to License NPF-6,clarifying Intent of Tech Spec 4.6.2.2.e Re Sodium Hydroxide Addition Sys.Fee Paid + (09:01:04, 13 December 2024)
- B11422, Forwards Responses to Power Sys Branch 840802 Mechanical Series SER (NUREG-1031) Open Item 2.6,Confirmatory Items 56 & 57 & License Conditions 4,5,6 & 7 + (09:01:05, 13 December 2024)
- ML20101S507 + (09:01:06, 13 December 2024)
- ML20101S504 + (09:01:08, 13 December 2024)
- ML20101S499 + (09:01:09, 13 December 2024)
- ML20101S491 + (09:01:10, 13 December 2024)
- ML20101S493 + (09:01:10, 13 December 2024)
- ML20101S490 + (09:01:11, 13 December 2024)
- ML20101S487 + (09:01:12, 13 December 2024)
- SNRC-1141, Responds to NRC Re Violations Noted in Insp Rept 50-322/84-46.Corrective Actions:Draft Rept Re Engineering Review of Fire Detectors for Compliance W/Nfpa 72D/E Issued. Hourly Fire Watch Patrols Instituted + (09:01:13, 13 December 2024)
- ML20101S480 + (09:01:14, 13 December 2024)
- 05000219/LER-1992-008, :on 920608,one Isolation Condenser Became Inoperable Requiring TS Required Shutdown.Caused by Packing Leak on V-14-33 Attributed to Scored Stem.Stem Stoned & Smoothed & Valve Repacked & Returned to Svc + (09:01:15, 13 December 2024)
- ML20101S471 + (09:01:17, 13 December 2024)
- ML20101S473 + (09:01:17, 13 December 2024)
- 05000338/LER-1984-019, :on 841114,trip from 100% Power Occurred Due to Vital Bus Inverter Failure.Inverter Was Supplying Power to 125-volt Ac Vital Bus 1-III.Caused by Deenergization of Bus & Associated Equipment + (09:01:19, 13 December 2024)
- ML20101S464 + (09:01:20, 13 December 2024)
- ML20101S462 + (09:01:21, 13 December 2024)
- ML20101S455 + (09:01:26, 13 December 2024)
- ML20101S457 + (09:01:26, 13 December 2024)
- ML20101S454 + (09:01:27, 13 December 2024)
- ML20101S450 + (09:01:28, 13 December 2024)
- ML20101S452 + (09:01:28, 13 December 2024)
- ML20101S449 + (09:01:29, 13 December 2024)
- ML20101S445 + (09:01:30, 13 December 2024)
- ML20101S439 + (09:01:31, 13 December 2024)
- ML20101S438 + (09:01:32, 13 December 2024)
- ML20101S436 + (09:01:33, 13 December 2024)
- ML20101S430 + (09:01:34, 13 December 2024)
- U-602008, Monthly Operating Rept for June 1992 for Clinton Power Station Unit 1 + (09:01:34, 13 December 2024)
- ML20101S413 + (09:01:39, 13 December 2024)
- ML20101S406 + (09:01:40, 13 December 2024)
- ML20101S386 + (09:01:41, 13 December 2024)
- ML20101S377 + (09:01:42, 13 December 2024)
- ML20101S360 + (09:01:47, 13 December 2024)
- ML20101S356 + (09:01:49, 13 December 2024)
- ML20101S352 + (09:01:50, 13 December 2024)
- 3F0792-02, Forwards 15-day Rept of Eddy Current Insp of once-through SG Tubes on 920629 + (09:01:51, 13 December 2024)
- ML20101S346 + (09:01:52, 13 December 2024)
- ML20101S338 + (09:01:54, 13 December 2024)
- ML20101S345 + (09:01:54, 13 December 2024)
- ML20101S331 + (09:01:55, 13 December 2024)
- ML20101S323 + (09:01:56, 13 December 2024)
- ML20101S308 + (09:01:57, 13 December 2024)
- ML20101S291 + (09:01:58, 13 December 2024)
- ML20101S306 + (09:01:58, 13 December 2024)
- ML20101S286 + (09:02:02, 13 December 2024)
- ML20101S273 + (09:02:03, 13 December 2024)
- ML20101S263 + (09:02:04, 13 December 2024)
- ML20101S262 + (09:02:05, 13 December 2024)