ML20101S331
| ML20101S331 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 07/13/1992 |
| From: | Parker T NORTHERN STATES POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20101S332 | List: |
| References | |
| NUDOCS 9207170050 | |
| Download: ML20101S331 (2) | |
Text
j o
- .=
Northem States Power Company 414 Nicollet Malt Minneapohs, Minnesota 55401 1927 Telephone (612) - 45500 July 13,-1992 10 CPR Part 50
.j Section 50.90 U S Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License-Nos. DPR-42 50-306 DPR 60 License Amendment Request Dated July 13, 1992 l
Refueling and Fuel Handling Specification Changes Attached is a request for a change to the Technical Specifications, Appendix A of the Operating Licenses, for the Prairie Island Nuclear Generating Plant.
This. request is submitted in accordance with the provisions of 10 CFR Part 50, Section 50.90.
This license amendment r quest proposes changes to Prairie Island Technical Specification Section 3.8 intended to clarify the applicability of the j
requirements for containment closure during refueling.
4 This license amendment request also proposes changes to Prairie Island
. Technical Specification Sections 3.8 and 4.1 which will clarify the requirements for operability and load testing of the fuel handling cranes.
Exhibit A contains a description of the proposed changes, the reasons for requesting the changes and the supporting safety evaluation /significant hazards determination.
Exhibit B contains current Prairie Island Technical l
Specification pages marked up to show the proposed changes.
Exhibit C contains the revised Technical Specification pages.
Due to the. complexity.of the two unit outage scheduled for the Fall of 1992,
'we; request that, if possible, the proposed changes be approved prior to October 15,;1992. The proposed cht;iges will significantly reduce the
. administrative burden prior to and during this fall's refueling activities and will clarify.the fuel handling crane testing requirements, t
1 G G (. C i3
.~ \\
\\
9207170050 920713
~jDR ADOCK 05000292 I
q PDR
g-D j
5
^
"*""Y
.USNRC July 13, 1992 Page 2-Please' contact us if-you have any q-tions related to this License Amendment
- Request, r
l-V
. Thomas M Parker-
. Manager.
- Nuclear Support Services q.;
c: Regional Administrator-III, NRC NRR-Project-Manager, NRC.
~ Senior Resident Inspector, NRC
. State of Minnesota Attn: Kris-Sanda
-J-E Silberg l Attachments:
Affidavit Exhibit A ' Evaluation of Proposed' Changes to the Technical Specifications Exhibit B - Proposed Changes Marked Up on Existing Technical Specification
- Pagese Exhibit C LRev'ised Technical Specification Pages-n
'\\ i:
'= t' 3
- A\\f,..