Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 0CAN099204, Advises That Appropriate Procedures Modified or Verified to Reflect NRC Position on cross-tying of Vital Buses,Per Generic Ltr 91-11, Resolution of GI 48 & 49, as Followup to Util 920205 Response to GL + (08:28:21, 13 December 2024)
- ML20104B946 + (08:28:22, 13 December 2024)
- 2CAN099205, Clarifies 920709 & 22 Applications for Amend to License NPF-6,changing TS to Revise Containment Parameter Limits & Pressurizer Pressure,Per 920903 Telcon W/Nrc + (08:28:23, 13 December 2024)
- ML20104B937 + (08:28:24, 13 December 2024)
- ML20104B925 + (08:28:25, 13 December 2024)
- SNRC-1138, Forwards Resumes of New on-shift Advisors Currently Undergoing Training & Testing,Per Sser 8.NRC Invited to Observe Oral & Written Exams + (08:28:26, 13 December 2024)
- ML20104B924 + (08:28:26, 13 December 2024)
- 2CAN099206, Forwards Proprietary Rev 0 to Procedure 00000-ESE-826, Procedure for Qualificaion of Roll Transition Zone (Rtz) Sleeve Rolled Joint Rev 0 to Test Rept TR-ESE-887, Test Rept for Qualification of Rtz Sleeve.... Encls Withheld + (08:28:27, 13 December 2024)
- AECM-85-0030, Forwards Addl Info Requested During 841206 Telcon Re Design & Operation of Automatic Depressurization Sys (ADS) Accumulators & Related Air sys.Long-term ADS Pneumatic Supply Makeup Connection Located in Auxiliary Bldg + (08:28:28, 13 December 2024)
- 0CAN099207, Forwards Rev 25 to Industrial Security Plan.Rev Withheld (Ref 10CFR73.21) + (08:28:29, 13 December 2024)
- ML20104B903 + (08:28:30, 13 December 2024)
- ST-HL-AE-1172, Interim Deficiency Rept Re Inadequate Flood Protection of Category I Structures.Initially Reported on 841220.Check Valves Provided on Backflow Prevention Devices & Watertight Doors Installed in Mechanical Electrical Auxiliary Bldg + (08:28:30, 13 December 2024)
- LD-92-095, Draft Sys 80+ Design Certification Piping Analysis Specification + (08:28:31, 13 December 2024)
- ML20104B892 + (08:28:32, 13 December 2024)
- ML20104B895 + (08:28:32, 13 December 2024)
- 05000249/LER-1984-012, :on 840823,unit Scrammed Due to Operator Failure to Insert Intermediate Range Monitors Prior to APRMs Going Downscale.Caused by Operator Lack of Experience.Shift Mgt Reminded to Review Procedures + (08:28:39, 13 December 2024)
- W3P85-0194, Forwards Update to .Mode 4 Achieved on 850123. Delay of 10 Days Expected in Achieving Mode 3 + (08:28:40, 13 December 2024)
- ML20104B859 + (08:28:41, 13 December 2024)
- ML20104B856 + (08:28:42, 13 December 2024)
- ML20104B853 + (08:28:43, 13 December 2024)
- ML20104B826 + (08:28:44, 13 December 2024)
- ML20104B823 + (08:28:45, 13 December 2024)
- ML20104B818 + (08:28:46, 13 December 2024)
- TMI-20-012, Island Nuclear Station, Unit 1 - Submittal of Changes to Technical Specifications Bases + (08:28:47, 13 December 2024)
- ML20104B806 + (08:28:48, 13 December 2024)
- ML20104B804 + (08:28:49, 13 December 2024)
- ML20104B796 + (08:28:50, 13 December 2024)
- ML20104B797 + (08:28:50, 13 December 2024)
- ML20104B789 + (08:28:56, 13 December 2024)
- DCL-92-197, Forwards Rev 18 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) + (08:28:57, 13 December 2024)
- ML20104B765 + (08:28:58, 13 December 2024)
- ML20104B770 + (08:28:58, 13 December 2024)
- ML20104B733 + (08:29:05, 13 December 2024)
- ML20104B759 + (08:29:05, 13 December 2024)
- ML20104B730 + (08:29:06, 13 December 2024)
- AECM-85-0033, Application for Amend to License NPF-29,revising Tech Specs to Reflect QA Reorganization + (08:29:07, 13 December 2024)
- RBG-19913, Final Deficiency Rept DR-236 Re Gouges & Linear Indications on Piston Wrist Pins in Tdi Standby Diesel Generator.Wrist Pins Replaced.Condition Not Reportable Per 10CFR50.55(e) + (08:29:07, 13 December 2024)
- RBG-19940, Final Deficiency Rept DR-216 Re Electrical Penetrations Supplied by Conax Corp.Initially Reported on 840919. Penetration Assemblies to Be Returned to Vendor for Rework + (08:29:08, 13 December 2024)
- ML20104B698 + (08:29:09, 13 December 2024)
- ML20104B693 + (08:29:15, 13 December 2024)
- ML20104B683 + (08:29:16, 13 December 2024)
- ML20104B669 + (08:29:16, 13 December 2024)
- ML20104B668 + (08:29:17, 13 December 2024)
- 05000366/LER-1984-038, :on 841224,drywell Floor Drain Sump Pumps Failed & Water from Drywell Floor Drain Sumps Overflowed Into Equipment Drain Sump.Caused by Broken Drive Couplings on Each Pump.Pump Couplings Replaced + (08:29:24, 13 December 2024)
- ML20104B615 + (08:29:25, 13 December 2024)
- ML20104B610 + (08:29:26, 13 December 2024)
- ML20104B608 + (08:29:26, 13 December 2024)
- ML20104B601 + (08:29:27, 13 December 2024)
- B14236, Forwards Relief Request from ASME Boiler & Pressure Vessel Code Section XI Requirements,In Response to GL 90-05,to Make Interim Repairs to Leak in Piping as Alternative to IWA-7000 repair/IWA-7000 Replacement + (08:29:28, 13 December 2024)
- ML20104B585 + (08:29:29, 13 December 2024)
- ML20104B578 + (08:29:30, 13 December 2024)
- ML20104B559 + (08:29:39, 13 December 2024)