0CAN099207, Forwards Rev 25 to Industrial Security Plan.Rev Withheld (Ref 10CFR73.21)

From kanterella
Jump to navigation Jump to search
Forwards Rev 25 to Industrial Security Plan.Rev Withheld (Ref 10CFR73.21)
ML20104B908
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 09/11/1992
From: James Fisicaro
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
0CAN099207, CAN99207, NUDOCS 9209160324
Download: ML20104B908 (3)


Text

"'"" o a "= " " ' '"c -

.r=, Ent:rgy Operations September 11, 1992 Q.i "l f' [ ] 4 d."'j [* e.d)

A u.

m. c J.

OCAN099207 1 6 s,,' ' *

  • ' N q ',' f)%

i b i h. ' ' d l. l a U d

0. S. Nuclear Regulatory Commission Document Ccntrul Desk Mall Statfon PI-137 Washington, DC 20555

Subject:

Arkansas Nuclear One - Units I nrul 2 Docket Nos. 50-313 t, 50-368 License Nos. DPR-51 6 NPT-6 Changes to the ANO Industrial Security Plan, Revision 25 s

ATT ACFil::h? C01r7A3 e e m, gap;; I;;yaI#u ;( -

Gentl men:

t h r' r,y P A R A " ; ; N '; li; L J A '., L 1 " Di'cc:i: P O!.129 In acco-dance wit h 10CFR50.4, attached is the original plus three (3) copien (Copy Nos..

1-4) of Revirif on 25 to t he Arkansas Nuclear One (ANO)

Indust rial Security Plan (ISP).

Copf er 5 and 6 are being submit ted to NRC Region IV.

A brief description of the changes made in this revision is included as Att achment I and the spacific changes to the ISP are shown in Attachment 2.

In accordante with 10CFR50.54(p), it was determined by Entergy Operations that these changes do not decrease the sn feguards ef f ect iveness of the plan and, therefore, may be implemented wIthout prfor NRC approva1.

The attached material describes current and proposed security measures; therefore, Ent ergy Operat ions hns det ermined that the nttached documentation contnins safeguards information ns specified by 10CFR73.21.

The attached documentation should therefore be handled approprintely.

Very truly yours,

}ng ns-m,n

James J. Fisicaro Director, 1,1 censing ALLachments

?n INFO!iMA?!0N

~no w.

y 6B l/.

JSf"1SSEA $$0h3 F

SAFEGOAROS INc0RMA30%

cc:

Mr. James L. M11hoan U. S. Nuclear Regulatory Commission Region IV 61't Ryan Plaza Drive, Suite 1000 Arli..-ton TX 76011-8064 w/o att:

NRC Senior Resident Inspector Arkansas Nuclear One - ANO-1 & 2 Number 1, Nuclear Plant Road Russellville, AR 72801 Mr. Thomas W. Alexion NRR ProjectLManager, Region IV/ANO-1 U. S. Nuclear Regulatory Commission NRP Mail Stop 11-3 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 Ms.- Sheri R. Peterson NRR Project Manager, Region IV/ANO-2 U. S, Nuclear Regulatory Commission NRR Mail Stop 13-11-3 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 l

1.TTACHi.!E';T COHT. SINS SAFIGUARDS I!! FORM AT!GN t?O.9 SEPAi:ATION THIS PAGE IS DEC03 TROLLED i

i i

l SAFEGUARDS WO3 MAT;0N

q hh

SAFEGUARDS INFORMATION

_ h

WARNING
This' document contains Safeguards Information. Unauthorized

'isclosure is prohibited-per Section 147 of the Atomic Energy Act of 1954

-and 10CFR73.21. Violations are subject to civil and crfminal sanctions.

Copy Number:

i Reviewed by:

d m a 1 F~l.sie n eo -

- IEL. $4.,

(Naro)

[/

(57gnature)

Y- //- N1

-Entergy Operations.

.(Organization)

(Date) a.

-..,,. w,=. w-, =,; p,; - m a

f.' ~ 1.u.

33 m-1 i..

~8ARGUARDS L

N:0RMAT10N u-

..,. -,