Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20106E273 + (08:00:57, 13 December 2024)
- ML20106E258 + (08:00:58, 13 December 2024)
- ML20106E267 + (08:00:58, 13 December 2024)
- ML20106E254 + (08:00:59, 13 December 2024)
- ML20106E253 + (08:01:00, 13 December 2024)
- W3P84-2792, Forwards MSS-NA3-P (Proprietary) & MSS-NA3 (Nonproprietary), Verification of Cecor Coefficient Methodology for Application to PWRs of Middle South Utils Sys. Proprietary Version Withheld (Ref 10CFR2.790) + (08:01:01, 13 December 2024)
- 05000413/LER-1984-012-02, :on 840908,differential Pressure at Full Flow Acceptance Criteria for RHR Nd Pump La Not Met & Pump Erroneously Declared Operable.Error Discovered on 840917. Caused by Personnel Error + (08:01:03, 13 December 2024)
- ML20106E248 + (08:01:04, 13 December 2024)
- ML20106E246 + (08:01:05, 13 December 2024)
- 05000483/LER-1984-040, :on 840915,feedwater Isolation Occurred Due to High Level Signals Received from Two Steam Generator Level Indicators.On 841010,reactor Trip,Feedwater Isolation & Auxiliary Feedwater Actuation Occurred + (08:01:06, 13 December 2024)
- ML20106E241 + (08:01:07, 13 December 2024)
- ML20106E236 + (08:01:08, 13 December 2024)
- ML20106E230 + (08:01:09, 13 December 2024)
- ML20106E224 + (08:01:10, 13 December 2024)
- ML20106E226 + (08:01:10, 13 December 2024)
- ML20106E220 + (08:01:11, 13 December 2024)
- NG-92-4959, Responds to GL 92-06,operating Licensing National Schedule Which Provides Updated Estimates of Number of Candidates for Operating Licensing Examinations in 1993-1996 + (08:01:12, 13 December 2024)
- RBG-19161, Interim Deficiency Rept DR-164 Re Intermixed Electrodes.Next Rept Expected by 841106 + (08:01:12, 13 December 2024)
- ML20106E212 + (08:01:13, 13 December 2024)
- ML20106E208 + (08:01:15, 13 December 2024)
- ML20106E211 + (08:01:15, 13 December 2024)
- ML20106E206 + (08:01:16, 13 December 2024)
- ML20106E201 + (08:01:17, 13 December 2024)
- ML20106E197 + (08:01:17, 13 December 2024)
- RBG-37-658, Responds to NRC Re Violations Noted in Insp Rept 50-458/90-02 on 900122-26.Corrective Actions:Two Procedures Have Been Prepared to Enable Recovery from Multiple High Impedance Faults Resulting from Fire + (08:01:18, 13 December 2024)
- ML20106E195 + (08:01:19, 13 December 2024)
- ML20106E189 + (08:01:20, 13 December 2024)
- ML20106E190 + (08:01:20, 13 December 2024)
- ML20106E188 + (08:01:21, 13 December 2024)
- NRC-92-0122, Forwards Rev 0 to Core Operating Limits Rept,Cycle 4. COLR Will Be Implemented for Use During Fourth Operating Cycle, Scheduled to Begin in Nov 1992 + (08:01:22, 13 December 2024)
- ML20106E183 + (08:01:22, 13 December 2024)
- ML20106E182 + (08:01:23, 13 December 2024)
- ML20106E181 + (08:01:24, 13 December 2024)
- 05000366/LER-1984-021, :on 840921,unit Received Reactor Scram Due to Incomplete Opening of Msiv.Caused by Nitrogen Leak on Pneumatic Sys Solenoid Valve for Inboard MSIV 2B21-F022D. Blown Gasket Replaced + (08:01:26, 13 December 2024)
- ML20106E178 + (08:01:27, 13 December 2024)
- BECO-92-126, Application for Amend to License DPR-35,revising TS Sections 1.0,4.3,4.4,4.5,4.6,4.7 & Associated Bases to Conform SRs for ASME Code Class 1,2 & 3 Pumps & Valves to IST Program, Per 10CFR50.55a(g)(5)(ii) + (08:01:28, 13 December 2024)
- ML20106E168 + (08:01:29, 13 December 2024)
- ML20106E169 + (08:01:29, 13 December 2024)
- ML20106E161 + (08:01:30, 13 December 2024)
- 05000346/LER-1984-013-01, :on 840911,anticipatory Reactor Trip Sys Tripped Reactor in Response to Turbine Trip.Caused by Inadvertent Activation of Moisture Separator Reheater High Water Level Switch.Plant Cooldown Initiated + (08:01:34, 13 December 2024)
- ML20106E153 + (08:01:35, 13 December 2024)
- ML20106E146 + (08:01:36, 13 December 2024)
- TXX-4332, Interim Deficiency Rept SDAR-146 Re Design of Primary Coolant Component Water Sys.Initially Reported on 840924. Evaluation Continuing.Completion Expected by 841106 + (08:01:36, 13 December 2024)
- ML20106E138 + (08:01:37, 13 December 2024)
- TXX-4336, Interim Deficiency Rept SDAR-156 Re Safety Class of Instrument Lines W/Piping Downstream of Root Valve.Initially Reported on 840918.Evaluation Continuing.Completion Expected by 841127 + (08:01:38, 13 December 2024)
- ML20106E137 + (08:01:38, 13 December 2024)
- ML20106E123 + (08:01:40, 13 December 2024)
- NRC-85-2994, Forwards Proprietary & Nonproprietary Amend 1 to Wapwr RESAR-SP/90 Pda Module 3, Introduction & Site, Per 840912 Request for Addl Info.Proprietary Version Withheld (Ref 10CFR2.790) + (08:01:41, 13 December 2024)
- 05000366/LER-1984-019, :on 840924,outboard Reactor Water Cleanup Sys (RWCU) Primary Containment Isolation Valve 2G31-F004 Closed & RWCU Pump 2G31-C001A Tripped.Caused by Failure of Two ATTS Master Trip Units.New Units Installed + (08:01:43, 13 December 2024)
- 05000318/LER-1992-007, :on 920929,Calvert Cliffs Unit 2 Manually Tripped Due to High Temps on Main Turbine Rear Thrust Bearing Faces.Caused by 23 Moisture Separator/Reheater Relief Valves Stuck Open.Valves Repaired + (08:01:45, 13 December 2024)
- ML20106E119 + (08:01:46, 13 December 2024)
- 05000278/LER-1992-007-03, :on 921004,discovered That Eight Daily Instrument Surveillance Checks Not Performed Per Ts,Due to Three Pages Inadvertently Excluded During Copying Process. Instrument Checks Performed & Acceptable + (08:01:48, 13 December 2024)