Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20115D979 + (04:26:03, 13 December 2024)
- JAFP-85-0324, Responds to NRC Re Violations Noted in Insp Rept 50-333/84-24.Corrective Actions:Section 4.8.26 of Procedure PSP-17 Will Be Revised by 851001 to Repeat Air Injection to Ensure Removal of Water from Coolant Dilution Sample Line + (04:26:04, 13 December 2024)
- ML20115D965 + (04:26:05, 13 December 2024)
- ML20115D935 + (04:26:06, 13 December 2024)
- ML20115D962 + (04:26:06, 13 December 2024)
- ELV-04056, Informs That Emergency Response Data Sys (ERDS) Implementation Has Been Completed,Per NUREG-1394.All Applicable Site Procedures Now in Place Along W/Appropriate Configuration Control for Physical Design Implemented + (04:26:07, 13 December 2024)
- ML20115D905 + (04:26:07, 13 December 2024)
- ML20115D898 + (04:26:08, 13 December 2024)
- ML20115D890 + (04:26:09, 13 December 2024)
- ML20115D878 + (04:26:09, 13 December 2024)
- RC-96-0150, Rev 1 to Special Rept Spr 960004,including Info Re Imperfection in SG B,For ISI Activity Completed on 960429 + (04:26:10, 13 December 2024)
- ML20115D867 + (04:26:11, 13 December 2024)
- ML20115D862 + (04:26:12, 13 December 2024)
- ML20115D857 + (04:26:13, 13 December 2024)
- 05000317/LER-1992-003, :on 920521,test Personnel Found MSIV Pipe Tunnel Fire Damper Inoperable Due to Surveillance Procedure Omission.Ts Equipment cross-reference Database Will Be Updated & Drawings Will Be Made More Specific + (04:26:14, 13 December 2024)
- ML20115D852 + (04:26:15, 13 December 2024)
- HL-5199, Responds to NRC Re Violations Noted in Insp Repts 50-321/96-06 & 50-366/96-06.C/A:procedure 34GO-OPS-066-0S Revised & TS Issues Associated W/Event Will Be Discussed in Regularly Scheduled Training for Licensed Operators + (04:26:16, 13 December 2024)
- 0CAN058202, Forwards Recent INPO Review of Emergency Preparedness Program.W/O Encl + (04:26:17, 13 December 2024)
- ML20115D762 + (04:26:19, 13 December 2024)
- ML20115D767 + (04:26:19, 13 December 2024)
- ML20115D757 + (04:26:20, 13 December 2024)
- PY-CEI-NRR-1557, Monthly Operating Rept for Sept 1992 for Perry Nuclear Power Plant,Unit 1 + (04:26:20, 13 December 2024)
- ML20115D730 + (04:26:21, 13 December 2024)
- ML20115D729 + (04:26:22, 13 December 2024)
- ML20115D716 + (04:26:22, 13 December 2024)
- ML20115D711 + (04:26:23, 13 December 2024)
- ML20115D704 + (04:26:24, 13 December 2024)
- RBG-20635, Forwards Partial Response to IE Bulletin 84-03,Item 4 Re Time to Cladding Damage W/O Operator Action & Item 6 Re Emergency Operating Procedures.Addl Info on Item 4 & Refueling Cavity Water Seal Evaluation Expected by 850515 + (04:26:25, 13 December 2024)
- 05000373/LER-1992-009-07, :on 920923,CR Ventilation Train Received Spurious Trip Signal from B Process Radiation Monitor Due to High Radiation Spike.Detector B Adjusted & Limited Procedure LLP-92-159 Implemented + (04:26:26, 13 December 2024)
- ML20115D696 + (04:26:27, 13 December 2024)
- PY-CEI-NRR-2069, Forwards NP059-0005, ISI Summary Rept for PNPP Unt 1. Rept Documents ISI Exam Activities Conducted from Return to Commercial Operation from Fourth Refueling Outage Until Completion of Fifth Refueling Outage + (04:26:28, 13 December 2024)
- BECO-LTR-96-066, Monthly Operating Rept for June 1996 for Pilgrim Nuclear Power Station + (04:26:31, 13 December 2024)
- ML20115D662 + (04:26:32, 13 December 2024)
- ML20115D682 + (04:26:32, 13 December 2024)
- ML20115D651 + (04:26:33, 13 December 2024)
- ML20115D644 + (04:26:34, 13 December 2024)
- ML20115D649 + (04:26:34, 13 December 2024)
- ML20115D639 + (04:26:35, 13 December 2024)
- ML20115D633 + (04:26:36, 13 December 2024)
- ML20115D634 + (04:26:36, 13 December 2024)
- L-96-014, Forwards Monthly Operating Reports for June 1996 for Point Beach Nuclear Plant Units 1 & 2 and Revised Rept for May 1996 + (04:26:37, 13 December 2024)
- ML20115D628 + (04:26:38, 13 December 2024)
- ML20115D608 + (04:26:39, 13 December 2024)
- ML20115D589 + (04:26:39, 13 December 2024)
- ML20115D582 + (04:26:40, 13 December 2024)
- ST-HL-AE-4230, Forwards Rev 5 to Chapter 1.0 of South Texas Project Electric Generating Station Operations QA Plan, Organization. Change Will Be Incorporated in Next Operations QA Plan Update + (04:26:41, 13 December 2024)
- 05000498/LER-1992-013, :on 920915,discovered That Portion of Containment Spray Channels Between Process Instrumentation & ESF Actuation Instrumentation Not Completely Verified.Caused by Inadequate Review.Procedures Revised + (04:26:42, 13 December 2024)
- ELV-04070, Forwards Proposed Wording Revs to Licenses NPF-68 & NPF-81, to Support 920918 Application for Amends to Licenses,Per Telcon W/Nrc.Wording Revs Refer to Latest Rev Dates in Physical Security Plan & Contingency Plan + (04:26:43, 13 December 2024)
- HL-2976, Forwards Proposed Wording Revs to Licenses DPR-57 & NPF-5, in Response to 920918 Application for Amends.Revs Refer to Latest Rev Dates of Physical Security Plan,Guard Training & Qualification Plan & Contingency Plan,Per Telcons W/Nrc + (04:26:44, 13 December 2024)
- RBG-20634, Forwards Interim Response to IE Bulletin 83-08, Electrical Circuit Breakers W/Undervoltage Trip Feature in Use in Safety-Related Applications.... Final or Interim Response Re Items 2b & 2d Will Be Provided by 850529 + (04:26:45, 13 December 2024)
- ML20115D553 + (04:26:46, 13 December 2024)