Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PY-CEI-NRR-1555, Responds to NRC Bulletin 92-001,Suppl 1, Failure of Thermo-Lag 330 Fire Barrier Sys to Perform Specified Fire Endurance Function. Hourly Fire Watches Established & Operable Fire Detection Sys Installed for Affected Areas + (08:06:06, 13 December 2024)
- ML20106C930 + (08:06:06, 13 December 2024)
- ML20106C917 + (08:06:07, 13 December 2024)
- 05000443/LER-1992-015, :on 920902,during Walkdown for IPE for External Events,Discovered That Scupper in Svc Water Pumphouse Roof Parapet Not Covered by Roofing Matl.Cause Indeterminate. Roofing Matl Covering Scuppers Removed + (08:06:09, 13 December 2024)
- ML20106C913 + (08:06:10, 13 December 2024)
- ML20106C908 + (08:06:11, 13 December 2024)
- ML20106C907 + (08:06:12, 13 December 2024)
- ML20106C903 + (08:06:12, 13 December 2024)
- 0CAN099208, Application for Amends to Licenses DRP-51 & NPF-6,changing TS to Add LCO & SR for Main Steam Line Radiation Monitors, Per GL 83-37 + (08:06:13, 13 December 2024)
- BECO-92-114, Discusses Measures to Enhance Util Efforts to Address IPE for Severe Accident Vulnerabilities,Per GL 88-20.Results of IPE Confirm Absence of Any plant-unique Vulnerabilities to Severe Accidents at Facility + (08:06:14, 13 December 2024)
- 3F1092-02, Responds to NRC Re Violations & Deviations Noted in Insp Rept 50-302/92-15.Corrective Actions:Erroneous Emergency Response Telephone Extension Number Removed from Emergency Response Notification + (08:06:14, 13 December 2024)
- ML20106C862 + (08:06:16, 13 December 2024)
- ML20106C867 + (08:06:16, 13 December 2024)
- ML20106C855 + (08:06:17, 13 December 2024)
- ML20106C854 + (08:06:17, 13 December 2024)
- TAC:52178 + (08:06:18, 13 December 2024)
- ML20106C849 + (08:06:20, 13 December 2024)
- ML20106C841 + (08:06:21, 13 December 2024)
- ML20106C836 + (08:06:22, 13 December 2024)
- ML20106C832 + (08:06:23, 13 December 2024)
- ST-HL-AE-4222, Application for Amends to Licenses NPF-76 & NPF-80,changing TS 3.1.1.1 to Remove Variable Shutdown Margin Requirements for Modes 1 & 2 & Reflect That Reactivity Balance Can Only Be Performed When Reactor Critical + (08:06:24, 13 December 2024)
- ML20106C825 + (08:06:24, 13 December 2024)
- ML20106C819 + (08:06:25, 13 December 2024)
- JPN-92-060, Forwards Application for Amend to License DPR-59,revising Tech Spec Flow Requirement for Core Spray Pumps & Associated Bases + (08:06:26, 13 December 2024)
- ML20106C817 + (08:06:26, 13 December 2024)
- 05000301/LER-1992-002-01, :on 920828,discovered That CCW Sys Isolation Valves LW-63 & 64 Not Capable of Performing Intended Function.Caused by Inadequate Design Review.Ccw Sys Boundary Outside Containment Reestablished + (08:06:28, 13 December 2024)
- ML20106C809 + (08:06:29, 13 December 2024)
- ML20106C805 + (08:06:30, 13 December 2024)
- ML20106C803 + (08:06:31, 13 December 2024)
- ML20106C802 + (08:06:32, 13 December 2024)
- JPN-92-057, Forwards Application for Amend to License DPR-59,adding Operability & SR to TS Tables 3.12.1 & 4.12.1 to Reflect Plant Mod to Improve Fire Protection by Installing Automatic Fire Suppression Sys in Battery Room Corridor + (08:06:33, 13 December 2024)
- ML20106C793 + (08:06:34, 13 December 2024)
- ML20106C790 + (08:06:35, 13 December 2024)
- ML20106C775 + (08:06:35, 13 December 2024)
- ML20106C768 + (08:06:36, 13 December 2024)
- ML20106C761 + (08:06:37, 13 December 2024)
- PLA-3858, Forwards Revs to Emergency Response Data Point Library, Submitted Via .Data Revised Contained in Shaded Fields + (08:06:37, 13 December 2024)
- ML20106C754 + (08:06:38, 13 December 2024)
- ML20106C751 + (08:06:39, 13 December 2024)
- ST-HL-AE-1140, Revised Final Deficiency Rept Re Design of RHR Sys.Initially Reported on 820326.Re-evaluation Demonstrates That Use of Atmospheric Head Tank Inside of Reactor Containment Bldg Better Design Solution.Revised Design Drawing Encl + (08:06:39, 13 December 2024)
- JPN-92-055, Forwards Application for Amend to License DPR-59,revising Table 3.2-1, Instrumentation That Initiates Primary Containment Isolation to Reflect Installation of Addl Temp Elements in RWCU Pump Suction Primary Containment + (08:06:40, 13 December 2024)
- ML20106C745 + (08:06:41, 13 December 2024)
- ML20106C727 + (08:06:41, 13 December 2024)
- RBG-37523, Provides Response to Generic Ltr 92-04, Resolution of Issues Related to Recator Vessel Water Level Instrumentation in BWRs Pursuant to 10CFR50.54(f) + (08:06:42, 13 December 2024)
- ELV-04037, NPDES Noncompliance Notification:On 920914,water Discharged from Cooling Tower Basin Via Storm Drain to Retention Pond 1 & Alarm Received in Control Room.Caused by out-of-calibr Level Transmitter.Level Transmitter Will Be Repaired + (08:06:44, 13 December 2024)
- ML20106C715 + (08:06:44, 13 December 2024)
- ML20106C700 + (08:06:45, 13 December 2024)
- JPN-92-061, Provides Response to Generic Ltr 92-04, BWR Reactor Vessel Water Level Instrumentation Issues. Licensee Making Mods to Correct Instrument Line Slopes Prior to Plant start-up as Detailed in Attachment to Ltr + (08:06:46, 13 December 2024)
- ML20106C697 + (08:06:46, 13 December 2024)
- ML20106C694 + (08:06:47, 13 December 2024)
- ML20106C688 + (08:06:48, 13 December 2024)